SourcingAI
Try for free
Powered by Made-in-China.com
Cast Iron Grates for Sewer Drainage Single Grates for Underground Garages
US$880.00
1 Ton

Product profile

Customization

Available

Material

Steel

Shape

Round

Model NO.

450*450.500*500, etc

Key features

ODM & OEM Service: Supports customization with logo and specific drawings provided by customers.
High Strength Material: Made from GGG500-7 ductile iron meeting EN124:1994 standards.
Multiple Load Classes: Available in A15, B125, C250, D400, E600, and F900 classes for various applications.
Durable Surface Treatment: Features black bitumen or epoxy painting for enhanced corrosion resistance.
ISO Certified Quality: Factory holds ISO9001, ISO14001, and OHSAS1800 certifications.
Fast Delivery: Regular 20ft orders delivered within 15 days due to large production capacity.
Custom Molding Development: New mold development typically completed within 20-30 days based on drawings.
Comprehensive QC Process: Includes sample confirmation, in-process QC, and final inspection with video proof.

Company profile

Business Type: Manufacturer/FactoryExport Year: 2021-04-01Average Response Time: ≤9.98h

About Our Factory & Business Background

AddressHanshan Industrial Area ( Lintou ), Maanshan, Ma'anshan, Anhui, China

Our Production Capability & Technical Expertise

Main ProductsDuctile Iron Manhole Cover, Composite Manhole Covers, SMC Drainage Channels, Trench Covers Gully Gratings, Stainless Steel Manhole Cover Grate, Smart Manhole Cover, Grass Basin Well Decorative Manhole Cover, Grass Lawn Manhole Cover, Tree Protection Board, Sponge City Products

Product Q&A

Q:Do you support customization and logo printing?
A:
Yes, we provide both ODM and OEM services. You only need to provide product drawings and detailed requests.
Q:What is the payment term?
A:
Generally, 30% deposit via T/T before production and 70% balance before shipment.
Q:How do you guarantee the quality of mass production?
A:
We send samples for confirmation before mass production, have QC during the process, and perform final inspection with testing videos before shipment.
Q:How long is the delivery time?
A:
Generally, a regular 20ft order is delivered within 15 days.
Q:How long does it take to develop a new molding?
A:
Generally, it takes within 20-30 days to develop a new molding according to the drawings.

Send Inquiry

*To:Anhui Feilong New Material Co., Ltd.Anhui Feilong New Material Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

Single Ductile Iron Grate for Drainage Trench
Made-in-China.com
Ductile Cast Iron Drain Grate for Drainage System
Made-in-China.com