SourcingAI

Welding fixture table

I have found results from10000+products and5000+suppliers aboutWelding fixture table

Commonly Used:
US$
Customization Available
Sample Available
Manufacturer First
Product Attributes:
Type: Welding Fixture
Type: Soldering Station
Structure: Platform
Rotaion Speed: 0.2-2rpm
Max Eccentricity Distance: 250mm
Tilting Angle: 0-135°
Voltage: 110V/220V
Welding Turning Rolls Type: Self-Adjusting
Welding Tilter Type: Flexible Combination
Condition: New
Structure: Gantry
Rotaion Speed: 0.3-3rpm
Max Eccentricity Distance: 100mm
Max Eccentricity Distance: 150mm
Tilting Angle: 0-90°
Welding Turning Rolls Type: Adjustable
Welding Turning Rolls Type: Non-Self-Adjusting
Welding Turning Rolls Type: Channeling
Welding Tilter Type: Traditional Special

Sourcing guidance for Welding Fixture Table

How to choose the right material and surface treatment for a welding fixture table?

For professional industrial use, prioritize D2 or Q355 steel for high tensile strength. To prevent welding spatter from sticking, ensure the table surface has undergone Nitriding (Plasma Nitriding) or Oxidation treatment. This increases surface hardness to 550-800 HV, significantly extending the lifespan and maintaining the flatness tolerance (typically within 0.1mm per meter).

What are the standard hole systems and why do they matter?

The two industry standards are D16 (16mm holes with 50mm spacing) and D28 (28mm holes with 100mm spacing). Choose D16 for light-duty, precision work like electronics or thin-walled tubing, and D28 for heavy-duty structural steel welding. Ensure the hole grid is CNC machined to guarantee compatibility with standard clamping accessories.

What load-bearing and structural specifications should B2B buyers verify?

Verify the static load capacity, which should be at least 2,000kg to 5,000kg for industrial tables. Check for reinforcing ribs on the underside of the tabletop to prevent sagging under heat and weight. For large-scale projects, look for modular 3D tables that allow for connecting multiple units to expand the working area.

Which compliance and quality standards are essential for international procurement?

Suppliers should ideally hold ISO 9001 certification for quality management. Since these are heavy industrial tools, ensure the manufacturer provides a Material Test Report (MTR) and a Flatness Inspection Certificate. If the table includes electrical components (like hydraulic lifting), CE or UL certification is mandatory for the EU or US markets.

Cross-Border Purchasing Considerations for Welding Tables

How can I mitigate the risk of rust and damage during long-distance sea freight?

Welding tables are highly susceptible to corrosion from sea air. Require the supplier to apply heavy-duty anti-rust oil and use VCI (Vapor Corrosion Inhibitor) plastic wrapping. The product must be secured in a fumigated solid wood crate with steel strapping to prevent shifting, as any impact can compromise the table's precision flatness.

What is the most cost-effective way to ship these heavy items?

Due to the extreme weight, Sea Freight (LCL or FCL) is the only economically feasible option. To optimize costs, consider purchasing clamping kits and accessories from the same supplier to fill the container volume. Use FOB (Free On Board) terms if you have a reliable forwarder, or CIF (Cost, Insurance, and Freight) if you want the supplier to handle the risk until the destination port.

How do I verify the supplier's technical capability before placing a bulk order?

Request a video factory audit focusing on their CNC boring and milling machines. A supplier's ability to maintain precision depends on their equipment. On platforms like Made-in-China.com, look for 'Audited Suppliers' who have had their production facilities verified by third-party organizations like SGS or TÜV Rheinland.

What are the common pitfalls in negotiating payment and lead times?

Standard terms are 30% deposit and 70% balance against the Bill of Lading (B/L). Avoid paying 100% upfront. For custom-sized tables, lead times are usually 20-35 days. Ensure the contract includes a penalty clause for delays and a quality guarantee period (typically 12-24 months) covering structural integrity and surface defects.

Related queries