SourcingAI
Try for free
Powered by Made-in-China.com
Ese Lightning Rods for Buildings with CE Certificate for Lightning Protection
US$299.00
1-9 Pieces
US$289.00
10-49 Pieces
US$279.00
50-99 Pieces
US$269.00
100+ Pieces

Product profile

Customization

Available

Type

Signal Type Arrester

Installation

Parallel Arrester

Model NO.

YBT-YFD60

Application

Substation

Size

Small

Operation Voltage

High Voltage

Certification

ROHS, ISO9001, CCC

Early Discharge Time

60 μS

Installation Method

Flange Fixed or Welded

Operating Hours

All Day

Outward Appearance

Beautiful and Easy Install

Features

No Need Power

Transport Package

Non Fumigation Wooden Box

Specification

304 stainless steel

Trademark

YANGBO

Origin

China

Production Capacity

100000

Key features

Early Discharge Technology: Generates electricity 60 microseconds in advance for enhanced protection.
High Voltage Resistance: Lightweight design with excellent high pressure resistance capabilities.
Comprehensive Certifications: Certified by CE, ROHS, ISO9001, and CCC standards.
Versatile Installation: Supports flange fixed or welded installation methods.
No Power Requirement: Operates independently without external power supply.
Class 1 Protection: Meets Class 1 protection standards according to NFC 17-102.
OEM and ODM Services: Customization services available for brand and design.
Fast Lead Time: Production completed within 15 workdays for both peak and off seasons.

Company profile

CertifiedBusiness Type: Manufacturer/Factory CertifiedR&D Capacity: ODM Service Available & OEM Service Available CertifiedNearest Port: Shanghai PortAverage Response Time: ≤2.83h CertifiedTerms of Payment: LC, T/T, D/P, etc. CertifiedInternational Commercial Terms(Incoterms): FOB, CIF, CFR, EXW

About Our Factory & Business Background

AddressAgricultural Resources Building, No. 174, North Section of Dongming Road, Zhengzhou, Henan, China
Plant Area90 square meters
Number of Employees60
Registered Capital16,000,000 RMB
Average Lead TimePeak Season Lead Time: within 15 workdays Off Season Lead Time: within 15 workdays

Our Production Capability & Technical Expertise

Main ProductsLightning arrester, Lightning tower, lightning warning, Lifting rod, Grounding module
Production MachinesSawing machine, Milling machine, Lathe, CNC Lathe, Drilling machine, Welding machine
R&D Engineers5 people
Own BrandYes

Our Industry Experience & Global Business Record

Year of Establishment2006-07-30
Main MarketsNorth America, South America, Europe, Southeast Asia/ Mideast, Africa, Domestic
Number of Foreign Trading Staff4
Overseas Agent/BranchNo

Product Q&A

Q:What is the early discharge time?
A:
The device generates electricity 60 microseconds in advance.
Q:Does the lightning rod require power?
A:
No, it features a 'No Need Power' design.
Q:What installation methods are supported?
A:
It supports flange fixed or welded installation.
Q:What certifications does the product have?
A:
It holds CE, ROHS, ISO9001, and CCC certifications.
Q:What is the lead time for production?
A:
The average lead time is within 15 workdays.

Send Inquiry

*To:Henan Yangbo Lightning Protection Technology Co., Ltd.Henan Yangbo Lightning Protection Technology Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

Roof Mount Lightning Rod with Brass Base
Made-in-China.com