SourcingAI
Try for free
Powered by Made-in-China.com
Customized Iron Manhole Cover Shell Mold Casting with Ductile Iron
US$880.00
1 Ton

Product profile

Customization

Available

Material

Steel

Shape

Round

Certification

CE

Key features

Customizable Design: ODM & OEM services available with custom drawings and logo requirements.
High-Strength Material: Manufactured from GGG500-7 ductile iron meeting EN124:1994 standards.
Comprehensive Certifications: ISO9001, ISO14001, and OHSAS1800 certified for quality and safety.
Wide Application Range: Available in classes A15 to F900 for pedestrians, roads, docks, and airports.
Rapid Delivery: Regular 20ft orders delivered within 15 days from our 150,000 sqm factory.
Fast Mold Development: New molding development based on drawings completed in 20-30 days.
Strict Quality Control: Samples confirmed before mass production with QC monitoring and testing videos.
Extensive Product Line: Over 800 specifications including ductile iron, composite, SMC, and stainless steel.

Company profile

Business Type: Manufacturer/FactoryExport Year: 2021-04-01Average Response Time: ≤15h

About Our Factory & Business Background

AddressHanshan Industrial Area ( Lintou ), Maanshan, Ma'anshan, Anhui, China

Our Production Capability & Technical Expertise

Main ProductsDuctile Iron Manhole Cover, Composite Manhole Covers, SMC Drainage Channels, Trench Covers Gully Gratings, Stainless Steel Manhole Cover Grate, Smart Manhole Cover, Grass Basin Well Decorative Manhole Cover, Grass Lawn Manhole Cover, Tree Protection Board, Sponge City Products

Product Q&A

Q:Do you support customization and logo printing?
A:
Yes, we provide both ODM & OEM service. You only need to provide product drawings and detailed requests.
Q:What are the payment terms?
A:
Generally, 30% deposit via T/T before production and 70% balance before shipment.
Q:How do you guarantee the quality of mass production?
A:
We send samples for confirmation before mass production, have QC monitor every process, and conduct final inspection with testing videos before shipment.
Q:How long is the delivery time?
A:
Generally, a regular 20ft order will be delivered within 15 days.
Q:How long does it take to develop a new molding?
A:
Generally, it takes within 20-30 days to develop a new molding according to drawings.

Send Inquiry

*To:Anhui Feilong New Material Co., Ltd.Anhui Feilong New Material Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

Municipal Road Square Ductile Cast Iron Manhole Cover
Made-in-China.com
Made in China Factory Supplying Ductile, Casting Iron
Made-in-China.com
Ductile Iron Is Better Than Cast Steel

Ductile Iron Is Better Than Cast Steel

US$850.00-1,050.00
1 Ton(MOQ)
Made-in-China.com
R Made in China Factory Supplying Ductile, Casting Iron
Made-in-China.com