SourcingAI
Try for free
Powered by Made-in-China.com
100% Raw Material Electric Cable Manhole Covers Composite Manhole Cover Price
US$880.00
1 Ton

Product profile

Customization

Available

Material

Steel

Shape

Round

Model NO.

400*400.500*500, etc

Key features

ODM & OEM Service: Supports customization with logo and drawings provided by customers.
High Strength Material: Made of GGG500-7 ductile iron meeting EN124:1994 standards.
Diverse Load Classes: Available in classes A15 to F900 for various applications.
Fast Delivery: Regular 20ft orders delivered within 15 days from factory.
Custom Molding: New molding development takes 20-30 days based on drawings.
Quality Assurance: ISO9001, ISO14001 certified with full QC and testing videos.
Surface Treatment: Options include black bitumen or epoxy painting.
Large Production Capacity: 150,000 sqm factory with 7 automated production lines.

Company profile

Business Type: Manufacturer/FactoryExport Year: 2021-04-01Average Response Time: ≤7.55h

About Our Factory & Business Background

AddressHanshan Industrial Area ( Lintou ), Maanshan, Ma'anshan, Anhui, China

Our Production Capability & Technical Expertise

Main ProductsDuctile Iron Manhole Cover, Composite Manhole Covers, SMC Drainage Channels, Trench Covers Gully Gratings, Stainless Steel Manhole Cover Grate, Smart Manhole Cover, Grass Basin Well Decorative Manhole Cover, Grass Lawn Manhole Cover, Tree Protection Board, Sponge City Products

Product Q&A

Q:Do you support customization and logo printing?
A:
Yes, we provide both ODM and OEM services. You only need to provide product drawings and detailed requests.
Q:What are the payment terms?
A:
Generally, 30% deposit via T/T before production and 70% balance before shipment.
Q:How do you guarantee the quality of mass production?
A:
We send samples for confirmation before mass production, conduct QC during production, and perform final inspection with testing videos before shipment.
Q:What is your delivery time?
A:
Generally, a regular 20ft order is delivered within 15 days.
Q:How long does it take to develop a new molding?
A:
It generally takes 20-30 days to develop a new molding according to the drawings.

Send Inquiry

*To:Anhui Feilong New Material Co., Ltd.Anhui Feilong New Material Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like