Powered by Made-in-China.com

Elite Performance LED Work Flood Light 190W with Timer Scheduling Function and Industrial Solar LED Flood Light Charge Management System for Construction Site
US$28.00-38.00
1 Piece
Sample price:US$38.00/piece.Request sample
Product profile
Customization
AvailableColor Temperature
2700-6500KLamp Body Material
Aluminum AlloyModel NO.
AGFL06Power
60WApplication
Park, Square, StreetIP Rating
IP66Certification
CE, EMC, LVD, RoHS, Ik09Operating Voltage
100-240VInput Voltage
100-277V AC (277-480V AC Optional)LED Chips Brand
Luxeon 3030Luminaire Efficiency
up to 190lm/WBeam Angle
90d, Type II etc.Warranty
5 YearsDimming
1-10V/Dali/D4I/Timer etc.Driver
Inventronics/MW/Moso/Sosen etc.Body Material
Die-Casting AluminumTransport Package
Standard Export CartonTrademark
AllGreen or Client'sOrigin
ChinaHS Code
9405429000Production Capacity
20000PCS/MonthKey features
Delivering up to 160 lm/W with an optional 190 lm/W upgrade, this flood light cuts energy costs by over 60% compared to traditional fixtures while providing superior brightness for stadiums, warehouse
Available in 50W to 300W power options with 25/60/90/120 and Type II/III beam angles, this versatile series ensures precise light targeting for any indoor or outdoor application.
Rated IP66 for dust and water jet protection and IK09 for impact resistance, this fixture operates reliably in extreme temperatures from -35C to +50C in any weather condition.
Supporting 0-10V, DALI 2, PWM, and timer dimming protocols, this light integrates seamlessly with smart control systems for dynamic brightness adjustment and additional energy savings.
Built with premium thermal management and optional SPD surge protection, this fixture comes with a 5-year warranty for long-lasting, maintenance-free operation and peace of mind.
Company profile
Business Type: Manufacturer/FactoryExport Year: 2015-08-15Nearest Port: SHANGHAI, NINGBOAverage Response Time: ≤2.64hTerms of Payment: LC, T/T, D/P, etc.International Commercial Terms(Incoterms): FOB, EXW, CFR, CIF, DDP, CPT, FCA
About Our Factory & Business Background
AddressBuilding 3, No. 58, Meidun Road, Xiuzhou District, Jiaxing, Zhejiang, China
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: within 15 workdays
Our Production Capability & Technical Expertise
Main ProductsLED Street Light, LED High Bay Light, LED Flood Light, Solar LED Light, LED Garden Light, LED High Mast Light, Solar Street Light, LED Stadium Light, Solar Garden Light, LED Floodlight
Our Industry Experience & Global Business Record
Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe
Product Q&A
Q:Do you offer complete OEM/ODM solutions, and what is your process from concept to mass production?
A:
Yes. We cover private labeling, custom designs based on samples/drawings, and new tooling with die-casting, housing, and material customization. Process: requirement analysis -> 3D modeling -> prototyping -> tooling -> pilot run -> mass production, with dedicated project management.
Q:What certifications do your finished luminaires have, and how do you ensure consistent quality across batches?
A:
Our street lights, high bays, etc. can be CE, RoHS, UL, or DLC certified per your market. Quality control includes incoming inspection, in-process checks, 100% burn-in and optical testing, plus full traceability. Batch defect rate is consistently below 0.2%.
Q:Can I order just housings or components separately? What is the lead time for new tooling?
A:
Yes. We supply housings, heat sinks, brackets, and parts for public lighting, with customization in material, structure, and finish. New die-casting tooling lead time: 25-35 working days, depending on complexity.
Q:How do you handle after-sales warranty, especially for large overseas projects?
A:
3-5 years. For confirmed quality issues, we replace defective items free and include spare parts proportionally with each order. Remote video support or on-site visits are available; shipping costs shared based on liability.
Q:What are your typical lead time and payment terms for a first bulk order?
A:
7-14 days for standard finished goods, 15-20 days for private-label, up to 30 days for full custom. Payment: 30% deposit + 70% balance before shipment; other terms negotiable.
Send Inquiry
*To:
Jiaxing AllGreen Technology Co., Ltd.
Jiaxing AllGreen Technology Co., Ltd.*Content:
Supplier replies will be sent to your registered email
You may also like
Conssin Portable Adjustable Height Work 4-Panel LED Flood Light with Tripod Stand
US$700.00-1,400.00
10 Pieces(MOQ)
Conssin Outdoor LED Work Light Floodlight with High Colour Render Index Wide Temperature Range
US$700.00-1,400.00
10 Pieces(MOQ)
Powerful High-Performance LED Floodlight with Energy-Saving Features Included
US$12.00
200 Pieces(MOQ)
High-Performance Outdoor LED Flood Light with Adjustable Features
US$10.00-255.00
1 Piece(MOQ)
High-Performance 50W Motion Sensor LED Flood Light with CCT Change
US$3.06-3.62
1,000 Pieces(MOQ)
USB Rechargeable 50W Explosion Proof LED Work Light with Bracket
US$12.45-14.70
500 Pieces(MOQ)
High-Performance Energy-Saving Outdoor LED Flood Light with Motion Detection
US$4.60-15.00
100 Pieces(MOQ)



















