SourcingAI
Try for free
Powered by Made-in-China.com
Certified 125kw/261kwh Liquid-Cooled Bess Solution for Safe C&I Battery Storage
US$23,000.00-50,000.00
1 Set

Product profile

Customization

Available

Application

Commercial Complex Peak Shaving

Installation

Standard Container (20ft/40ft), Cabinet Floor-Mounted

Model NO.

FGESS-125K/261K-0.4OW

Energy Capacity

100kWh-500kWh

Power Configuration

100kW-250kW

Cycle Life

5000 Cycles (80%DOD)

Cooling Method

Full Liquid Cooling (Temperature Difference ≤3℃)

Energy Capacity

125kw/261kwh

Cycle Life

6, 000 Cycles (@90% Dod, 70% Eol)

Cooling Method

Liquid Cooling (DC Side)

Battery Configuration

1p260s

Battery Cell Type

LFP 3.2V/314ah

Product Type

All-in-One Integrated Cabinet

Scalability

up to 10 Units in Parallel

Use Cases 1

Peak-Valley Arbitrage

Use Cases 2

Demand Control

Use Cases 3

PV-Storage-Charging Integration

Use Cases 4

Microgrid/Backup

Transport Package

Wooden Package

Specification

2.8t

Trademark

FGI

Origin

China

HS Code

8504409999

Key features

The system equiped Liquid Cooling System for the DC side (Battery PACKs) and Air Cooling for the AC side (PCS/Electrical compartment).
Reduces on-site installation complexity. The unit supports plug-and-play operation and can run independently or in parallel with other cabinets.
Features a physical partition separating the Electrical Compartment and Battery Compartment using thermal insulation and flame-retardant materials.

Company profile

WindSun Science & Technology CO.,Ltd.
Cooperated with Fortune 500Years of Export Experience100% Finished Products InspectionHigh Repeat Buyers Choice
CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedR&D Capacity: ODM Service Available & OEM Service Available CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc. CertifiedExport Year: 10 years CertifiedNearest Port: Qingdao PortAverage Response Time: ≤5.74h

About Our Factory & Business Background

AddressMid-Section of Jincheng Road, North Side, Economic Development Zone, Wenshang County, Shandong 272500, Jining, Shandong, China
Plant Area122570 square meters
Number of Employees784
Registered Capital141,382,530 RMB
Terms of PaymentT/T, LC
International Commercial Terms(Incoterms)FOB
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: one month
Minimum Order Quantity1 set
Supply Chain Partners377

Our Production Capability & Technical Expertise

Main ProductsVFD, Bess, Svg, Statcom
Production Lines18
Production MachinesPCBA, Auto-production line, Auto-testing line, Laboratory
QA/QC inspectors64 people
Inspection Type for Finished Products100% inspection(Visual inspection & Function inspection)
Inspection Method for Finished ProductsHave instructions and uniformly followed
R&D Engineers79 people
Traceability of Raw MaterialsYes

Our Industry Experience & Global Business Record

Year of Establishment2004-08-10
Main MarketsSoutheast Asia/ Mideast, East Asia(Japan/ South Korea), Domestic
Repeat Buyers Choice80%~100%
Number of Foreign Trading Staff33
Overseas Agent/BranchYes
New Products Launched in Last yearYes

Our Certifications, Standards & Industry Recognition

Management System CertificationISO9001:2015, ISO45001:2018, ISO14001
Product CertificationCCC
Cooperated with Fortune 500Yes

Product Q&A

Q:What is the specific battery cell configuration inside the 261kWh cabinet?
A:
The battery cluster uses a 1P260S configuration. It consists of 5 individual battery PACKs, each with a capacity of 52.2kWh (configured as 1P52S). The total number of cells is 260.
Q:What are the cycle life specifications for this energy storage system?
A:
According to the test standards, the system is rated for 6,000 cycles under the following conditions: 25(degrees Celsius) ambient temperature, 0.5P charge/discharge rate, 90% Depth of Discharge (DOD), with 70% capacity retention at End of Life (EOL).
Q:Does the system support off-grid (islanded) operation?
A:
Yes. The integrated PCS supports off-grid operation.The AC output voltage is 400V (-15%~+15%),frequency is 50Hz,and the output voltage distortion rate is no more than 3%.
Q:What is the communication architecture of the BMS?
A:
The BMS adopts a two-level architecture. The BMU (Slave) communicates via Daisy Chain within the battery pack, while the BCMU (Master) communicates with external devices using CAN, RS485, and Ethernet protocols.
Q:What are the overheating protection measures for the battery?
A:
The system uses a liquid cooling method for the battery compartment. The optimal cycle temperature is 30(degrees Celsius), and the temperature difference between cells is controlled within 5(degrees Celsius). If the temperature exceeds safe limits, the BMS will trigger alarms and protective actions.

Send Inquiry

*To:WindSun Science & Technology CO.,Ltd.WindSun Science & Technology CO.,Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

261kwh Industrial Energy Storage Solution for Commercial Use
Made-in-China.com