SourcingAI
Try for free
Powered by Made-in-China.com
OEM Available Food Grade Silicone Folding Water Cup for Travel & Camping
US$0.68
200-999 Pieces
US$0.63
1,000-4,999 Pieces
US$0.50
5,000+ Pieces

Product specifications

capacity

color

Sample price:US$2.00/piece.Request sample

Product profile

Customization

Available

Volume

200ml

Collapsible

Yes

Model NO.

zysp

Handle

with Handle

Cover

with Cover

Product Name

Silicone Folding Water Cup

Materials

100% Food Grade Silicone

MOQ

200PCS

Applicable People

Unisex

Occasion

Camping

Function

Resuable Water Cup

Usage

Coffee.Tea.Beer.Water .Beverage

OEM/ODM

Highly Welcomed

Logo

Customized Logo Acceptable

Sample

Avalible

Selling Units

Single Item

Place of Origin

Fujian, China

Specification

Customized

Trademark

zy

Origin

China

HS Code

3924100000

Key features

Food Grade Silicone Material: Made of 100% food grade silicone, safe for coffee, tea, beer, and water.
Collapsible Design: Folds flat for easy storage and portability during travel and camping.
Customized Logo Acceptable: Supports OEM/ODM services with customizable logo printing options.
ISO 9001 Certified: Manufactured under strict quality control with ISO 9001 certification.
Versatile Usage: Suitable for coffee, tea, beer, water, and various beverages.
Sample Availability: Free existing samples available; custom design samples chargeable but refundable.

Company profile

Xiamen Zhongying Electronic Technology Co., Ltd.
Years of Export ExperienceODM ServicesOEM ServicesStandardized quality control
Business Type: Manufacturer/Factory CertifiedR&D Capacity: ODM Service Available & OEM Service AvailableExport Year: 2005-05-01Nearest Port: Xiamen, Shenzhen, Ningbo, ShanghaiAverage Response Time: ≤7.63hTerms of Payment: T/T, Western Union, LC

AI-Powered supplier vetting

SummaryThe supplier is a trade company with a strong focus on manufacturing and sales of power and electrical equipment, offering both ODM and OEM services. They have robust customization capabilities and a systematic approach to quality control and after-sales service. However, their financial records show zero revenues and profits over the last few years, which raises concerns about financial credibility. They hold ISO9001:2015 certification and conduct regular fire drills, indicating a commitment to sustainable practices. The supplier lacks overseas infrastructure and has not participated in offline trade shows, limiting their international presence.
Supplier typeThe supplier is classified as a trade company with a business scope that includes manufacturing and sales of electrical and power equipment.
CertificationsThe supplier holds the ISO9001:2015 certification and conducts regular fire drills, showing a commitment to quality and safety standards.
After-Sales capabilityThe supplier has documented procedures and records for handling customer complaints and corrective actions, indicating a structured after-sales service capability.
Financial creditFinancial data shows zero revenues and profits over recent years, suggesting potential financial instability or credibility issues.
R&D capabilityThe supplier has launched new products in the past year and provides ODM services, although they lack SDK availability for R&D.
Production capacityThe supplier has a variety of production facilities and maintains a consistent lead time, indicating competent production capability.
Customization capabilityThe supplier offers a wide range of customization options, from minor to full customization, demonstrating flexibility in meeting client needs.

Product Q&A

Q:What is your MOQ?
A:
Our standard MOQ is 500 pcs, but small quantity for the first trial order is acceptable.
Q:Can I get a sample?
A:
Sure. We usually provide existing samples for free. But samples are chargeable for custom designs which can be refunded when the order reaches a certain quantity.
Q:How long is the sample lead time?
A:
For existing samples, it takes 2-3 days. If you want your own designs, it takes 5-7 days mainly depending on your exact designs.
Q:How long is the production lead time?
A:
It takes 10-15 days for MOQ.
Q:How much is the freight charge?
A:
For your cost and timely consideration, we suggest shipping by express for small quantities, and large quantities by air or sea. Cost depends on the shipping method and exact quantities.

Send Inquiry

*To:Xiamen Zhongying Electronic Technology Co., Ltd.Xiamen Zhongying Electronic Technology Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like