SourcingAI
Try for free
Powered by Made-in-China.com
Square Composite En124 D400 Plastic Manhole Cover
US$8.00-55.00
1 Piece
Sample price:US$55.00/piece.Request sample

Product profile

Customization

Available

After-sales Service

After Service

Warranty

2 Years

Model NO.

FL-CM-R800

Material

SMC

Shape

Square

Certification

RoHS, ISO, CE

Weight

13-35kg

Service

OEM, ODM

Loading Capacity

En124 B125

Transport Package

Plywood Pallet

Specification

400 500 600 700mm

Trademark

feilong

Origin

China

HS Code

392590000

Production Capacity

1000000PCS/Month

Key features

High Load Rating: Meets and exceeds EN124 A15/B125/C250/D400 loading ratings.
Anti-Theft Design: Zero theft value with non-conductive properties and optional locks.
Lightweight Construction: 50% lighter than cast iron, allowing easier transport and installation.
Long Service Life: Over 30 years without cracking or fading, compared to 5 years for cast iron.
Custom Logo Option: Composite material allows for innovative designs and client logos.
Environmental Friendly: Lower carbon footprint and embedded energy compared to cast iron.
Comprehensive Warranty: 2-year warranty coverage for mechanical defects.

Company profile

Business Type: Manufacturer/FactoryExport Year: 2021-04-01Average Response Time: ≤18h

About Our Factory & Business Background

AddressHanshan Industrial Area ( Lintou ), Maanshan, Ma'anshan, Anhui, China

Our Production Capability & Technical Expertise

Main ProductsDuctile Iron Manhole Cover, Composite Manhole Covers, SMC Drainage Channels, Trench Covers Gully Gratings, Stainless Steel Manhole Cover Grate, Smart Manhole Cover, Grass Basin Well Decorative Manhole Cover, Grass Lawn Manhole Cover, Tree Protection Board, Sponge City Products

Product Q&A

Q:Do you support customization and logo printing?
A:
Yes, we provide both ODM and OEM services. You only need to provide product drawings and detailed requests.
Q:What are the payment terms?
A:
Generally, 30% deposit via T/T before production and 70% balance before shipment.
Q:How do you guarantee the quality of mass production?
A:
We send samples for confirmation before mass production, use QC during production, and conduct final inspection with video evidence before shipment.
Q:How long is the delivery time?
A:
A regular 20ft order is generally delivered within 15 days.
Q:How long does it take to develop a new molding?
A:
It generally takes 20-30 days to develop a new molding according to the drawings.

Send Inquiry

*To:Anhui Feilong New Material Co., Ltd.Anhui Feilong New Material Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like