SourcingAI
Try for free
Powered by Made-in-China.com
New Design DC Fast Solar Electric Charging Station 7kw
US$270.00
1-9 Pieces
US$265.00
10-19 Pieces
US$260.00
20-49 Pieces
US$255.00
50+ Pieces
Sample price:US$330.00/piece.Request sample

Product profile

Customization

Available

Number of Charging Interfaces

One Pile with One Charge

Location

Private Usepublic Use

Model NO.

KY-AC

Installation

Wall Mounted

Charge Method

Normal Charge

Noise Control

≤60dB

Mtbf

100, 000 Hours

Cooling Method

Forced Air Cooling

Protection Level

Level IP55

Working Elevation

<2000m

Working Humidity

5%~95% Non-Condensing Cream

Security Function

"Overvoltage Protection, Undervoltage Protection

Measurement Accuracy

Level 0.5

Type

Fast EV Charging Station

Certification

CE

Transport Package

Can Be Customized According to Your Needs

Specification

292*126*417(MM)

Trademark

KAYAL

Origin

China

Production Capacity

50000

Key features

OEM/ODM Customization: Professional manufacturer offering full OEM and ODM services for EV chargers.
Multi-Mode Networking: Supports 2G, 4G, WiFi, and applet connectivity for flexible operation.
Comprehensive Protection: Features overvoltage, undervoltage, overcurrent, short circuit, and surge protection.
High MTBF Reliability: Designed with a Mean Time Between Failures (MTBF) of 100,000 hours.
IP55 Protection Level: Robust IP55 protection level ensures durability in various working environments.
CE Certified Quality: Product holds CE certification ensuring compliance with European safety standards.
Low Noise Operation: Forced air cooling system ensures noise control is kept below 60dB.
Flexible Installation: Supports wall-mounted or floor-mounted installation with corresponding accessories.

Company profile

Zhejiang Anfu New Energy Technology Co.,Ltd.
Importers and ExportersYears of Export ExperienceExhibition ExperienceHigh Repeat Buyers Choice
CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedR&D Capacity: ODM Service Available & OEM Service Available CertifiedExport Year: 12 Years CertifiedNearest Port: Ningbo Port, Shanghai PortAverage Response Time: ≤4.94h CertifiedTerms of Payment: LC, T/T, D/P, etc.

AI-Powered supplier vetting

SummaryThe supplier is identified as a professional new-energy technology supplier with R&D, 3D design, SDK, ODM, OEM, and customization capabilities. It reports independent intellectual property, software copyright, and multiple domestic and international certifications, including CCC, CE, TUV, UL, and CB. Production evidence includes more than 10 production lines, 50 quality-control staff, and stated EV charging-station output of 100,000 pieces. Service procedures exist for supplier assessment, corrective actions, and complaint handling, but the latter two lack written records. The supplier has valid manufacturing contracts with associated subcontractors and supports several quotation and payment terms. However, it reports no in-stock capacity, overseas warehouse, overseas showroom, overseas agents or branches, and lists domestic markets as its primary export market; overseas service coverage is recorded as zero. Financial credibility cannot be confirmed because the slices provide years of financial data but...
Supplier typeThe supplier is explicitly described as a professional technical supplier and operates in new-energy-related manufacturing and sales, including photovoltaic equipment and new-energy vehicle equipment. It also reports manufacturing-related contracts with associated subcontractors, indicating a manufacturing-oriented business model.
CertificationsThe company description states that the supplier has independent intellectual property rights, computer software copyright, a certification referred to as “keptop,” telecommunications technology laboratory test reports, and CCC, CE, TUV, UL, and CB certifications. These are explicit certification and compliance indicators, although the slices do not provide certificate numbers, scopes, or validity dates.
After-Sales capabilityThe supplier has procedures for corrective and preventive actions and customer complaint handling, but no written records are available for either process. It has no overseas warehouse, showroom, overseas agent, or branch, and reports zero countries with overseas services; therefore, documented after-sales execution and international coverage are limited in the provided evidence.
R&D capabilityThe supplier reports professional R&D capability, available SDK support, new products launched within the past year, ODM services, 3D software design, and independent intellectual property and software copyright. These explicit capabilities support a positive assessment of technical innovation resources.
Production capacityProduction evidence includes more than 10 operating production lines, 50 quality-control staff, stated EV charging-station output of 100,000 pieces, one-month lead times in both peak and off-peak seasons, six qualified service-capability suppliers, and valid contracts with associated subcontractors. The supplier also has written and recorded procedures for effective supplier-capability assessment, supporting production readiness.
Customization capabilityThe supplier explicitly offers customization from samples, designs, full customization, minor customization, and flexible customization, together with 3D software design, ODM, and OEM services for well-known brands. This indicates broad documented customization coverage.

Product Q&A

Q:What are your terms of payment?
A:
Alibaba online fast payment, T/T
Q:Do you test all your chargers before shipping?
A:
All major components are tested before assembly and each charger is fully tested before shipped
Q:Can I order some samples? How long?
A:
Yes, and usually 7-10 days to production and 7-10 days to express.
Q:How long to fully charge a car?
A:
To know how long to charge a car, you need to know the OBC(on board charger) power of the car, the car battery capacity, the charger power. The hours to fully charge a car =battery kw.h/obc or charger power the lower one. For e.g, the battery is 40kw.h, obc is 7kw, charger is 22kw, the 40/7=5.7hours. If the obc is 22kw, then 40/22=1.8hours.
Q:Are you Trading Company or manufacturer?
A:
We are professional EV charger manufacturer.

Send Inquiry

*To:Zhejiang Anfu New Energy Technology Co.,Ltd.Zhejiang Anfu New Energy Technology Co.,Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like