Powered by Made-in-China.com
Light Weight Box Girder Formwork Quick Release for Bridge Construction Wholesale Price
US$900.00-1,800.0060 Tons
Light Weight Box Girder Formwork Quick Release for Bridge Construction Wholesale Price
US$1,800.00
60-59,999 Tons
US$900.00
60,000+ Tons
Product profile
Customization
AvailableAfter-sales Service
1-Year Warranty, Lifetime Paid ServiceWarranty
12 MonthsModel NO.
Large Box Girder FormworkCertification
ISO, ROHSMaterial
SteelType
Box Girder Steel FormworkApplication
Precast Concrete Box GirdersManufacturing Process
Welded Steel FabricationFormwork Components
Customized Box Girder Steel FormwSurface Treatment
According to Project RequirementMovement System
Subject to Agreed Scope of SupplyDesign Service
Customized Based on Client DrawingApplication Field
Highway, Railway and Bridge ConTransport Package
Steel Frame or Customized PackingSpecification
Customized According to Project DrawingsTrademark
HUANYUOrigin
Shandong, ChinaHS Code
84806000Production Capacity
100000+Pieces/YearKey features
Customized Design Available
We make T-girder, U-girder, box girder and segmental bridge formwork according to your construction drawings.
High Precision & Stable Structure
CNC cutting and standard welding guarantee low deformation during concrete pouring.
Easy Assembly & Demoulding
Modular hydraulic structure, fast installation on precast beam yard, saving working hours.
Full Technical Support
Engineers provide drawing review, remote guidance and on-site installation service.
Company profile

CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedR&D Capacity: ODM Service Available & OEM Service Available CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc. CertifiedExport Year: 10 Years CertifiedNearest Port: Qingdao PortAverage Response Time: >24h
About Our Factory & Business Background
AddressTianzhuang Town, Huantai County, Zibo, Shandong, China
Plant Area88433.37 square meters
Number of Employees188
Registered Capital60,000,000 RMB
Terms of PaymentLC, T/T
International Commercial Terms(Incoterms)FOB, CIF, CFR, EXW
Average Lead TimePeak Season Lead Time: one month, 1-3 months Off Season Lead Time: one month, 1-3 months
Minimum Order Quantity1
Supply Chain Partners50
Our Production Capability & Technical Expertise
Main ProductsBridge Formwork, Steel Formwork, Custom Steel Formwork, Bridge Pier Formwork, Precast Girder Formwork, Box Girder Formwork, U Girder Formwork, Pier Column Formwork, Segmental Bridge Formwork
Production Lines2
Production MachinesLaser Cutting Machine, Arc press machine, Circular saw cutting machine, CNC drilling machine, CNC lathe, CNC plasma cutting machine, CNC punching machine, CNC shearing machine, Long strip CNC punching machine, Planer and milling machine, Punch press, Shot blasting machine, Strip cutting machine, Welding robot
QA/QC inspectors6 people
Inspection Type for Finished Products100% inspection(Visual inspection & Function inspection)
Inspection Method for Finished ProductsHave instructions and uniformly followed
R&D Engineers6 people
Traceability of Raw MaterialsYes
Own BrandYes
Our Industry Experience & Global Business Record
Year of Establishment1995-12-14
Main MarketsEurope, Southeast Asia/ Mideast, Domestic
Repeat Buyers Choice< 10%
Number of Foreign Trading Staff5
Overseas Agent/BranchNo
New Products Launched in Last yearYes
Our Certifications, Standards & Industry Recognition
Management System CertificationISO9001:2015, ISO14001, ISO45001:2018
Cooperated with Fortune 500Yes
Product Q&A
Q:Q: How to arrange after-sales personnel?
A:
1. Installation, commissioning and handoverThe minister of the after-sales service department shall conduct on-site command and coordination. One level-1 foreman, one installation team leader, 4-6 installation workers and 1-2 hydraulic system installation engineers will be assigned on site. All professional installers shall be scheduled reasonably according to the site progress.
2. After-sales service
When the customer raises an after-sales request, professional after-sales personnel will be di
Q:Q: What are the forms of regular follow-up visits?
A:
A: Regular follow-up by sales staff: During product shipment and installation, track shipment and installation progress daily to guarantee the schedule. Within the first 3 months after the product is put into normal operation, conduct at least 2 follow-up visits by phone or on-site each month.
After the product has been on site for 3 months, maintain at least 1 follow-up visit by phone or on-site each month.
Regular follow-up by after-sales staff: After installation staff obtain customer accept
Send Inquiry
*To:
Shandong Zibo Huanyu Bridge Formwork Co., Ltd.
Shandong Zibo Huanyu Bridge Formwork Co., Ltd.*Content:
0/4000
Supplier replies will be sent to your registered email
You may also like
Songmao Light Weight Plastic Formwork Column Formwork for Construction Formwork System
US$8.90-15.00
100 Pieces(MOQ)
Songmao Plastic Formwork Light Weight Plastic Panel Formwork for Wall and Column Construction
US$8.90-15.00
100 Pieces(MOQ)
Light Weight Reusable Modular Adjustable Building Column Plastic Formwork for Concrete Construction
US$8.90-15.00
100 Pieces(MOQ)
Light Weight Reusable Modular Adjustable Building Column Plastic Formwork for Concrete Construction ABS PP
US$20.00-26.00
100 Square Meters(MOQ)
Hot Sale Wall Stable Steel for Concrete Light-Weight Panel Construction Frame Formwork
US$138.00-256.00
100 Square Meters(MOQ)
Hot Sale Strong Frame Light-Weight Panel Construction Steel for Concrete Wall Formwork
US$138.00-256.00
100 Square Meters(MOQ)
Light Weight Aluminum Frame Formwork for Concrete Wall Slab Building Wholesale Manufacturer
US$16.99-59.99
10 pieces(MOQ)
Aluminum Frame Formwork Economic Solutions for Wall Construction Wholesale Light Weight Aluminum Frame Formwork Concrete Wall Formwork Manufacturer
US$99.00-130.00
100 Square Meters(MOQ)
Light Weight One Side Bracket Single Side Formwork for Retaining Wall Concrete Construction
US$175.00-190.00
200 Square Meters(MOQ)
Adjustable Height Reusable Panel Box Girder Formwork Stable Shape Retention Quick Release
US$900.00-1,800.00
60 Tons(MOQ)
Fineform Light Weight One Side Bracket Single Sided Formwork for Retaining Wall Concrete Construction
US$175.00-190.00
200 Square Meters(MOQ)
Self Aligning Box Girder Formwork Fast Assembly Speed for Bridge Construction
US$900.00-1,800.00
60 Tons(MOQ)
Hot Sale Box Girder Zulin Formwork Construction Bridge
US$150.00-240.00
200 Square Meters(MOQ)
Fast Assembly Light-Duty Steel Frame Concrete Wall Formwork Panel OEM Custom Modular Wedge Pin Quick-Release System for Rapid Construction Project
US$70.00-120.00
300 Square Meters(MOQ)
Reinforced Frame Highway Box Girder Formwork Upper Working Deck for Bridge Construction
US$900.00-1,800.00
60 Tons(MOQ)



















