SourcingAI
Try for free
Powered by Made-in-China.com
Ductile Cast Iron Heavy Duty Plain Gully Grating
US$9.80
1-999 kg
US$0.88
1,000-19,999 kg
US$0.68
20,000+ kg

Product profile

Customization

Available

Material

Steel

Shape

Round

Certification

ISO, CE

Key features

ODM & OEM Customization: Supports custom logos and designs based on customer drawings and detailed requests.
ISO Certified Quality: Passed ISO9001, ISO14001, and OHSAS1800 certifications for manufacturing standards.
Large Scale Production: 150,000 sqm factory with 7 automated lines and 500+ employees ensures capacity.
Fast Delivery Time: Regular 20ft container orders are delivered within 15 days.
Strict Quality Control: Samples confirmed before mass production; QC monitors every process with video proof.
Wide EN124 Compliance: Available in classes A15 to F900 for various applications from pedestrian to aircraft pavements.
Durable Surface Treatment: Features black bitumen or epoxy painting for enhanced corrosion resistance.
Extensive Product Range: Over 800 specifications including ductile iron, composite, SMC, and stainless steel products.

Company profile

Business Type: Manufacturer/FactoryExport Year: 2021-04-01Average Response Time: ≤8.08h

About Our Factory & Business Background

AddressHanshan Industrial Area ( Lintou ), Maanshan, Ma'anshan, Anhui, China

Our Production Capability & Technical Expertise

Main ProductsDuctile Iron Manhole Cover, Composite Manhole Covers, SMC Drainage Channels, Trench Covers Gully Gratings, Stainless Steel Manhole Cover Grate, Smart Manhole Cover, Grass Basin Well Decorative Manhole Cover, Grass Lawn Manhole Cover, Tree Protection Board, Sponge City Products

Product Q&A

Q:Do you support customization and logo printing?
A:
Yes, we provide ODM & OEM services. You only need to provide product drawings and detailed requests for customized services.
Q:What are the payment terms?
A:
Generally, 30% deposit via T/T before production and 70% balance before shipment.
Q:How do you guarantee the quality of mass production?
A:
We send samples for confirmation before mass production, use QC to monitor every process, conduct final inspection before shipment, and send testing videos.
Q:What is the delivery time for orders?
A:
Generally, a regular 20ft order is delivered within 15 days due to our large factory capacity.
Q:How long does it take to develop a new molding?
A:
Generally, it takes within 20-30 days to develop a new molding according to the drawings.

Send Inquiry

*To:Anhui Feilong New Material Co., Ltd.Anhui Feilong New Material Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like