SourcingAI

Sanitary napkin line price

I have found results from50000+products and10000+suppliers aboutSanitary napkin line price

Commonly Used:
US$
Customization Available
Sample Available
Manufacturer First
Product Attributes:
Type: Drum Type
Type: Box Type
Filling and Sealing Machine
Real Running speed: 500-600PCS/min
Automatic Grade: Automatic
Certification: CE
Condition: New
Control: Automatic
Embossing Type: Full-Embossing
Embossing Roller: Rubber Roller
Toilet Paper Type: With Core
Function: Multi-Function
Skin Care Products
Forming Species: Bag Moulding
Forming Function: Filling
Driven Type: Electric
Material Type: Solid
Packaging: Bag
Packaging Material: Bamboo, Wood
Product Object: Infant
Designed Speed: >400pcs/min
Production Speed: >400pcs/min
Computer Control Panel
Product Specification: Large
Real Running speed: 600-700PCS/min
Real Running speed: 350-400PCS/min
Real Running speed: >800PCS/min
Real Running speed: 700-800PCS/min
Automatic Grade: Full Automatic
Certification: RoHS
Certification: ISO
Certification: CCC
Certification: SAA
Certification: C-tick
Certification: NOM
Certification: PSE
Certification: GOST
Certification: EMC
Certification: E-Mark
Certification: ISO 9001:2000
Certification: ISO 9001:2008
Condition: Used
Forming Function: Forming
Forming Function: Seal
Packaging Material: Film
Product Object: Adult
Production Speed: 150-400pcs/min

Sourcing guidance for Sanitary Napkin Line Price

What are the key technical specifications to consider when evaluating a sanitary napkin production line?

When investing in a production line, the most critical factor is the production speed, typically ranging from 500 to 1200 pieces per minute. You must ensure the machine features a Full-Servo Control System, which allows for higher precision, lower noise, and reduced waste compared to semi-servo or mechanical systems. Additionally, verify the product structure capability, such as the ability to produce both ultra-thin and fluff pulp types, and the integration of SAP (Super Absorbent Polymer) dosing systems with an accuracy error of less than ±5%.

How do I ensure the production line meets international safety and quality standards?

For cross-border procurement, the equipment must hold a CE Certification to meet European safety standards or comply with UL standards for North America. It is essential to check if the manufacturer follows ISO 9001:2015 quality management systems. Furthermore, ensure the machine's safety protection system includes emergency stop buttons, safety shields with sensors, and automatic rejection units for defective products to maintain high-quality output and operator safety.

What are the requirements for raw material compatibility and automation?

A high-quality line should offer automatic tension control and auto-splicing units for raw materials like non-woven fabrics, PE film, and release paper, which prevents machine downtime during roll changes. The system should be equipped with a PLC (Programmable Logic Controller) and a Touch Screen HMI (Human-Machine Interface) for easy parameter adjustment. Ensure the supplier provides a Vision Inspection System to automatically detect and reject products with stains or structural defects.

What is the economic feasibility and ROI (Return on Investment) for this equipment?

Calculate the Total Cost of Ownership (TCO), including the initial purchase price, energy consumption (kW/h), and the cost of wear-and-tear parts (like cutting blades and sealing rollers). A high-efficiency line can reduce material wastage to below 3%, significantly impacting long-term profitability. Buyers should also consider the installation and commissioning costs, which usually involve the supplier sending engineers to the site for 7-15 days.

Cross-Border Procurement Risks and Strategies

How can I mitigate the risks of purchasing heavy machinery from overseas?

To minimize risk, always conduct a Factory Audit or hire a third-party inspection agency (like SGS or Intertek) to verify the supplier's manufacturing capacity. Use Secure Payment Terms such as a Letter of Credit (L/C) or Trade Assurance through reputable platforms like Made-in-China.com to ensure funds are only released upon proof of shipment. Never pay 100% upfront; a standard industry practice is 30% deposit and 70% balance after successful FAT (Factory Acceptance Test).

What should be included in the negotiation with the supplier regarding after-sales service?

Negotiate for a warranty period of at least 12 to 24 months. Ensure the contract specifies Remote Technical Support via video call and the availability of spare parts for at least 5 years. It is highly recommended to request a 'Wear-Parts Package' to be included in the initial shipment to avoid production halts due to minor component failures. Confirm if the supplier provides OEM/ODM customization for specific napkin shapes or packaging styles.

What are the logistics and installation precautions for shipping to a specific country?

Due to the size of the machinery, it is usually shipped in 40HQ containers. Ensure the equipment is treated with anti-rust oil and wrapped in vacuum plastic packaging to prevent corrosion during sea transit. For customs clearance, verify that the HS Code (typically 84418000) is correct to avoid tariff penalties. For the final destination, ensure your facility has the required power load (e.g., 380V/50Hz/3Phase) and an air compressor system ready before the machine arrives.

Related queries