SourcingAI
Try for free
Powered by Made-in-China.com
Storm Drainage Electric Gas Systems B600 Light Duty Square Manhole Grating
US$9.80
1-999 kg
US$0.88
1,000-19,999 kg
US$0.68
20,000+ kg

Product profile

Customization

Available

Material

Steel

Shape

Round

Model NO.

300*300 400*400

Certification

ISO, CE

Key features

ODM & OEM Services: Support customization with logo and specific product drawings.
Diverse Load Classes: Available in A15 to F900 classes for pedestrians to aircraft pavements.
High-Strength Material: Made from GGG500-7 ductile iron ensuring durability and safety.
Comprehensive Certifications: ISO, CE, ISO9001, ISO14001, and OHSAS1800 certified.
Fast Delivery: Regular 20ft orders delivered within 15 days from our large factory.
Custom Molding: New molding development takes 20-30 days based on provided drawings.
Quality Assurance: Sample confirmation, in-process QC, and pre-shipment testing videos.
Surface Treatment: Options include black bitumen or epoxy painting for corrosion resistance.

Company profile

Business Type: Manufacturer/FactoryExport Year: 2021-04-01Average Response Time: ≤11.15h

About Our Factory & Business Background

AddressHanshan Industrial Area ( Lintou ), Maanshan, Ma'anshan, Anhui, China

Our Production Capability & Technical Expertise

Main ProductsDuctile Iron Manhole Cover, Composite Manhole Covers, SMC Drainage Channels, Trench Covers Gully Gratings, Stainless Steel Manhole Cover Grate, Smart Manhole Cover, Grass Basin Well Decorative Manhole Cover, Grass Lawn Manhole Cover, Tree Protection Board, Sponge City Products

Product Q&A

Q:Do you support customization and logo printing?
A:
Yes, we provide both ODM and OEM services. You only need to provide product drawings and detailed requests.
Q:What are the payment terms?
A:
Generally, 30% deposit via T/T before production and 70% balance before shipment.
Q:How do you guarantee mass production quality?
A:
We send samples for confirmation before mass production, conduct QC during production, and provide testing videos before shipment.
Q:What is your delivery time?
A:
Generally, a regular 20ft order is delivered within 15 days.
Q:How long does it take to develop a new molding?
A:
It generally takes 20-30 days to develop a new molding according to the drawings.

Send Inquiry

*To:Anhui Feilong New Material Co., Ltd.Anhui Feilong New Material Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like