SourcingAI
Try for free
Powered by Made-in-China.com
Large Glue Pot EVA Edge Banding Machine Straight and Curve Line for Woodworking
US$780.00
10-19 Pieces
US$750.00
20-29 Pieces
US$740.00
30+ Pieces

Product profile

Customization

Available

Warranty

1 Year

Function

Gluing, Edge Banding

Model NO.

W-3

Type

Curve Line Edge Banding Machine

Edging thickness

0.4-2mm

Automatic Grade

Semiautomatic

Panel Feeding Speed

10.8m/Min

Certification

CE, ISO, Eac

Manufacturing Principles

Glue Tank Underneath

Customized

Customized

After-sales Service

1 Year

Name

Automatic Curve Edge Banding Machine

Total Power

3.4kw

Air Pressure

0.5-0.8MPa

Edge Band Width

8-50mm

Motor Power

0.18kw

Weight

157kg

Application

Cabinet Door Making Machine

ODM/OEM

Support

Transport Package

Wooden Package

Specification

1960*1700*1250mm

Trademark

DTMACH

Origin

China

HS Code

84659900

Production Capacity

10000sets/Year

Key features

Double Spiral Gluing: Double spiral gluing with grid-shaped roller ensures uniform coating and firm adhesion.
Large Glue Capacity: 1200ml glue pot capacity reduces the frequency of adding glue during operation.
Dual Control System: Double pedal control manages suction cup and edge band strip feeding independently.
Stable Transmission: Double cylinder design separates feed and cutter cylinders for stable transmission.
Customization Support: Supports OEM/ODM and flexible customization for specific client requirements.
High Efficiency: Panel feeding speed up to 10.8m/Min with infinitely variable speed adjustment.
Anti-Rebound Design: New strip board and auxiliary pressure wheel prevent rebound and ensure firm paste.
Wide Application: Processes PVC, melamine, and plastic materials for cabinet door making.

Company profile

Shandong Dongteng Machinery Co., Ltd.
Importers and Exporters
CertifiedBusiness Type: Trading Company CertifiedCustomization Options: Customization from Designs, Flexible customization, etc. CertifiedExport Year: 4 years CertifiedNearest Port: Qingdao PortAverage Response Time: ≤3.94h CertifiedTerms of Payment: T/T

About Our Factory & Business Background

AddressRoom 102, Building 11, Greenland Center, Licheng District, Jinan City, Shandong Province, Jinan, Shandong, China
Plant Area1003 square meters
Number of Employees17
Registered Capital3,000,000 RMB
International Commercial Terms(Incoterms)FOB, CIF, CFR, EXW
Average Lead TimePeak Season Lead Time: within 15 workdays Off Season Lead Time: within 15 workdays
Minimum Order Quantity1 set
Supply Chain Partners3

Our Production Capability & Technical Expertise

Main ProductsEdge Banding Machine, Sliding Table Saw, Wood Drilling Machine, CNC Router, Sanding Machine
QA/QC inspectors1 people
Inspection Type for Finished Products100% inspection(Visual inspection & Function inspection)
Inspection Method for Finished ProductsFinished product checked by packing staff
R&D Engineers1 people
Traceability of Raw MaterialsYes

Our Industry Experience & Global Business Record

Year of Establishment2022-03-11
Main MarketsNorth America, South America, Europe, Southeast Asia/ Mideast, Africa, East Asia(Japan/ South Korea), Australia
Repeat Buyers Choice30%~50%
Number of Foreign Trading Staff4
Overseas Agent/BranchNo
New Products Launched in Last yearYes

Our Certifications, Standards & Industry Recognition

Product CertificationOthers
Cooperated with Fortune 500No

Product Q&A

Q:What suggestions can you provide for edge banding machines?
A:
We recommend the most suitable machine based on your board thickness, strip material, and local voltage.
Q:Which materials can be processed on this machine?
A:
This machine can process PVC, melamine, plastic, and other similar materials.
Q:Are you a factory or trading company?
A:
We are a manufacturer with 20 years of experience, providing trustworthy machines and comprehensive after-sales service.
Q:What is the payment term for orders?
A:
Pay 50% prepayment to start production. The balance is paid after we send completion photos/videos, before shipping.
Q:How long is the delivery time?
A:
Standard machines take 12-15 days. Customized machines take 15-30 days.

Send Inquiry

*To:Shandong Dongteng Machinery Co., Ltd.Shandong Dongteng Machinery Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

China PVC Edge Banding Production Line

China PVC Edge Banding Production Line

US$5,000.00-20,000.00
1 Piece(MOQ)
Made-in-China.com