Powered by Made-in-China.com
HDG Standard K-Stage System Kwikstage Scaffold Quick Stage Scaffolding Material for Construction
US$12.87
100 Pieces
Sample price:US$10.00/piece.Request sample
Product profile
Customization
AvailableMaterial
SteelType
FixedModel NO.
RAT05-9Structural Style
Multi-Pole ScaffoldingFramework
Frame Combined ScaffoldingSupporting Mode
Projecting ScaffoldingLapping Form
Full ScaffoldingErection Position
External ScaffoldingMove Method
Integral Lifting ScaffoldingScaffolding Part Type
Scaffolding PlanksConstruction Properties
Building ScaffoldHDG
Q235/Q345Transport Package
NormalSpecification
48.3*3.2Trademark
Rapid Aluminum Co., LtdOrigin
ChinaProduction Capacity
100000ton/YearKey features
High Load Capacity: Carrying capacity reaches 20T for 60mm and 17T for 48mm tubes.
Long Service Life: Designed for more than 25 years of service time.
Fast Assembly: No special tools required; only hammer and spirit level needed.
Standard Compliance: System complies with EN12811 and ANSI/SSFI SC100-5/05.
Low Maintenance: Requires low maintenance to keep in top working condition.
Customization Options: Supports customization from samples, designs, and flexible options.
Company profile
CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedR&D Capacity: ODM Service Available & OEM Service Available CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc. CertifiedExport Year: 19 Years CertifiedNearest Port: Shanghai PortAverage Response Time: ≤1.74h
AI-Powered supplier vetting
SummaryRapid Formwork & Scaffolding Co., Ltd. is a China-based limited company established in 2007, with 312 employees and operations in Jiangsu. Its stated products include ringlock, metal, and general scaffolding. The supplier demonstrates broad customization, 3D design, ODM, OEM, inventory, export, and complaint-handling capabilities. It reports 16 years of export experience, 90% export sales, Shanghai Port proximity, and one-month lead times in both peak and off-season periods. However, it lacks overseas agents, branches, showrooms, warehouses, and an available SDK. A manufacturing-capacity contract with related subcontractors is explicitly absent. The provided audit record identifies BV and a report validity period, but does not establish a favorable certification or audit result. Financial evidence is insufficient for assessment, and digital process integration is weak based on the stated absence of ERP, OA, CRM, and SAP systems.
Supplier typeThe supplier is identified as Rapid Formwork & Scaffolding Co., Ltd., a combined business entity and limited company established in China in 2007, with 312 employees. Its stated primary products are ringlock scaffold, metal scaffolding, and scaffolding, indicating a manufacturer or supplier focused on scaffolding products.
After-Sales capabilityThe supplier has documented and followed procedures for corrective and preventive actions and customer complaints, plus inventory capability and stated quotation, payment, and delivery arrangements. However, it has no overseas warehouse, showroom, agent, branch, or stated overseas-service country, limiting evidence of localized after-sales support.
R&D capabilityThe supplier reports new products during the past year, 3D software design, ODM services, and broad design customization. Conversely, it has no available SDK and no ERP, OA, CRM, or SAP system integration, indicating product-development capability but limited evidence of digital innovation infrastructure.
Production capacityEvidence includes 312 employees, inventory capability, uniformly followed finished-product inspection instructions, written supplier-service assessment procedures, and one-month average lead times in both peak and off-season. A material weakness is the explicit absence of a valid manufacturing-capacity contract with related subcontractors.
Customization capabilityThe supplier explicitly supports customization from samples, designs, full customization, minor customization, flexible customization, 3D software design, ODM, and OEM for popular brands. These statements provide direct evidence of broad customization capability.
Product Q&A
Q:What standards does the scaffolding system comply with?
A:
The system complies with EN12811 and ANSI/SSFI SC100-5/05.
Q:What is the carrying capacity of the scaffolding?
A:
The carrying capacity can reach 20T for 60mm tubes and 17T for 48mm tubes.
Q:How long is the service life of the product?
A:
The service time is more than 25 years.
Q:What tools are required for assembly?
A:
No special tools are required; only a hammer and spirit level are needed.
Q:What is the delivery time after deposit?
A:
Delivery is 25 days after deposit.
Send Inquiry
*To:
Rapid Formwork & Scaffolding Co., Ltd
Rapid Formwork & Scaffolding Co., Ltd*Content:
Supplier replies will be sent to your registered email
You may also like
Stage System Scaffold Heavy Duty Kwikstage Scaffolding Materials
US$8.90-12.90
100 Pieces(MOQ)
Steel Ringlock Scaffolding Material for Construction with HDG Surface Treatment
US$8.80-15.00
200 Pieces(MOQ)
Steel Aluminium Movable Bridge Wall Kwikstage Scaffolding System Materials
US$79.00-90.00
1 Piece(MOQ)
CE Certificate Standard Cuplock Scaffolding Steel Building Material for Project Scaffold Ledger
US$2.00-20.00
100 Pieces(MOQ)
Top-Quality Layher Modular Ringlock System Scaffold Construct Material for Building
US$650.00-800.00
1 Ton(MOQ)
Hot Sale Access Vertical/Standard Horizontal/Ledger Ringlock System Building Material for Construction
US$850.00-1,400.00
1 Ton(MOQ)
Layher Modular System Scaffolding Building Material for Bridges/Building Construction
US$3.00-20.00
100 Pieces(MOQ)
Easy Scaffolding Construction Building Material HDG Galvanized Vertical Ringlock Scaffold
US$10.00-11.00
500 Pieces(MOQ)
Ringlock Scaffolding Accessories Ringlock Standard Scaffolding Material Construction
US$1,400.00
1,000 Pieces(MOQ)
Painted Cuplock Standard Scaffolding Building Material for Constructin En12811 Certificate
US$2.00-20.00
100 Pieces(MOQ)
Brackets Boards Aluminium Movable Bridge Scaffolding System Materials
US$79.00-90.00
1 Piece(MOQ)
Saffolding System Painted Galvanize Cuplock Standard Ledger Scaffold as Construction Material with Base Jack
US$2.00-20.00
100 Pieces(MOQ)
Building Construction Materials for Layher Scaffolding System Use
US$3.00-30.00
100 Pieces(MOQ)
ISO Scaffolding for Sale a Scaffolding Plank Frame System Materials
US$78.00-90.00
1 Piece(MOQ)
Modular System Scaffolding Construction Materials for Bridge/Building/Tunnel
US$3.00-20.00
100 Pieces(MOQ)
Heavy Duty Prop Scaffold Prop Scaffolding Material with Cup Nut for Building Material and Formwork
US$5.00-40.00
1 Piece(MOQ)
En12811/CE/SGS Certifie Ringlock Scaffolding Material for Construction
US$4.87-16.87
10 Pieces(MOQ)
Concrete Formwork Steel Scaffold Ringlock System Scaffolding Building Material with Screw Base Jack
US$79.00-191.00
100 Pieces(MOQ)
High Quanlity Building Material Hy Scaffolding Frame System Formwork Construction Material for Sale
US$6.00-14.00
100 Pieces(MOQ)



















