CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedR&D Capacity: ODM Service Available CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc. CertifiedExport Year: 9 Years CertifiedNearest Port: Shanghai PortAverage Response Time: ≤3.30h
AI-Powered supplier vetting
SummaryThe supplier is a limited company involved in manufacturing, processing, and sales of mechanical equipment with a focus on plastic machinery. They provide 3D design services with a strong customization capability but lack recent product innovations. They maintain robust quality control and complaint management systems but lack overseas presence and inventory capacity.
Supplier typeThe supplier is a limited company engaged in manufacturing and processing of mechanical equipment, with no affiliation to a larger company group.
After-Sales capabilityThe supplier has a clear procedure and records for corrective and preventive actions, and effectively handles customer complaints, indicating strong after-sales service capability.
R&D capabilityThe supplier offers ODM services but has not introduced new products in the past year and lacks SDK availability, indicating limited innovation capability.
Production capacityThe supplier has a diverse manufacturing capability for various plastic machinery, with valid contracts for manufacturing capacity.
Customization capabilityThe supplier provides extensive customization options, including full, minor, and flexible customization based on samples and designs.
Product Q&A
Q:What is the warranty period for the machine?
A:
We provide a 2-year warranty for all our machines.
Q:Can the machine be customized?
A:
Yes, we offer full customization including voltage, electric components, and rotor hardening based on customer requirements.
Q:What is the minimum order quantity?
A:
The minimum order quantity is 1 set.
Q:Do you provide after-sales service?
A:
Yes, we offer local service, free spare parts, and can send engineers for installation and training.
Q:What is the lead time for production?
A:
The average lead time is 1-3 months for both peak and off-peak seasons.
Send Inquiry
*To:Suzhou Aceretech Machinery Co., Ltd.
*Content:
0/4000
Supplier replies will be sent to your registered email