Powered by Made-in-China.com
Self Aligning Smooth Surface Box Girder Formwork Easy Operation Welded Structure
US$900.00-1,800.0060 Tons
Self Aligning Smooth Surface Box Girder Formwork Easy Operation Welded Structure
US$1,800.00
60-59,999 Tons
US$900.00
60,000+ Tons
Product profile
Customization
AvailableAfter-sales Service
1-Year Warranty, Lifetime Paid ServiceWarranty
12 MonthsModel NO.
Large Box Girder FormworkCertification
ISO, ROHSMaterial
SteelType
Box Girder Steel FormworkApplication
Precast Concrete Box GirdersManufacturing Process
Welded Steel FabricationFormwork Components
Customized Box Girder Steel FormwSurface Treatment
According to Project RequirementMovement System
Subject to Agreed Scope of SupplyDesign Service
Customized Based on Client DrawingApplication Field
Highway, Railway and Bridge ConTransport Package
Steel Frame or Customized PackingSpecification
Customized According to Project DrawingsTrademark
HUANYUOrigin
Shandong, ChinaHS Code
84806000Production Capacity
100000+Pieces/YearKey features
Customized Design Available
We make T-girder, U-girder, box girder and segmental bridge formwork according to your construction drawings.
High Precision & Stable Structure
CNC cutting and standard welding guarantee low deformation during concrete pouring.
Easy Assembly & Demoulding
Modular hydraulic structure, fast installation on precast beam yard, saving working hours.
Full Technical Support
Engineers provide drawing review, remote guidance and on-site installation service.
Company profile

CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedR&D Capacity: ODM Service Available & OEM Service Available CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc. CertifiedExport Year: 10 Years CertifiedNearest Port: Qingdao PortAverage Response Time: >24h
About Our Factory & Business Background
AddressTianzhuang Town, Huantai County, Zibo, Shandong, China
Plant Area88433.37 square meters
Number of Employees188
Registered Capital60,000,000 RMB
Terms of PaymentLC, T/T
International Commercial Terms(Incoterms)FOB, CIF, CFR, EXW
Average Lead TimePeak Season Lead Time: one month, 1-3 months Off Season Lead Time: one month, 1-3 months
Minimum Order Quantity1
Supply Chain Partners50
Our Production Capability & Technical Expertise
Main ProductsBridge Formwork, Steel Formwork, Custom Steel Formwork, Bridge Pier Formwork, Precast Girder Formwork, Box Girder Formwork, U Girder Formwork, Pier Column Formwork, Segmental Bridge Formwork
Production Lines2
Production MachinesLaser Cutting Machine, Arc press machine, Circular saw cutting machine, CNC drilling machine, CNC lathe, CNC plasma cutting machine, CNC punching machine, CNC shearing machine, Long strip CNC punching machine, Planer and milling machine, Punch press, Shot blasting machine, Strip cutting machine, Welding robot
QA/QC inspectors6 people
Inspection Type for Finished Products100% inspection(Visual inspection & Function inspection)
Inspection Method for Finished ProductsHave instructions and uniformly followed
R&D Engineers6 people
Traceability of Raw MaterialsYes
Own BrandYes
Our Industry Experience & Global Business Record
Year of Establishment1995-12-14
Main MarketsEurope, Southeast Asia/ Mideast, Domestic
Repeat Buyers Choice< 10%
Number of Foreign Trading Staff5
Overseas Agent/BranchNo
New Products Launched in Last yearYes
Our Certifications, Standards & Industry Recognition
Management System CertificationISO9001:2015, ISO14001, ISO45001:2018
Cooperated with Fortune 500Yes
Product Q&A
Q:Q: How to arrange after-sales personnel?
A:
1. Installation, commissioning and handoverThe minister of the after-sales service department shall conduct on-site command and coordination. One level-1 foreman, one installation team leader, 4-6 installation workers and 1-2 hydraulic system installation engineers will be assigned on site. All professional installers shall be scheduled reasonably according to the site progress.
2. After-sales service
When the customer raises an after-sales request, professional after-sales personnel will be di
Q:Q: What are the forms of regular follow-up visits?
A:
A: Regular follow-up by sales staff: During product shipment and installation, track shipment and installation progress daily to guarantee the schedule. Within the first 3 months after the product is put into normal operation, conduct at least 2 follow-up visits by phone or on-site each month.
After the product has been on site for 3 months, maintain at least 1 follow-up visit by phone or on-site each month.
Regular follow-up by after-sales staff: After installation staff obtain customer accept
Send Inquiry
*To:
Shandong Zibo Huanyu Bridge Formwork Co., Ltd.
Shandong Zibo Huanyu Bridge Formwork Co., Ltd.*Content:
0/4000
Supplier replies will be sent to your registered email
You may also like
Robust Structure 1350kg Precast Concrete Insert Maqnet for Precast Floor Slabs
US$40.00-50.00
1 Piece(MOQ)
Skydeck Dock in Customized Green for Functional and Beautiful Structures
US$100.00
500 Pieces(MOQ)
Versatile Adjustable Tunnel Structure for Enhanced Project Planning
US$1,300.00-1,400.00
10 Tons(MOQ)
Customized Steel Metal Product Fabrication Stainless Steel Structure and Processing
US$690.00-720.00
1 Ton(MOQ)
Reusable Bridge Cantilever Traveller Stable Structure for Concrete Construction
US$1,000.00-1,400.00
10 Tons(MOQ)
Hot Sale Fabrication Design Building Prefabricated Workshop Steel Structure Warehouse
US$50.00-150.00
200 Pieces(MOQ)
Plastic Building Material for The Culvert Structure
US$35.00-40.00
100 Square Meters(MOQ)
Lianggong Customization High Quality Workshop Steel Structure Popular in Indonesia
US$1,000.00
100 Tons(MOQ)
Rasto Type Steel Frame Reusable Modular High Quality Universal Wall Formwork
US$70.00-135.00
100 Pieces(MOQ)
Lianggong Reusable High Strength Durable Aluminum I Beam H20 Timber Beam Formwork for Concrete
US$6.00-10.00
1,000 Meters(MOQ)
Lianggong Reusable Lightweight Aluminum Steel Plastic Formwork Wall Column Climbing Tunnel Slab Formwork for Construction
US$1,000.00-1,500.00
1 Piece(MOQ)
Lianggong Reusable H20 Timber Beam Steel Wood Aluminum Plastic Formwork for Wall Slab Column
US$6.00-10.00
1,000 Meters(MOQ)
Building Concrete Plastic Steel Aluminum Formwork for Adjustable Reusable Wall Column Slab Systems
US$55.00-65.00
100 Square Meters(MOQ)
Lianggong Reusable Quick Assembly Wall Column Steel Aluminum Frame Formwork for Construction
US$65.00-69.00
300 Square Meters(MOQ)
China Supplier High-Strength Timber Beam Formwork for Column and Wall Engineering
US$90.00-100.00
200 Square Meters(MOQ)
Reliable Supporting System Concrete Casting Works Concrete Formwork System
US$80.00
1,000 Square Meters(MOQ)
Factory Supply Steel Aluminum Plastic Timber Beam Concrete Formwork for Wall Column and Slab Construction
US$70.00-75.00
100 Square Meters(MOQ)
China Factory Excellent-Quality Corrosion-Resistant Multifunctional Drophead Slab Steel Formwork for Engineering Construction
US$58.00-60.00
10 Square Meters(MOQ)
Plastic Construction Material Encofrado Plastico Wall Form Work PVC Panel Concrete Formwork for Pillars Columnas Slab Beam
US$45.00-55.00
100 Square Meters(MOQ)



















