SourcingAI

Two-story prefab house

I have found results from50000+products and10000+suppliers aboutTwo-story prefab house

Commonly Used:
US$
Customization Available
Sample Available
Manufacturer First
Product Attributes:
Type: Multi-Storey Warehouse
Type: Row Villa
Application: Office
Fast Installation: Fast Installation
Feature: Earthquake Resistant
Material: Sandwich Panel
Certification: CE
Customized Or Not: Customized
Finished Goods Warehouse
Architecture: Modern Style
Certificate: CE
Design Style: European Style
Application: Apartment
Application: Villa
Application: Hotel
Fast Installation: Standard Installation
Feature: Easily Movable
Feature: Eco-Friendliness
Feature: Flexibly Combinable
Feature: Leak Proof
Feature: Moisture Proof
Feature: Safe
Feature: Thermal Insulation
Feature: Waterproof
Feature: Wind Resistance
Material: Container
Material: Steel Structure
Certification: ISO9001
Certificate: ISO
Certificate: UL
Design Style: Modern

Sourcing guidance for Two-story Prefab House

What are the key structural materials and standards for a high-quality two-story prefab house?

The structural integrity of a two-story prefab house depends on the Galvanized Steel Frame (typically Q235 or Q345 grade) which must be treated for anti-corrosion. For the walls, Sandwich Panels (EPS, Rock Wool, or PU) are essential; Rock Wool is highly recommended for its Class A fire resistance and superior thermal insulation. Ensure the floor system uses Fiber Cement Board or MGO board with a thickness of at least 18mm to support the load-bearing requirements of the second floor.

How should buyers evaluate the wind and seismic resistance of these structures?

Buyers must verify that the design complies with local building codes. A standard high-quality prefab house should withstand Wind Loads of 0.6KN/㎡ (approx. 120km/h) and Seismic Intensity of Grade 7 to 8. Request a Structural Calculation Report from the supplier to ensure the steel column thickness and bracing systems are sufficient for a two-story configuration.

What are the essential compliance and certification requirements for international markets?

For the European market, CE Certification and compliance with Eurocodes are mandatory. US buyers should look for ASTM standards and local state-level modular building approvals. Globally, ISO 9001 for manufacturing quality and ISO 14001 for environmental management are benchmarks of a reliable supplier. Always ensure the electrical and plumbing components (wires, sockets, pipes) carry certifications like UL, SAA, or CE to match your destination country's grid.

What customization options are typically available for B2B buyers?

Most professional suppliers offer Modular Flexibility, allowing you to adjust the floor plan, window placement, and exterior cladding (such as PVC, wood-plastic composite, or metal carved boards). You can also request Integrated Kitchens and Bathrooms to be pre-installed or pre-piped to reduce on-site labor costs. Ensure the supplier provides CAD and 3D architectural drawings for your approval before production.

Cross-Border Procurement & Logistics Strategy

How can I mitigate the risks of purchasing a prefab house from overseas?

The primary risk is a mismatch between the product and local building regulations. Conduct a factory audit or hire a third-party inspector (like SGS or Intertek) to verify the production process. Use Trade Assurance or Letters of Credit (L/C) to secure your payment. For sourcing, platforms like Made-in-China.com provide verified supplier profiles and audit reports to help filter out unreliable intermediaries.

What is the most cost-effective shipping method for a two-story prefab house?

Prefab houses are usually shipped in 40ft HQ (High Cube) containers. Depending on the design, you can choose Flat Pack (4 units per container) or Knock-Down (CKD) kits to maximize space. For a two-story house, ensure the staircase and large glass panels are packed in steel frames or wooden crates to prevent breakage during sea transit. Always clarify the Incoterms; CIF is convenient, but FOB allows you more control over the shipping timeline and costs.

What should be considered regarding on-site assembly and technical support?

A two-story house requires a crane for installation. Confirm if the supplier provides a detailed installation manual, video tutorials, or online technical guidance. For large-scale projects, negotiate to have the supplier send a technical supervisor to the site. Ensure all fasteners, bolts, and waterproof glue are included in the package, as sourcing specific industrial hardware locally can cause significant delays.

Related queries