SourcingAI
Try for free
Powered by Made-in-China.com
Feilong CE Approved FRP Material Reinforced Plastic En124 Manhole Cover
US$8.00-55.00
10 Sets
Sample price:US$15.00/set.Request sample

Product profile

Customization

Available

After-sales Service

Online Service Support

Warranty

Online Service Support

Material

Composite: BMC/SMC

Shape

Round / Square

Certification

ISO9001

Loading Capacity

En124 A15 B125 C250

Weight

15-35kg

Service

ODM & OEM

Color

Customized

Application

Sideroad Traffic Safety, Petrol Station

Technique

Mould Pressing

Transport Package

Plywood Pallet

Specification

400 500 600 700mm, Customizable

Trademark

Feilong

Origin

China

HS Code

3925900000

Key features

High Load Rating: Meets and exceeds EN124 A15/B125/C250/D400 loading ratings.
Anti-Theft Design: Zero theft value with non-conductive properties and optional locks.
Lightweight Construction: 50% lighter than cast iron for easier transportation and installation.
Long Service Life: Over 30 years of durability without cracking or color fading.
Customizable Logo: Client logos available as an option on composite material covers.
ODM & OEM Service: Full customization support including drawings and detailed requests.
Multiple Certifications: ISO9001, ISO14001, OHSAS1800, SGS, and CE approved.

Company profile

Business Type: Manufacturer/FactoryExport Year: 2021-04-01Average Response Time: ≤15h

About Our Factory & Business Background

AddressHanshan Industrial Area ( Lintou ), Maanshan, Ma'anshan, Anhui, China

Our Production Capability & Technical Expertise

Main ProductsDuctile Iron Manhole Cover, Composite Manhole Covers, SMC Drainage Channels, Trench Covers Gully Gratings, Stainless Steel Manhole Cover Grate, Smart Manhole Cover, Grass Basin Well Decorative Manhole Cover, Grass Lawn Manhole Cover, Tree Protection Board, Sponge City Products

Product Q&A

Q:Do you support customization and logo printing?
A:
Yes, we provide both ODM and OEM services. You only need to provide product drawings and detailed requests.
Q:What are the payment terms?
A:
Generally, 30% deposit via T/T before production and 70% balance before shipment.
Q:How do you guarantee mass production quality?
A:
We send samples for confirmation before mass production, have QC monitoring every process, and perform final inspection with video evidence before shipment.
Q:What is your delivery time?
A:
A regular 20ft order is generally delivered within 15 days.
Q:How long does it take to develop a new molding?
A:
It generally takes 20 to 30 days to develop a new molding according to drawings.

Send Inquiry

*To:Anhui Feilong New Material Co., Ltd.Anhui Feilong New Material Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

En124 BMC Square FRP Manhole Cover Plastic for Sale
Made-in-China.com