SourcingAI
Try for free
Powered by Made-in-China.com
China Manufacturer 500X500mm FRP/GRP Composite Square Manhole Cover with Plastic/Pull Rings
US$880.00
1 Ton

Product profile

Customization

Available

Material

Steel

Shape

Round

Model NO.

300*300 400*400

Certification

ISO, CE

Key features

ODM & OEM Services: Supports customization with logo and drawings provided by clients.
Multiple Material Options: Available in Ductile Iron, Composite, SMC, and Stainless Steel.
ISO & CE Certified: Products meet ISO9001, ISO14001, OHSAS1800, and EN124 standards.
Fast Delivery Time: Regular 20ft orders delivered within 15 days from our large factory.
Custom Molding Development: New molding development takes 20-30 days based on provided drawings.
Comprehensive Quality Control: Includes sample confirmation, in-process QC, and pre-shipment video testing.
Wide Application Range: Covers classes A15 to F900 for pedestrians, roads, docks, and aircraft pavements.
Large Scale Manufacturing: 150,000 sqm factory with 500+ employees and 7 automated production lines.

Company profile

Business Type: Manufacturer/FactoryExport Year: 2021-04-01Average Response Time: ≤11.39h

About Our Factory & Business Background

AddressHanshan Industrial Area ( Lintou ), Maanshan, Ma'anshan, Anhui, China

Our Production Capability & Technical Expertise

Main ProductsDuctile Iron Manhole Cover, Composite Manhole Covers, SMC Drainage Channels, Trench Covers Gully Gratings, Stainless Steel Manhole Cover Grate, Smart Manhole Cover, Grass Basin Well Decorative Manhole Cover, Grass Lawn Manhole Cover, Tree Protection Board, Sponge City Products

Product Q&A

Q:Do you support customization and logo printing?
A:
Yes, we provide both ODM and OEM services. You only need to provide product drawings and detailed requests.
Q:What are the payment terms?
A:
Generally, 30% deposit via T/T before production and 70% balance before shipment.
Q:How do you guarantee the quality of mass production?
A:
We send samples for confirmation before mass production, have QC during the process, and perform final inspection with video testing before shipment.
Q:How long is the delivery time?
A:
Generally, a regular 20ft order is delivered within 15 days.
Q:How long does it take to develop a new molding?
A:
It generally takes 20-30 days to develop a new molding according to the drawings.

Send Inquiry

*To:Anhui Feilong New Material Co., Ltd.Anhui Feilong New Material Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

GRP Composite Plastic Manhole Covers Made
Made-in-China.com