Cross flow turbine price
I have found results from3000+products and1000+suppliers aboutCross flow turbine price
150 Meters Water Head 630 Kw Hydro Pelton Turbine Generator
Cross Flow Kaplan Micro Hydro Turbine Generator
Low Water Head Cross Flow Turbine Small Hydro Turbine Water Turbine Generator Power Generator
Cross Flow Semi Welded Gasketed Plate Type Steam Turbine Oil Cooler Heat Exchanger
Micro Mini Francis Hydro Turbine Generation Power Plant Distributor Repair
Back-Pressure Industrial Steam Turbine for Driving Pumps (T530)
High-Efficiency Back Pressure Steam Turbine Generator for Power Generation (T580)
Condensing Steam Turbine Generator for Waste Heat Power Generation (T710)
Back-Pressure Steam Turbine Generator for Waste Heat Power Generation (T540)
Modular One-Key Start Industrial Steam Turbine (T541)
Used for Power Generation High-Efficiency Back-Pressure Steam Turbine Generator
High-Speed and High-Efficiency Back-Pressure Steam Turbine Generator for Power Generation (T581)
0.5MW-3MW EPC Project for Waste Heat Recovery Power Generation/ Steam Turbine Generator
1MW Condensing Steam Turbine for Power Generation (T562-1)
for Waste Incineration Power Generation, The Steam Turbine Employed
1.5MW Condensing Steam Turbine for Waste Heat Power Generation (T562-1.5)
for Heat Supply, Used to Drive Heat - Supply Network Circulating Water Pumps, Back - Pressure Steam Turbine (T160)
Condensing Steam Turbine Generator Set Suitable for The Climate in Russia
Back-Pressure Steam Turbine for Cogeneration in Distributed Power Stations
1MW Explosion-Proof Steam Turbine for Driving Petrochemical Oil Pumps
Biomass Power Generation Steam Turbine Suitable for The Climate in Southeast Asia
1MW Cogeneration Condensing Steam Turbine
500kw/1000kw/1500kw/2000kw Steam Turbine for Driving Pump
Hydropower Station Impact Type Runner, Francis Runner, Pipeline Turbine, Distributor
Sourcing guidance for Cross Flow Turbine Price
What technical specifications determine the price and efficiency of a Cross Flow Turbine?
The price is primarily driven by the rated head (H) and flow rate (Q). For B2B buyers, ensuring the turbine features a stainless steel runner (AISI 304 or 316) is critical for longevity against silt erosion. Efficiency typically ranges between 70-85%; however, a dual-cell (divided drum) design is essential if your water flow fluctuates seasonally, as it allows the turbine to maintain high efficiency even at 1/6 of the maximum flow.
Which compliance standards should be verified for international hydropower projects?
Suppliers should adhere to IEC 60193 for hydraulic machine acceptance tests and IEC 61116 for small hydropower equipment. Ensure the generator component carries CE, ISO 9001, or UL certification. For the structural housing, verify welding qualifications (AWS or EN standards) to prevent high-pressure leaks or structural failure over a 20-30 year lifespan.
How does the 'Price' correlate with the scope of supply in a B2B quote?
A 'low price' often indicates only the turbine runner and casing. A professional procurement package should include the turbine, synchronous/asynchronous generator, hydraulic governor (speed control), inlet valve (butterfly or ball valve), and the control panel (PLC-based). Always request a detailed Bill of Materials (BOM) to avoid hidden costs during site installation.
What are the typical usage scenarios for Cross Flow Turbines compared to other types?
Cross Flow turbines are the 'workhorses' for low to medium heads (5m to 100m) and are ideal for run-of-river projects where water levels vary. Unlike Kaplan or Francis turbines, they are self-cleaning and can handle silty water better, making them the most economically feasible choice for rural electrification and decentralized industrial power.
Cross-Border Procurement & Risk Management for Hydropower Equipment
What are the key risks when importing heavy machinery like turbines from China?
The primary risks include damage during maritime transit and technical mismatch. Use Made-in-China.com's Secured Trading services to ensure payment is only released upon verification. Ensure the supplier uses seaworthy vacuum packaging and reinforced wooden crates to prevent corrosion from salt air and physical impact during crane handling.
How should I negotiate with suppliers to ensure long-term reliability?
Focus negotiations on the warranty period and wear-parts package. Aim for a minimum 24-month warranty and insist on the inclusion of two sets of spare bearings and seals. Requesting a Factory Acceptance Test (FAT) via video link or a third-party inspector (like SGS) before final payment is a standard industry safeguard.
What shipping and logistics considerations apply to turbine units?
Turbines are heavy and dense. FOB (Free On Board) is recommended if you have a reliable freight forwarder, but DDP (Delivered Duty Paid) can simplify the process for first-time buyers. Ensure the supplier provides a Packing List with HS Code 8410 (Hydraulic turbines/water wheels) to accurately calculate import duties in your specific country.
How can I verify the credibility of a turbine manufacturer on Made-in-China.com?
Look for 'Audited Suppliers' who have undergone on-site inspections. Check their export history to your region; a supplier familiar with your local grid frequency (50Hz vs 60Hz) and voltage requirements is less likely to deliver incompatible electrical components.





























