SourcingAI
Try for free
Powered by Made-in-China.com
FRP BMC Fiberglass Manhole Cover Water Meter Composite Box
US$1.80
1-99 kg
US$1.66
100+ kg

Product profile

Customization

Available

Material

SMC

Shape

Square

Certification

RoHS, ISO, CE

Key features

Customizable Design: Supports OEM/ODM with custom dimensions, surface finishes, and client logos.
High Load Capacity: Meets BS EN124 standards with ratings from A15 to F900 for various traffic loads.
Anti-Theft Safety: Zero scrap value prevents theft; includes optional molded locks for enhanced security.
Lightweight & Durable: 50% lighter than cast iron; offers over 30 years of service without cracking.
Noise Reduction: Designed to minimize noise and vibration transmission for quieter environments.
Easy Installation: Lightweight design allows single-worker installation, reducing labor risks and costs.
Environmental Friendly: Lower carbon footprint during manufacturing; non-conductive and corrosion resistant.

Company profile

Business Type: Manufacturer/FactoryExport Year: 2021-04-01Average Response Time: ≤7.59h

About Our Factory & Business Background

AddressHanshan Industrial Area ( Lintou ), Maanshan, Ma'anshan, Anhui, China

Our Production Capability & Technical Expertise

Main ProductsDuctile Iron Manhole Cover, Composite Manhole Covers, SMC Drainage Channels, Trench Covers Gully Gratings, Stainless Steel Manhole Cover Grate, Smart Manhole Cover, Grass Basin Well Decorative Manhole Cover, Grass Lawn Manhole Cover, Tree Protection Board, Sponge City Products

Product Q&A

Q:Do you support customization and logo printing?
A:
Yes, we provide OEM and ODM services. You only need to provide product drawings and detailed requests, including your logo.
Q:What is the payment term?
A:
Generally, a 30% deposit via T/T is required before production, with the 70% balance paid before shipment.
Q:How do you guarantee mass production quality?
A:
We send samples for confirmation before mass production, conduct QC during manufacturing, and perform final inspections with video evidence before shipment.
Q:What is the delivery time for a regular order?
A:
A regular 20ft container order is generally delivered within 15 days due to our large factory capacity.
Q:How long does it take to develop a new mold?
A:
Developing a new molding based on drawings generally takes 20-30 days.

Send Inquiry

*To:Anhui Feilong New Material Co., Ltd.Anhui Feilong New Material Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

FRP Composite Heavy Duty Water Meter Box with Cover
Made-in-China.com
Black Color Composite Water Meter Box

Black Color Composite Water Meter Box

US$5.99-9.99
100 Pieces(MOQ)
Made-in-China.com