SourcingAI

evaporator bending machine

I have found results from5000+products and2000+suppliers aboutevaporator bending machine

Commonly used:
US$
Customization Available
Sample Available
Manufacturer First
Product attributes:
CNC Pipe and Tube Bending Machine
Hydraulic Pipe and Tube Bending Machine
Type: Beading Machine
Coiling Bending Machine
Type: Hydraulic Machine
Pipe and Tube Bending Machine
Automation: Automatic
Warranty: 1 Year
Applicable Material: Aluminum
Applicable Shape: Square
Automatic Grade: Full-Automatic
Condition: New
Suitable for: Aluminum
Certification: RoHS
Forging Forming Method: Mold Forging
Power Source: Hydraulic Pressure
Feature: Automation
Customized: Customized
Advantage: Simple Structure
Automation: Semi-Automatic
Warranty: 2 Years
Warranty: 1-year
Warranty: 12 Months
Applicable Material: Stainless Steel
Applicable Material: Copper
Applicable Shape: Round
Applicable Shape: Oval
Suitable for: Copper
Certification: ISO 9001:2000
Certification: ISO 9001:2008
Certification: CE
Certification: CCC
Certification: ISO9001

Sourcing guidance for Evaporator Bending Machine

What are the key technical specifications to consider when selecting an Evaporator Bending Machine?

When sourcing an evaporator bending machine, you must prioritize bending precision (typically ±0.5mm) and angle accuracy (±0.5°) to ensure the heat exchanger fits perfectly into the final unit. Key components to inspect include the servo motor system for consistent torque, the PLC control system (e.g., Siemens or Mitsubishi) for programmable logic, and the hydraulic or pneumatic clamping force to prevent tube deformation. Ensure the machine supports the specific tube diameters (e.g., 7mm, 9.52mm, or 12.7mm) and fin types used in your production line.

How do I ensure the machine is compatible with different evaporator designs?

Look for machines with modular tooling and quick-change molds, which allow for rapid switching between different product dimensions. High-end models feature multi-radius bending capabilities and adjustable pitch settings. It is essential to verify if the software supports CAD/CAM integration, enabling you to import design files directly to reduce manual programming errors and setup time.

What compliance and safety standards are mandatory for this industrial equipment?

For international trade, the machine must carry the CE Marking for the European market or meet UL/OSHA standards for the United States. Safety features are non-negotiable: ensure the unit includes emergency stop buttons, light curtain sensors for operator protection, and overload protection circuits. Additionally, check for ISO 9001 certification of the manufacturer to guarantee standardized production processes.

What is the typical maintenance requirement for an Evaporator Bending Machine?

To maintain long-term accuracy, the machine requires daily lubrication of moving guide rails and weekly inspection of hydraulic fluid levels. The bending dies and mandrels should be checked for wear every 50,000 cycles to prevent surface scratches on the copper or aluminum tubes. Most professional suppliers on Made-in-China.com provide a detailed maintenance manual and a 1-2 year warranty on core components.

Cross-Border Procurement Considerations for Industrial Machinery

How can I mitigate the risk of receiving a machine that does not meet performance expectations?

Always conduct a Factory Acceptance Test (FAT). Request the supplier to provide a video of the machine running a trial production using your specific tube samples. For high-value orders, hire a third-party inspection agency (like SGS or Intertek) to verify the machine's specifications and safety functions before the final balance payment is made.

What are the best strategies for negotiating with industrial equipment suppliers?

Focus on the Total Cost of Ownership (TCO) rather than just the sticker price. Negotiate for the inclusion of vulnerable spare parts (e.g., sensors, seals, and blades) for the first two years of operation. Additionally, request technical training for your engineers—either via video conferencing or on-site—as part of the purchase package to ensure smooth commissioning.

What should I consider regarding international shipping and installation?

Due to the weight and precision of the machine, it must be shipped in a vacuum-sealed anti-rust wrap and secured in a solid fumigated wooden crate. Use FOB or CIF terms to clearly define risk transfer. Ensure the supplier provides a foundation drawing in advance so your facility is prepared for installation the moment the container arrives.

How do I ensure transaction security when purchasing from overseas?

Utilize secure payment methods and prioritize suppliers with a high 'Audit Reports' status on Made-in-China.com. This ensures the company has been physically verified. Always use a staged payment structure: typically 30% deposit, 60% after successful FAT, and 10% after arrival/installation to maintain leverage throughout the process.

Related queries