SourcingAI
Try for free
Powered by Made-in-China.com
Cast Iron Heavy Duty Double Seal Ductile Iron Manhole Cover Anti-Rust
US$880.00
1 Ton

Product profile

Customization

Available

Material

Steel

Shape

Round

Model NO.

700*700

Key features

ODM & OEM Customization: Supports custom logos and designs based on client drawings and detailed requests.
High-Strength Material: Made of GGG500-7 ductile iron, ensuring durability and heavy-duty performance.
EN124:1994 Compliance: Meets international standards with classes A15 to F900 for various traffic loads.
Anti-Rust Surface Treatment: Features black bitumen or epoxy painting for enhanced corrosion resistance.
Fast Delivery Time: Regular 20ft container orders delivered within 15 days from our large factory.
Strict Quality Control: Includes sample confirmation, in-process QC, and final inspection with video proof.
Certified Manufacturer: ISO9001, ISO14001, and OHSAS1800 certified with over 800 product specifications.
Flexible Payment Terms: Standard 30% deposit via T/T before production, 70% balance before shipment.

Company profile

Business Type: Manufacturer/FactoryExport Year: 2021-04-01Average Response Time: ≤7.61h

About Our Factory & Business Background

AddressHanshan Industrial Area ( Lintou ), Maanshan, Ma'anshan, Anhui, China

Our Production Capability & Technical Expertise

Main ProductsDuctile Iron Manhole Cover, Composite Manhole Covers, SMC Drainage Channels, Trench Covers Gully Gratings, Stainless Steel Manhole Cover Grate, Smart Manhole Cover, Grass Basin Well Decorative Manhole Cover, Grass Lawn Manhole Cover, Tree Protection Board, Sponge City Products

Product Q&A

Q:Do you support customization and logo printing?
A:
Yes, we provide ODM & OEM services. You only need to provide product drawings and detailed requests for customized logos and designs.
Q:What is the payment term?
A:
Generally, 30% deposit via T/T before production and 70% balance before shipment.
Q:How do you guarantee mass production quality?
A:
We send samples for confirmation before mass production, conduct QC during production, and perform final inspection before shipment, including sending testing videos.
Q:What is the delivery time for orders?
A:
Generally, a regular 20ft container order is delivered within 15 days.
Q:How long does it take to develop a new mold?
A:
It generally takes 20-30 days to develop a new molding according to the drawings.

Send Inquiry

*To:Anhui Feilong New Material Co., Ltd.Anhui Feilong New Material Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

Ductile Iron Manhole Cover & Frame

Ductile Iron Manhole Cover & Frame

US$13.00-18.00
100 Pieces(MOQ)
Made-in-China.com