SourcingAI
Try for free
Powered by Made-in-China.com
Replacement Hirros Compressed Air Pipeline HEPA Filter 072c 072p 072q 072s
US$50.00
5-49 Pieces
US$40.00
50-199 Pieces
US$30.00
200+ Pieces

Product profile

Customization

Available

Clapboard

without Clapboard

Filter Number

1

Model NO.

072C 072P 072Q 072S

Medium Material

Activated Carbon

Efficiency

0.01um--5um

Filtration Grade

HEPA Filter

Type

Cartridge Filter

Usage

for Compressed Air System

Part Number

Replacement 072c 072p 072q 072s

Size

Standard

MOQ

5PCS

Delivery Time

Usually About 7-10 Working Days

Transport Package

Neutral Boxes Inside, Outside Carton Cases

Specification

standard size

Trademark

LVDA

Origin

China

HS Code

8421999000

Production Capacity

1000 Pieces Per Month

Key features

High-Efficiency Filtration: Removes solid particles, liquid water, oil, and fine dust with efficiency down to 0.01um.
Activated Carbon Material: Utilizes high-quality activated carbon and fiber material for superior purification.
Long Working Lifetime: Designed for extended service life of 6000-8000 hours under normal conditions.
OEM and ODM Support: Full customization available based on customer specifications, drawings, or samples.
Versatile Application: Ideal for compressed air systems, specifically installed before and after dryers.
Multiple Filtration Grades: Available in Q, P, S, F, and C grades to meet different oil content and particle requirements.
Fast Delivery: Standard delivery time is 5-7 working days after receiving advance payment.
ISO Certified Quality: Manufactured under ISO9001, ISO45001, and ISO14001 standards with 100% inspection.

Company profile

Xinxiang Lvda Purification Equipment Corporation
Importers and ExportersHigh Repeat Buyers ChoiceExperienced TeamR&D Capabilities
CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedR&D Capacity: ODM Service Available & OEM Service Available CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc. CertifiedExport Year: 6 years CertifiedNearest Port: Qingdao PortAverage Response Time: ≤5.12h

About Our Factory & Business Background

AddressNo. 001, Jingfang Road, Economic & Development Zone, Xinxiang, Henan, China
Registered Capital10,000,000 RMB
Terms of PaymentLC, T/T, D/P, PayPal, Western Union
International Commercial Terms(Incoterms)FOB, CIF, CFR, EXW
Average Lead TimePeak Season Lead Time: within 15 workdays, one month Off Season Lead Time: within 15 workdays
Minimum Order Quantity1
Supply Chain Partners210

Our Production Capability & Technical Expertise

Main ProductsHydraulic Filter, Air Compressor Filter, Compressed Air Filter, Air Filter, Coalescence Separator Filter, Oil Filter, Metal Filter, Compressor Parts, Oil Purifier Machine, Water Treatment Equipment
Production Lines3
Production MachinesHigh Speed CNC Knife Paper Pleating Machine
QA/QC inspectors2 people
Inspection Type for Finished Products100% inspection(Visual inspection & Function inspection)
Inspection Method for Finished ProductsHave instructions and uniformly followed
R&D Engineers3 people
Traceability of Raw MaterialsYes

Our Industry Experience & Global Business Record

Year of Establishment2016-11-24
Main MarketsSoutheast Asia/ Mideast
Number of Foreign Trading Staff12
Overseas Agent/BranchNo
New Products Launched in Last yearYes

Our Certifications, Standards & Industry Recognition

Management System CertificationISO9001:2015, ISO45001:2018, ISO14001
Cooperated with Fortune 500Yes

Product Q&A

Q:Is the filter custom made or OEM available?
A:
Yes, of course, just offer your required specifications and drawings.
Q:Can you produce products according to a sample?
A:
Yes, we can produce according to your samples or technical drawings. We can build molds and fixtures.
Q:What's your payment terms?
A:
T/T (bank transfer) 30% as deposit, and 70% before delivery. We will show you a photo of the packaged goods before you pay the balancing cost.
Q:What price term can you quote?
A:
(1) FOB (2) CFR (3) CIF (4) DAP (5) CIP (6)DDP
Q:How is your delivery time?
A:
Generally, according to the MOQ qty, it takes 5-7 working days after receiving your advance payment. The specific delivery time depends on the model and quantity of your order.

Send Inquiry

*To:Xinxiang Lvda Purification Equipment CorporationXinxiang Lvda Purification Equipment Corporation
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like