SourcingAI

500 ton truck crane

I have found results from40000+products and10000+suppliers about500 ton truck crane

Commonly Used:
US$
Customization Available
Sample Available
Manufacturer First
Product Attributes:
All Terrain Crane
Truck Mounted Crane
Type: Straight Arm
Type: Top-Slewing Crane
Type: Folding
Type: Railroad Crane
Boom Length: 80 meters
Control System: Remote Control
Drive Mode: Hydraulic System
Maximum Lifting Capacity: 500 tons
Certification: GS
Condition: Used
Maximum Lifting Height: >40m
Crane Jib: Four-Arm
Maximum Lifting Weight: >16t
Shaft Number: 3
Installation: Assembled
Moving Type: Fixed
Boom Length: 50 meters
Boom Length: 40 meters
Control System: Computerized Control
Control System: Manual Control
Drive Mode: Diesel Engine
Maximum Lifting Capacity: 50 tons
Certification: ISO9001
Certification: RoHS
Certification: CE
Condition: New
Maximum Lifting Height: 25-30m
Maximum Lifting Height: 30-40m
Maximum Lifting Height: 50-100m
Maximum Lifting Height: <10m
Crane Jib: Five-Arm
Crane Jib: Three-Arm
Maximum Lifting Weight: >10t
Maximum Lifting Weight: 14-16t
Maximum Lifting Weight: <2t
Shaft Number: 2

Sourcing guidance for 500 Ton Truck Crane

What are the key technical specifications to evaluate for a 500-ton truck crane?

When sourcing a heavy-lift crane, you must prioritize the Maximum Lifting Capacity (500t) and the Main Boom Length, which typically ranges from 80m to 100m. Ensure the crane features a high-strength U-shaped or oviform boom to minimize weight while maximizing structural rigidity. Additionally, verify the Engine Power (kW) and Torque to ensure the chassis can handle the gross vehicle weight during transit, and check for multi-axle steering systems (usually 7-9 axles) to guarantee maneuverability on construction sites.

Which safety and compliance standards are mandatory for international procurement?

For a 500-ton crane, compliance with ISO 9001 for manufacturing quality is a baseline. Depending on the destination, you must verify CE Marking for the European market, ANSI/ASME B30.5 for the United States, or GOST for Eurasian markets. It is critical to ensure the Load Moment Indicator (LMI) and Anti-Two Block systems are calibrated to international safety protocols to prevent structural failure or tipping during high-tonnage lifts.

How should a buyer assess the hydraulic and control systems of the crane?

Focus on the Hydraulic Pump and Valve brands; top-tier suppliers often integrate components from Rexroth or Kawasaki for precision. The control system should utilize CAN-bus technology for real-time diagnostics. Request information on the intelligent cooling system, which is vital for maintaining hydraulic pressure stability during prolonged heavy-lifting operations in extreme climates.

What are the typical usage scenarios for a crane of this capacity?

A 500-ton truck crane is primarily designed for large-scale infrastructure projects, such as bridge girder installation, wind turbine maintenance, and petrochemical plant assembly. Its mobility allows it to be deployed quickly across different sites compared to crawler cranes, making it ideal for urban construction where space for assembly is limited but high lifting capacity is required.

Cross-Border Procurement & Risk Management for Heavy Machinery

What are the primary risks when purchasing heavy machinery from overseas?

The most significant risks include Logistical Damage and Specification Mismatch. Due to the size of a 500-ton crane, it often requires disassembly for shipping. Ensure the contract includes a Pre-Shipment Inspection (PSI) by a third party like SGS or Intertek to verify that all components, including counterweights and jib extensions, are present and functional before the final payment is released.

How should shipping and delivery be handled for a 500-ton crane?

This equipment is typically shipped via RO-RO (Roll-on/Roll-off) or Breakbulk vessels. You must confirm the Incoterms; CIF (Cost, Insurance, and Freight) is common, but FOB (Free on Board) allows the buyer more control over the specialized heavy-lift carrier selection. Ensure the supplier provides a detailed Loading and Securing Plan to prevent shifting during maritime transit.

What strategies should be used for price negotiation and payment security?

Negotiate based on Total Cost of Ownership (TCO), including spare parts packages for the first 2,000 hours of operation. For payments, use a Letter of Credit (L/C) or Escrow services to ensure funds are only released upon the presentation of valid shipping documents and inspection certificates. On platforms like Made-in-China.com, look for Audited Suppliers to mitigate the risk of dealing with non-verified entities.

What after-sales support is necessary for such a complex machine?

A 500-ton crane requires on-site commissioning and operator training. Ensure the supplier commits to sending technical engineers to your location for the initial setup. The contract should specify a warranty period of at least 12 months or 2,000 working hours, and the supplier must guarantee the availability of critical spare parts in your region to minimize downtime.