SourcingAI
Try for free
Powered by Made-in-China.com
Dissolved Air Flotation (daf) for Waste Water Treatment
US$13,608.00-22,506.00
1 Piece

Product profile

Customization

Available

After-sales Service

1year

Warranty

1year

Model NO.

DAF

Type

Flotation Machine

Method

Physical Treatment

Usage

Industrial

Transport Package

Wodden Package

Specification

customized

Trademark

Ecopro

Origin

Shanghai

Production Capacity

500/Week

Key features

Physical Treatment Method: Removes suspended matter like oil and solids by dissolving air under pressure.
Automatic Slagging Control: Scrapes scum to the slag tank automatically controlled by liquid level.
Non-Clogging Releasing: High-efficiency releasing mechanism ensures continuous operation.
Micro Bubbles Generation: Forms tiny bubbles that adhere to suspended matter for effective flotation.
Subsurface Capture: Efficiently captures contaminants beneath the water surface.
1-Year Warranty Coverage: Provides 1-year warranty for mechanical defects and parts.
Broad Industry Application: Suitable for municipal sewage, slaughter houses, metallurgy, and more.
Flexible Model Selection: Models selected based on wastewater type, SS, oil content, and pH.

Company profile

Business Type: Manufacturer/Factory, Trading CompanyExport Year: 2017-08-01Nearest Port: Shanghai PortAverage Response Time: ≤6.02hTerms of Payment: LC, T/T, D/P, etc.International Commercial Terms(Incoterms): FOB, CFR, CIF, DAT, FAS, DDP, DAP, CIP, CPT, FCA, EXW

AI-Powered supplier vetting

SummaryShanghai Ecopro Environmental Engineering Co., Ltd. is identified as both a trading company and manufacturer/factory in China, with a Shanghai head office and a factory in Wuxi, Jiangsu. It offers wastewater-treatment equipment and reports more than 10 production lines, defined annual capacities for dissolved air flotation systems, screw presses, and screens, and export activity covering multiple global regions. The supplier holds ISO 9001 certification and reports 6–10 R&D engineers and 6–10 quality-control staff. Its after-sales policy includes repair and maintenance services, with some services chargeable during and after warranty periods. Evidence of customization, financial strength, and innovation beyond stated engineering resources is limited. One associated buyer is identified, but no detailed project performance or customer reference information is provided.
Supplier typeThe supplier is described as a trading company and manufacturer/factory, while another record identifies it as a trading company. Its head office is in Shanghai and its factory is located in Wuxi, Jiangsu, indicating an operating structure involving both commercial and production functions.
CertificationsThe supplier reports holding ISO 9001 certification. This provides explicit evidence of a certified quality-management system, although no certification scope, issuing body, or validity period is stated.
After-Sales capabilityThe supplier describes professional after-sales support, repair services based on machine model and nameplate information, and maintenance that can preserve machine function. It also states that warranty exclusions and post-warranty maintenance are paid services, showing a defined service policy but not quantified service coverage or response performance.
Production capacityThe supplier reports more than 10 production lines and annual capacities of 200 dissolved air flotation systems, 300 screw presses, and 500 screens. It also states lead times within 15 working days in off-peak periods and one month during peak periods, providing explicit evidence of established production capacity and delivery planning.

Product Q&A

Q:What is the warranty period?
A:
We provide a 1-year warranty for the equipment.
Q:What industries can use this DAF system?
A:
It is suitable for municipal sewage, slaughter houses, metallurgical industry, printing & dyeing, metal processing, mining, and electronic industries.
Q:How is the optimal model selected?
A:
Selection depends on wastewater type, SS content, oil & grease content, pH level, BOD, and COD.
Q:What is the lead time for production?
A:
Peak season lead time is one month, while off-season lead time is within 15 workdays.
Q:What payment terms are accepted?
A:
We accept LC, T/T, D/P, PayPal, Western Union, and Money Gram.

Send Inquiry

*To:Shanghai Ecopro Environmental Engineering Co., Ltd.Shanghai Ecopro Environmental Engineering Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

Daf-System-Dissolved-Air-Flotation-for-Industrial
Made-in-China.com
Ecopro Dissolved Air Flotation for Wastewater Treatment
Made-in-China.com