SourcingAI
Try for free
Powered by Made-in-China.com
Fast Build Flat Pack Container Dorm Eliminate Construction Delay Loss for Mining Projects
US$1,850.00
4-49 Pieces
US$899.00
50+ Pieces

Product specifications

Customized

Product profile

Customization

Available

After-sales Service

1 Year

Application

Residential Hostel

Model NO.

9S-003

Fast Installation

Fast Installation

Feature

Earthquake Resistant, Easily Movable, Eco-Friendliness, Leak Proof, Moisture Proof, Safe, Thermal Insulation, Waterproof, Wind Resistance

Material

Sandwich Panel

Lifespan

20 Years

Door

Plastic Steel Door

Window

Plastic Steel Window

Advantage

Quick Installation

Color

Customized Color

Keyword

Mobile Living Container House

Roof

Sandwich Panel+ Decoration Ceiling

Certification

CE Certification

Transport Package

Flat Disassembled Pack, Multiple Sets Per 40hq

Specification

20ft (600×300×290cm), 40ft (1200×300×290cm)

Trademark

9states

Origin

Shanghai, China

HS Code

940690

Production Capacity

3000 Sets/Month

Key features

Factory prefabricated over 90%, on-site installation within 2 hours
Steel frame + Class A fireproof wall panel, safe and durable
Built-in water and electricity pipelines, ready to move in
Moisture and corrosion resistant, adapt to harsh site environment
Detachable and reusable for multiple projects, reduce cost
Modular combination, freely expandable for more dorm units

Company profile

9States Modular Building Shanghai Co.,Ltd.
Importers and ExportersProduct CertificationCustomization from DesignsR&D Capabilities
CertifiedBusiness Type: Trading Company CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc. CertifiedExport Year: 2 Years CertifiedNearest Port: Shanghai PortAverage Response Time: ≤4.01h CertifiedTerms of Payment: LC, T/T, D/P, etc.

AI-Powered supplier vetting

SummaryThe supplier is a Shanghai-based limited trading company established in 2023 with five employees and over 10 years of stated industry experience. It offers modular container products and supports extensive customization, including design-based, sample-based, minor, flexible, and full customization. Evidence shows new products were launched during the past year, but no SDK or ODM capability is available. Export sales represent 51%–70% of total sales, although overseas service infrastructure is limited: there are no overseas agents or branches, warehouses, showrooms, or stated overseas-service countries. The supplier reports no in-stock capability and does not provide evidence of approved-supplier controls, written corrective-action procedures, quality-assurance status, raw-material traceability, or outsourcing controls. Complaint handling is supported by a clear procedure and records. Financial information is only represented by reporting years, without substantive performance metrics, so financial...
Supplier typeThe supplier is identified as a China-based limited company and trading company headquartered in Shanghai. Its stated product scope covers Z-folding, flat-pack, detachable, expandable containers, and Apple Cabins, while its permitted business scope includes construction project contracting.
After-Sales capabilityThe company states that it provides after-sales installation and has a clear, followed procedure for handling customer complaints. However, it has no overseas agents or branches, overseas warehouses, overseas showrooms, or stated overseas-service countries, which limits demonstrated international after-sales infrastructure.
R&D capabilityThe supplier reports launching new products during the past year, indicating some product-development activity. It supports design-related customization but has no available SDK, does not offer ODM services, and does not provide OEM services for popular brands.
Customization capabilityThe supplier explicitly supports customization from designs and samples, full customization, minor customization, and flexible customization. Its background description also includes design and manufacturing services, providing clear evidence of broad customization capability.

Product Q&A

Q:What material is the activity house made of?
A:
It adopts high-strength steel structure + sandwich panel, rust-proof, corrosion-resistant, suitable for humid tropical environment.
Q:Is it easy to install?
A:
Yes, it features simple assembly, fast setup, no complex tools required.
Q:Can it resist strong wind and heavy rain?
A:
Reinforced frame design, good windproof and waterproof performance, works well in typhoon-prone areas.
Q:Is the house moisture and mold proof?
A:
Yes, we adopt special sealing and moisture-proof technology to prevent mildew in high humidity areas.
Q:Can we customize the size and layout?
A:
Custom size, door & window position and interior layout are supported.

Send Inquiry

*To:9States Modular Building Shanghai Co.,Ltd.9States Modular Building Shanghai Co.,Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

Ready 20FT Flat Pack Container Dorm for Remote Site Camp
Made-in-China.com
Fast Construction Flat Pack House Container Dorm

Fast Construction Flat Pack House Container Dorm

US$2,100.00-2,500.00
4 Pieces(MOQ)
Made-in-China.com