SourcingAI
Try for free
Powered by Made-in-China.com
European Standard Moving Ringlock System Scaffolding with OEM Service
Negotiable
5 Tons
Sample price:US$15.00/piece.Request sample

Product profile

Customization

Available

After-sales Service

Available

Warranty

10 Years

Material

Steel

Type

Fixed

Structural Style

Multi-Pole Scaffolding

Framework

Combined Scaffolding

Supporting Mode

Projecting Scaffolding

Lapping Form

Full Scaffolding

Erection Position

External Scaffolding

Move Method

Horizontal mobile Scaffolding

Scaffolding Part Type

Scaffolding Frames

Construction Properties

Building Scaffold

Surface

Hot DIP Galvanized

Certificate

AS/NZS 1576, BS En12810

Transport Package

Suitable for Sea Shipment

Specification

PER REQUEST

Trademark

ADTO

Origin

China

HS Code

73084000

Production Capacity

8000tons/Month

Key features

10-Year Warranty: Comprehensive 10-year warranty coverage for all mechanical defects.
European Standard Compliance: Conforms to BS EN12810 and AS/NZS 1576 standards with lab testing.
Hot Dip Galvanized Finish: Surface treated with hot-dipped zinc galvanizing for maximum corrosion resistance.
High-Quality Steel Material: Constructed using certified high-quality steel that exceeds industry standards.
OEM and ODM Services: Full customization available from samples and designs with factory direct control.
Fast Production Lead Time: Peak and off-peak season lead times within 15 working days.
Professional Engineering Support: Expert team provides design, engineering, and site solution services.
Large Monthly Capacity: Factory capacity of approximately 8000 tons per month ensures supply stability.

Company profile

CHANGSHA XIANGJIA METAL MATERIAL TRADING CO., LTD.
Cooperated with Fortune 5003D Software DesignQA/QC InspectorsManagement Certification
CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedR&D Capacity: ODM Service Available & OEM Service Available CertifiedCustomization Options: Customization from Samples, Customization from Designs CertifiedExport Year: 18 years CertifiedNearest Port: Shanghai Port.Tianjing Port.Average Response Time: ≤3.94h

About Our Factory & Business Background

Address11f, 16f 18f, Mingcheng Intl Bldg, Yuhua District, Changsha, Hunan, China
Plant Area1000 square meters
Number of Employees187
Registered Capital5,000,000 RMB
Terms of PaymentLC, T/T, PayPal, Western Union
International Commercial Terms(Incoterms)FOB, CIF, CFR, EXW
Average Lead TimePeak Season Lead Time: within 15 workdays Off Season Lead Time: within 15 workdays
Supply Chain Partners20

Our Production Capability & Technical Expertise

Main ProductsScaffolding(Including Ringlock Scaffolding, Cuplock Scaffolding, Kwickstage Scaffolding, Frame Scaffolding, Scaffolding Tube, Scaffolding Coupler, Scaffolding Planks, Scaffolding Accessories etc)
Production Lines2
Production MachinesLaser tube cutting machine, Punching machine, Riveting machine
QA/QC inspectors8 people
Inspection Type for Finished Products100% inspection(Visual inspection & Function inspection)
Inspection Method for Finished ProductsHave instructions and uniformly followed
R&D Engineers6 people
Traceability of Raw MaterialsYes
Own BrandYes

Our Industry Experience & Global Business Record

Year of Establishment2005-01-26
Main MarketsNorth America, Southeast Asia/ Mideast, East Asia(Japan/ South Korea)
Repeat Buyers Choice50%~80%
Annual Export Revenue300,000,000 RMB
Number of Foreign Trading Staff130
Overseas Agent/BranchNo
New Products Launched in Last yearNo

Our Certifications, Standards & Industry Recognition

Cooperated with Fortune 500Yes

Product Q&A

Q:What standards does the Ringlock system conform to?
A:
The system conforms to European standard BS EN12810 and AS/NZS standard 1576, with lab testing and certification provided.
Q:What is the warranty period for the scaffolding?
A:
We provide a 10-year warranty for our Ringlock scaffolding products.
Q:Is OEM and ODM service available?
A:
Yes, we offer both OEM and ODM services, allowing customization from samples or designs.
Q:What is the lead time for production?
A:
The average lead time is within 15 working days for both peak and off-peak seasons.
Q:What material is used for the scaffolding?
A:
We use only the highest quality certified steel that conforms to or exceeds industry standards.

Send Inquiry

*To:CHANGSHA XIANGJIA METAL MATERIAL TRADING CO., LTD.CHANGSHA XIANGJIA METAL MATERIAL TRADING CO., LTD.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like