SourcingAI
Try for free
Powered by Made-in-China.com
Ss 304/201/316 Grill Grating Sewage Trench Drainage System Gully Grating
US$8.00-40.00
1 Piece
Sample price:US$55.00/piece.Request sample

Product profile

Customization

Available

After-sales Service

After Service

Warranty

2 Years

Model NO.

FL-GG-S450

Material

SMC

Shape

Square

Certification

RoHS, ISO, CE

Weight

13-35kg

Service

OEM, ODM

Loading Capacity

En124 B125

Product Name

Gully Gating

Transport Package

Plywood Pallet

Specification

450*750*40mm

Trademark

feilong

Origin

China

HS Code

392590000

Production Capacity

1000000PCS/Month

Key features

Customized Color Options: Available in Black or Customized colors to meet specific project needs.
OEM and ODM Services: Full customization support including logo printing and product design based on drawings.
Comprehensive Warranty: 2-year warranty coverage for all mechanical defects and quality issues.
High Load Capacity: Certified EN124 B125 standard suitable for heavy-duty traffic areas.
Multiple Material Choices: Available in Ductile Iron, FRP, SMC, and Stainless Steel 304/201/316.
Fast Delivery Time: Regular 20ft container orders delivered within 15 days from production.
Quality Assurance Process: Strict QC checks during production with testing videos provided before shipment.
ISO Certified Manufacturer: Factory holds ISO9001, ISO14001, and OHSAS1800 certifications for quality standards.

Company profile

Business Type: Manufacturer/FactoryExport Year: 2021-04-01Average Response Time: ≤15h

About Our Factory & Business Background

AddressHanshan Industrial Area ( Lintou ), Maanshan, Ma'anshan, Anhui, China

Our Production Capability & Technical Expertise

Main ProductsDuctile Iron Manhole Cover, Composite Manhole Covers, SMC Drainage Channels, Trench Covers Gully Gratings, Stainless Steel Manhole Cover Grate, Smart Manhole Cover, Grass Basin Well Decorative Manhole Cover, Grass Lawn Manhole Cover, Tree Protection Board, Sponge City Products

Product Q&A

Q:Do you support customization and logo printing?
A:
Yes, we provide both ODM and OEM services. You only need to provide product drawings and detailed requests for customized service.
Q:What are the payment terms?
A:
Generally, 30% deposit via T/T before production and 70% balance before shipment.
Q:How do you guarantee the quality of mass production?
A:
We send samples for confirmation before mass production. During production, QC ensures every process is controlled, and final inspection is done before shipment with testing videos provided.
Q:How long is the delivery time?
A:
Generally, a regular 20ft order will be delivered within 15 days.
Q:How long does it take to develop a new molding?
A:
Generally, it takes within 20-30 days to develop a new molding according to the drawings.

Send Inquiry

*To:Anhui Feilong New Material Co., Ltd.Anhui Feilong New Material Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

En124 C250 Ductile Iron Casting Gully Grating Drainage System
Made-in-China.com