SourcingAI
Try for free
Powered by Made-in-China.com
Durable Three Mode Control High Strength Solar Street Light Rainy Day Performance for City Park Pathway
US$189.00-225.00
1 Piece
Sample price:US$150.00/piece.Request sample

Product profile

Customization

Available

After-sales Service

Replace or Repair

Warranty

5 Years

Model NO.

AGSS11

Light Source

LED Lamp

Lamp Body Material

Aluminum Alloy

Light Type

Solar

Color Temperature

2700-6500K

Power

50W

Technics

Die-Casting

Illumination Time

4~5 Days

Cell Type

LiFePO4

Charging Time (H)

6

Usage

Garden, Street, Highway

IP Rating

IP66

Certification

CE, RoHS, Ik09

Voltage

12V DC

With Light Source

With Light Source

Luminaire Efficiency

up to 210lm/W

Beam Angle

Type II-M etc.

Dimming

Timer/Half Power

Controller

PWM/MPPT Charging

Sensor

PIR

Transport Package

Standard Export Carton

Specification

436*956MM

Trademark

AllGreen or Client's

Origin

China

HS Code

9405429000

Production Capacity

10000PCS/Month

Key features

High Luminous Efficiency: Up to 210lm/W with imported LED chips reaching 220lm/W.
Long Battery Life: LiFePO4 battery with 5-year warranty for most components.
Superior Charging Efficiency: MPPT/PWM controller increases charge efficiency by 15%-30%.
High Efficiency Solar Panel: Monocrystalline solar cells with efficiency greater than 22%.
Eco-Friendly Energy Solution: Utilizes renewable solar energy to reduce fossil fuel dependence.
Durable Construction: Aluminum alloy body with IP66 and IK08/IK09 ratings.
Flexible Beam Angles: Available in Type II-M and Type III-M beam configurations.
Customizable Options: Customizable luminaire efficiency, beam angle, dimming, controller, and sensor.

Company profile

Jiaxing AllGreen Technology Co., Ltd.
Private MoldFull CustomizationQuality AssuranceProduct Certification
Business Type: Manufacturer/FactoryExport Year: 2015-08-15Nearest Port: SHANGHAI, NINGBOAverage Response Time: ≤2.99hTerms of Payment: LC, T/T, D/P, etc.International Commercial Terms(Incoterms): FOB, EXW, CFR, CIF, DDP, CPT, FCA

About Our Factory & Business Background

AddressBuilding 3, No. 58, Meidun Road, Xiuzhou District, Jiaxing, Zhejiang, China
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: within 15 workdays

Our Production Capability & Technical Expertise

Main ProductsLED Street Light, LED High Bay Light, LED Flood Light, Solar LED Light, LED Garden Light, LED High Mast Light, Solar Street Light, LED Stadium Light, Solar Garden Light, LED Floodlight

Our Industry Experience & Global Business Record

Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe

Product Q&A

Q:Do you offer complete OEM/ODM solutions, and what is your process from concept to mass production?
A:
Yes. We cover private labeling, custom designs based on samples/drawings, and new tooling with die-casting, housing, and material customization. Process: requirement analysis -> 3D modeling -> prototyping -> tooling -> pilot run -> mass production, with dedicated project management.
Q:What certifications do your finished luminaires have, and how do you ensure consistent quality across batches?
A:
Our street lights, high bays, etc. can be CE, RoHS, UL, or DLC certified per your market. Quality control includes incoming inspection, in-process checks, 100% burn-in and optical testing, plus full traceability. Batch defect rate is consistently below 0.2%.
Q:Can I order just housings or components separately? What is the lead time for new tooling?
A:
Yes. We supply housings, heat sinks, brackets, and parts for public lighting, with customization in material, structure, and finish. New die-casting tooling lead time: 25-35 working days, depending on complexity.
Q:How do you handle after-sales warranty, especially for large overseas projects?
A:
3-5 years. For confirmed quality issues, we replace defective items free and include spare parts proportionally with each order. Remote video support or on-site visits are available; shipping costs shared based on liability.
Q:What are your typical lead time and payment terms for a first bulk order?
A:
7-14 days for standard finished goods, 15-20 days for private-label, up to 30 days for full custom. Payment: 30% deposit + 70% balance before shipment; other terms negotiable.

Send Inquiry

*To:Jiaxing AllGreen Technology Co., Ltd.Jiaxing AllGreen Technology Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

High Lumen Solar Flood Light with Motion Sensor Control
Made-in-China.com