SourcingAI

4 person lift price

I have found results from90000+products and40000+suppliers about4 person lift price

Commonly Used:
US$
Customization Available
Sample Available
Manufacturer First
Product Attributes:
Type: Refrigeratory Elevator
Driving Type: AC Elevator
Center Opening Door
Position of Computer Room: up
Attendant: Without Attendant
Control Mode: Signal Control
Capacity: 500-1000kg
6 - 10
1.00 - 2.00m/s
Door Knife: Single
With Deceleration Device
Application: Workshop Crane
Lift Mechanism: Lift Chain
Carrying Capacity: Weight Level
Moves: Vehicular
Driven Type: Hydraulic
Running Mode: Stationary
Feature: Explosion-Proof
Certification: GS
Load Capacity: <1T
Usage: Construction Hoist
Sling Type: Chain
Lift Drive / Actuation: Electric Motor
Straight Fractional Door
Elevator Door: Sider Door
Without Computer Room
Attendant: With Attendant
Control Mode: Parallel Control
Control Mode: Group Control
Control Mode: Push-Button Control
Collective Selective Control
Capacity: <500kg
Persons: <5
11 - 19
2.00 - 3.50m/s
40M/Min - 60M/Min
Speed: <1.00m/s
Door Knife: Double
Without Deceleration Device
Application: Shipboard Crane
Application: Warehouse Crane
Application: Building Crane
Lift Mechanism: Scissor Lift
Carrying Capacity: Middle-Level
Moves: Stationary
Moves: Self-propelled
Driven Type: AC
Running Mode: Moving
Feature: Insulating
Certification: CE
Certification: RoHS
Certification: ISO 9001

Sourcing guidance for 4 Person Lift Price

How to determine the technical specifications for a 4-person lift?

When selecting a 4-person lift (typically rated for 320kg to 450kg), you must prioritize Machine Roomless (MRL) technology to save space. Ensure the drive system uses a Permanent Magnet Synchronous Gearless Traction Machine, which offers up to 40% energy savings and quieter operation. The cabin dimensions should ideally be at least 900mm x 1100mm to comfortably accommodate four adults.

What safety and compliance standards are mandatory for international procurement?

The lift must strictly adhere to EN81-20/50 (European Standards) or ASME A17.1 (US Standards). Ensure the supplier provides a CE Certification and a Type Examination Certificate for critical safety components like the overspeed governor, safety gear, and oil buffers. For the Chinese market and exports via Made-in-China.com, verify the GB 7588 compliance, which is the equivalent of international safety benchmarks.

What factors influence the total price of a 4-person lift?

The 'sticker price' is only one part of the cost. You must account for the travel height (number of floors), decoration level (stainless steel vs. glass observation), and control system brand (e.g., Monarch or STEP). Additionally, factor in installation supervision fees and spare parts packages, which can add 10-15% to the initial quote but are essential for long-term maintenance.

How can I evaluate the durability and performance of the elevator?

Request a VVVF (Variable Voltage Variable Frequency) door operator system, which ensures smooth and reliable door opening/closing cycles. Check the rated speed; for low-rise buildings, 1.0m/s is standard, while 1.6m/s or higher is needed for mid-rise. Ask for a component lifecycle report, specifically for the traction rope and inverter, to ensure a service life of 15-20 years.

Cross-Border Purchasing Considerations for Elevators

What are the primary risks when importing lifts from overseas?

The biggest risk is technical mismatch with local shaft dimensions. Always provide a certified hoistway layout drawing to the supplier before production. Another risk is shipping damage; ensure the contract specifies IPPC-standard seaworthy wooden crate packaging and includes All-Risk Marine Insurance to cover potential structural warping during transit.

How should I negotiate with suppliers on Made-in-China.com?

Focus on the warranty period and technical support. Negotiate for a 24-month parts warranty instead of the standard 12 months. Demand English-language installation manuals and 24/7 remote technical guidance. For bulk orders (3+ units), aim for a 5-8% discount or the inclusion of a free 2-year wear-parts kit (rollers, contactors, etc.).

What are the logistics and installation precautions for cross-border buyers?

Elevators are heavy and bulky; use FOB or CIF terms to manage costs effectively. Ensure your local team is ready for unloading with a forklift or crane. Crucially, confirm if the supplier can send an engineer for on-site commissioning or if they have a certified local partner in your country to sign off on the safety inspection required by your local government.

How to ensure transaction security for high-value industrial equipment?

Use Secured Trading Services on Made-in-China.com to protect your payment. Follow a 30-60-10 payment structure: 30% deposit, 60% after third-party pre-shipment inspection (like SGS or BV), and the final 10% after the lift arrives and passes a preliminary parts check. Never wire full payment before the Bill of Lading is verified.

Related queries