HDPE/High-Density Polyethylene Biogas Anaerobic Digester/Pool/Plant
Negotiable
1 Piece

Product profile

Customization

Available

Method

Biological Treatment

Usage

Industrial

Model NO.

ALONG

Material

HDPE Geomembrane

Digester Volume

6000m3

Waste

Pig Manure

Hydarulic Retention Time

50 Days

Investment Scale

Us$150000

Cod Removal Rate

85%

Power Generation

1*200kw Acg

Transport Package

Wooden Case

Specification

6000 cubic meters

Trademark

ALONG BIOGAS

Origin

China

HS Code

85020206

Production Capacity

200 Pieces

Key features

HDPE Membrane Material: Constructed with high-density polyethylene geomembrane meeting USA GRI and ASTM standards.
High COD Removal Rate: Achieves up to 85% COD removal rate resulting in clean liquid output.
Large Storage Capacity: Single lagoon volume can reach up to 60,000 cubic meters with no structural limits.
Low Construction Cost: Average cost per cubic meter is approximately US$ 4 to 10 with simple installation.
High Gas Production: HDPE membrane offers excellent heat absorption for high biogas yield in warm climates.
Long Retention Time: Features long hydraulic and waste retention times for efficient fermentation.
Integrated Design: All-in-one solution combining fermentation and biogas storage in a single unit.
Low Operating Costs: Designed for low power consumption and simple operation with minimal maintenance.

Company profile

Business Type: Manufacturer/Factory, Trading CompanyExport Year: 2008-07-01Nearest Port: Shenzhen, GuangzhouAverage Response Time: >24hTerms of Payment: LC, T/T, Western UnionInternational Commercial Terms(Incoterms): FOB, CFR, CIF, EXW

AI-Powered supplier vetting

SummaryHunan Along New Energy Technologies Co., Ltd. is identified as both a trading company and manufacturer/factory in China, focused on biogas systems and related equipment. The supplier reports ISO 14001 and ISO 9001 certifications, export activity since 2008, self-operated import/export rights, and exports to multiple global regions. Its stated operational resources include a factory in Dongguan, more than 10 production lines, 50 years of cumulative R&D engineer experience, and 11–20 quality-control staff. Reported lead times are one month in off-peak periods and 2–3 months during peak periods. However, the provided information does not substantiate after-sales service arrangements, financial credibility beyond registered capital information, customization capability, or identifiable customer cases.
Supplier typeThe supplier is explicitly classified as both a trading company and a manufacturer/factory. It lists biogas purification treatment, dehumidifiers, anaerobic digesters, and generators, while also reporting a physical factory in Dongguan with more than 10 production lines.
CertificationsThe supplier reports holding ISO 14001 and ISO 9001 management-system certifications. These directly support environmental-management and quality-management credentials, although certification scope and validity details are not provided.
R&D capabilityThe supplier offers multiple biogas technologies, including upgrading, purification, desulphurization, scrubbers, gas holders, and CSTR digesters. It also reports 50 years of cumulative R&D engineer experience, which is positive evidence of technical development resources, but no specific patents, novel products, or documented innovations are provided.
Production capacityThe supplier reports a Dongguan factory, more than 10 production lines, 11–20 quality-control staff, international export markets, self-operated import/export rights, and stated lead times of one month off-peak and 2–3 months peak. These details support established production and fulfillment capability.

Product Q&A

Q:What is the maximum volume of a single lagoon?
A:
The single lagoon volume can be up to 60,000 cubic meters without structural limits.
Q:What standards does the HDPE membrane meet?
A:
The membrane conforms to USA GRI quality standards and ASTM testing standards.
Q:What is the average cost per cubic meter?
A:
The average cost is about US$ 4 to 10 per cubic meter.
Q:What is the COD removal rate?
A:
The system achieves a COD removal rate of up to 85%.
Q:What is the lead time for production?
A:
Lead time is one month during off-peak season and 1-3 months during peak season.

Send Inquiry

*To:Hunan Along New Energy Technologies Co., Ltd.Hunan Along New Energy Technologies Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

Longantai Wastewater Aeration System Treatment Plant
Made-in-China.com
Sustainable Biogas Power Plant for Animal Waste Management
Made-in-China.com
Palm Oil Wastewater Treatment Biogas Plant
Made-in-China.com