Powered by Made-in-China.com
Adjustable Height Quick Release Segmental Girder Formwork Cost Effective Solution
US$600.00-1,800.0060 Tons
Adjustable Height Quick Release Segmental Girder Formwork Cost Effective Solution
US$1,800.00
60-9,999 Tons
US$600.00
10,000+ Tons
Sample price:US$1000.00/piece.Request sample
Product profile
Customization
AvailableAfter-sales Service
1-Year Warranty, Lifetime Paid ServiceWarranty
12 MonthsModel NO.
Segmental Girder FormworkCertification
ISO, ROHSMaterial
Steel Q235 or Q345bType
Segmental Gride FormworkManufacturing Process
Welded Steel FabricationApplication Field
Highway, Railway and Bridge ConsFormwork System
Customized Segmental Girder FormwoSurface Treatment
T According to Project RequirementProduct Application
Precast Segmental Bridge GirdeTransport Package
Steel Frame or Customized PackingSpecification
Custom Sizes Based on Engineering DrawingsTrademark
HUANYUOrigin
Shandong, ChinaHS Code
847480200Key features
High load-bearing capacity fast assembly disassembly excellent sealing prevents slurry leakage stable performance for various segmental girder concrete casting work
Precise dimension control smooth concrete surface strong deformation resistance easy cleaning repeated use for segmental girder formwork projects
Lightweight modular design safe operation short construction cycle good rigidity adapting to different segmental girder pouring demands
Company profile

CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedR&D Capacity: ODM Service Available & OEM Service Available CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc. CertifiedExport Year: 10 Years CertifiedNearest Port: Qingdao PortAverage Response Time: >24h
About Our Factory & Business Background
AddressTianzhuang Town, Huantai County, Zibo, Shandong, China
Plant Area88433.37 square meters
Number of Employees188
Registered Capital60,000,000 RMB
Terms of PaymentLC, T/T
International Commercial Terms(Incoterms)FOB, CIF, CFR, EXW
Average Lead TimePeak Season Lead Time: one month, 1-3 months Off Season Lead Time: one month, 1-3 months
Minimum Order Quantity1
Supply Chain Partners50
Our Production Capability & Technical Expertise
Main ProductsBridge Formwork, Steel Formwork, Custom Steel Formwork, Bridge Pier Formwork, Precast Girder Formwork, Box Girder Formwork, U Girder Formwork, Pier Column Formwork, Segmental Bridge Formwork
Production Lines2
Production MachinesLaser Cutting Machine, Arc press machine, Circular saw cutting machine, CNC drilling machine, CNC lathe, CNC plasma cutting machine, CNC punching machine, CNC shearing machine, Long strip CNC punching machine, Planer and milling machine, Punch press, Shot blasting machine, Strip cutting machine, Welding robot
QA/QC inspectors6 people
Inspection Type for Finished Products100% inspection(Visual inspection & Function inspection)
Inspection Method for Finished ProductsHave instructions and uniformly followed
R&D Engineers6 people
Traceability of Raw MaterialsYes
Own BrandYes
Our Industry Experience & Global Business Record
Year of Establishment1995-12-14
Main MarketsEurope, Southeast Asia/ Mideast, Domestic
Repeat Buyers Choice< 10%
Number of Foreign Trading Staff5
Overseas Agent/BranchNo
New Products Launched in Last yearYes
Our Certifications, Standards & Industry Recognition
Management System CertificationISO9001:2015, ISO14001, ISO45001:2018
Cooperated with Fortune 500Yes
Product Q&A
Q:Q: How to arrange after-sales personnel?
A:
1. Installation, commissioning and handoverThe minister of the after-sales service department shall conduct on-site command and coordination. One level-1 foreman, one installation team leader, 4-6 installation workers and 1-2 hydraulic system installation engineers will be assigned on site. All professional installers shall be scheduled reasonably according to the site progress.
2. After-sales service
When the customer raises an after-sales request, professional after-sales personnel will be di
Q:Q: What are the forms of regular follow-up visits?
A:
A: Regular follow-up by sales staff: During product shipment and installation, track shipment and installation progress daily to guarantee the schedule. Within the first 3 months after the product is put into normal operation, conduct at least 2 follow-up visits by phone or on-site each month.
After the product has been on site for 3 months, maintain at least 1 follow-up visit by phone or on-site each month.
Regular follow-up by after-sales staff: After installation staff obtain customer accept
Send Inquiry
*To:
Shandong Zibo Huanyu Bridge Formwork Co., Ltd.
Shandong Zibo Huanyu Bridge Formwork Co., Ltd.*Content:
0/4000
Supplier replies will be sent to your registered email
You may also like
Corrugated Steel Shell Caisson Formwork Quick Release Guide Ring Cost Effective Solution
US$900.00-1,600.00
60 Tons(MOQ)
Demountable Design Rib Stiffener Segmental Girder Formwork Cost Effective Solution
US$600.00-1,800.00
60 Tons(MOQ)
Adjustable Height Caisson Formwork Quick Release Water Stop Plate Low Maintenance Cost
US$900.00-1,600.00
60 Tons(MOQ)
Flexible Assembly Segmental Girder Formwork Cost Effective Solution Stiffened Panel Best Price
US$600.00-1,800.00
60 Tons(MOQ)
Cost-Effective Adjustable Plastic Column Formwork Solution for Concrete Construction
US$5.00-50.00
180 Square Meters(MOQ)
Heavy Duty Quick Install Wall Formwork for Cost-Effective Solutions
US$75.00-129.00
100 Square Meters(MOQ)
Hot-Selling Reusable Timber Beam Adjustable Arced Formwork for Cost-Effective Construction Solutions
US$140.00-200.00
1,000 Square Meters(MOQ)
Reusable Concrete Steel Formwork with Quick-Release Mechanism Cost-Effective for Slab Beam Wall Column
US$40.00-100.00
300 Square Meters(MOQ)
Lianggong Cost-Effective Quick Assemble Adjustable Steel Frame Wall Column Formwork for General Construction Works
US$60.00-70.00
100 Square Meters(MOQ)
Height Adjustable Steel Concrete Column Sell Girder Metal Formwork System for Walls and Slabs
US$70.00-135.00
100 Pieces(MOQ)
Cost-Effective Adjustable Aluminum Wall Formwork for Wall Construction Wholesale Concrete Wall Formwork Manufacturer
US$110.00-200.00
300 Square Meters(MOQ)
Advanced Lightweight Wall Formwork for Cost-Effective Construction Solutions
US$75.00-129.00
100 Square Meters(MOQ)
Cost-Effective Formwork System Green Slab Formwork for Sustainable Solutions
US$85.00-110.00
250 Square Meters(MOQ)
Innovative Formwork Solutions for Strong and Cost-Effective Walls
US$75.00-129.00
100 Square Meters(MOQ)
Tailored Wall Formwork Solutions for Cost-Effective Construction Projects
US$700.00-720.00
1 Piece(MOQ)
Tailored Lightweight Formwork Options for Cost-Effective Building Solutions
US$75.00-129.00
100 Square Meters(MOQ)
Lightweight Cost-Effective Adjustable Column Plastic Concrete Formwork for Construction Site
US$6.00-66.00
180 Square Meters(MOQ)
Innovative Adjustable Table Formwork for Quick Assemble and Reusable Slab Formwork Solutions
US$900.00-1,300.00
10 Tons(MOQ)



















