SourcingAI
Try for free
Powered by Made-in-China.com
SMC Green Color Grass Basin Well with Frame From China
US$10.89
999-9,999 kg
US$1.80
10,000-24,999 kg
US$1.59
25,000+ kg

Product profile

Customization

Available

Material

SMC

Shape

Square

Certification

RoHS, ISO, CE

Key features

Customization Support: ODM & OEM services available with client logo and design options.
High Load Rating: Meets and exceeds EN124 A15/B125/C250/D400 loading standards.
Lightweight Design: 50% lighter than cast iron for easier transport and installation.
Long Service Life: Over 30 years without cracking or color fading.
Anti-Theft Safety: Zero theft value with anti-slip surface and optional locking mechanisms.
Fast Delivery: Regular 20ft orders delivered within 15 days.
Quality Assurance: ISO9001, ISO14001, and OHSAS1800 certified with strict QC process.

Company profile

Business Type: Manufacturer/FactoryExport Year: 2021-04-01Average Response Time: ≤8.08h

About Our Factory & Business Background

AddressHanshan Industrial Area ( Lintou ), Maanshan, Ma'anshan, Anhui, China

Our Production Capability & Technical Expertise

Main ProductsDuctile Iron Manhole Cover, Composite Manhole Covers, SMC Drainage Channels, Trench Covers Gully Gratings, Stainless Steel Manhole Cover Grate, Smart Manhole Cover, Grass Basin Well Decorative Manhole Cover, Grass Lawn Manhole Cover, Tree Protection Board, Sponge City Products

Product Q&A

Q:Do you support customization and logo printing?
A:
Yes, we provide both ODM and OEM services. You only need to provide product drawings and detailed requests.
Q:What are the payment terms?
A:
Generally, 30% deposit via T/T before production and 70% balance before shipment.
Q:How do you guarantee mass production quality?
A:
We send samples for confirmation before mass production, have QC during production, and perform final inspection before shipment with testing videos.
Q:What is the delivery time for regular orders?
A:
A regular 20ft order is generally delivered within 15 days.
Q:How long does it take to develop a new molding?
A:
It generally takes 20-30 days to develop a new molding according to drawings.

Send Inquiry

*To:Anhui Feilong New Material Co., Ltd.Anhui Feilong New Material Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

SMC Green Color Grass Basin Well with Frame
Made-in-China.com
Manhole Cover and Frame (D400 clear open 600mm)
Made-in-China.com
Cast Iron Gully Grating and Frame, Qcp520*320
Made-in-China.com