SourcingAI

8 led blinder light

I have found results from4000+products and1000+suppliers about8 led blinder light

Commonly Used:
US$
Customization Available
Sample Available
Manufacturer First
Product Attributes:
Type: PAR64
Kind: Strobe Light
Application: Stage
IP Rating: IP65
Certification: CE
Emitting Color: White
Waterproof: Not Waterproof
Life: 50000h
Electric Current Type: AC
Diffuser: Borosilicate Glass
Shell Material: Aluminium Alloy
LED Chips: Epistar
Input Voltage: 220V
Light Source: LED
Material: Aluminum
Strobe: Electronic Strobe
Dmx Signal Control
Voltage: 220V
Kind: Dimming Lights
Kind: Spot Light
Kind: Screen Lights
Kind: Spotlight
Dance Effect Lights
Film and Television
IP Rating: IP20
IP Rating: IP44
Certification: RoHS
Certification: CCC
Certification: EMC
Certification: LVD
Emitting Color: Full Range
Emitting Color: Warm White
Emitting Color: Changeable
Emitting Color: Cool White
Emitting Color: Red
Diffuser: Polycarbonate
LED Chips: Osram
Material: Aluminum Alloy
Adjustable Speed Strobe
Master Slave Mode

Sourcing guidance for 8 Led Blinder Light

How to choose the right 8 LED Blinder Light for professional stage use?

Selecting a high-performance 8 LED Blinder requires focusing on COB (Chip on Board) technology, which provides a more uniform light output compared to traditional LEDs. Ensure the light offers individual cell control (pixel mapping) to create complex visual patterns. For professional stages, prioritize units with a Color Rendering Index (CRI) of ≥90 to ensure skin tones and stage sets appear natural under the warm white or amber glow.

What are the key technical specifications and compliance standards for international buyers?

Buyers must verify that the product carries CE, RoHS, and FCC certifications to ensure electrical safety and environmental compliance. Key technical benchmarks include a power consumption of 800W to 1000W for high-intensity output and DMX512 protocol compatibility for seamless integration with lighting consoles. Additionally, check for flicker-free operation (high PWM frequency), which is essential for broadcasting and video recording environments.

How can I evaluate the thermal management and durability of the fixture?

Since 8-eye blinders generate significant heat, look for fixtures with die-cast aluminum housing and intelligent temperature-controlled fans to extend the LED lifespan (typically rated at 50,000 hours). Inspect the IP rating; while IP20 is standard for indoor use, an IP65 rating is mandatory if the lights will be used for outdoor festivals or touring in humid conditions.

What functional features enhance the performance of LED blinders?

Top-tier models include linear dimming (0-100%) with multiple dimming curves to mimic the 'tungsten fade' effect. Look for strobe speeds of 1-25 fps and built-in auto-programs for quick setup. The inclusion of PowerCON in/out and 3-pin or 5-pin XLR connectors is vital for professional daisy-chaining and signal stability.

Cross-Border Procurement & Risk Management for Stage Lighting

What are the primary risks when importing LED stage lights from overseas?

The most common risks include shipping damage to sensitive optics and voltage incompatibility. Always confirm the universal voltage range (AC100-240V). To mitigate breakage, insist on flight case packaging rather than standard cartons for bulk orders, as this provides the necessary shock absorption for heavy 8-eye fixtures.

How should I negotiate with suppliers on Made-in-China.com for the best value?

Focus on Total Cost of Ownership (TCO) rather than just the unit price. Negotiate for spare parts (such as extra LED drivers or fans) to be included in the initial shipment (typically 1-2% of the order volume). For orders exceeding 50 units, aim for a 10-15% volume discount and request a factory audit video or third-party inspection to verify production capacity.

What are the best practices for secure transactions and shipping?

Utilize Secured Trading Services on Made-in-China.com to ensure payment is only released upon proof of shipment. For logistics, Sea Freight (LCL/FCL) is most economical for heavy lighting equipment, but ensure the supplier provides a Bill of Lading (B/L) and detailed packing list. For urgent event deadlines, Air Freight is faster but can increase costs by 30-50%.

How do I handle after-sales support and warranty claims across borders?

Establish a clear Warranty Agreement (ideally 2-3 years) before payment. Since returning heavy equipment is costly, ensure the supplier agrees to provide free replacement components and remote technical video support. Verify the supplier's response time (standard is <24 hours) to ensure your event schedules are not disrupted by technical failures.

Related queries