SourcingAI
Try for free
Powered by Made-in-China.com
DJ Light LED Stage 10PCS 40W 4in1 RGBW Moving Head Beam Bar Light
US$1.00
1 Piece

Product profile

Customization

Available

Light Source

LED

Material

Iron

Model NO.

AMD9967

Emitting Color

RGBW

Control Channel

16/45CH

Strobe

Adjustable Speed Strobe

Control Mode

DMX512, Master-Slave, Auto Movement, Sound Control

Certification

CE, RoHS

Voltage

AC100-240V

Model

AMD9967

Lamp Power

10*40W

Color

RGBW

Function

DOT Control, Horse Racing Effect

Transport Package

Carton Package

Specification

105*9*13cm

Trademark

AOMEIDI

Origin

Guangzhou, China

HS Code

9405409000

Production Capacity

1000PCS/Month

Key features

4-in-1 RGBW Beam Bar: Features 10pcs 40W LEDs with RGBW color mixing and adjustable strobe effects.
Flexible Control Modes: Supports DMX512, Master-Slave, Auto Movement, and Sound Control modes.
OEM/ODM Customization: Accepts custom logo printing and OEM/ODM orders for branding needs.
1-Year Warranty: Provides a one-year warranty with free replacement parts for defects.
CE & RoHS Certified: Products meet CE and RoHS safety and environmental standards.
Professional Manufacturer: Established in 2006, specializing in stage lighting manufacturing.

Company profile

CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedR&D Capacity: ODM Service Available & OEM Service AvailableExport Year: 2010-02-08 CertifiedNearest Port: Guangzhou Port, Shenzhen PortAverage Response Time: ≤7.92h CertifiedTerms of Payment: T/T

AI-Powered supplier vetting

SummaryGuangzhou Ao Mei Di Stage Lighting Equipment Co., Ltd. is a China-based limited-company factory specializing in stage, cultural landscape, and urban lighting. Evidence indicates six production lines, stated beam-light output of 15,000 pieces, and lead times within 15 working days in both peak and off-peak seasons. The supplier exports to multiple global regions and accepts OEM business. It holds an ISO9001:2015 certificate, has 2 R&D engineers and 6–10 quality-control staff, and reports applications in major events, television facilities, theaters, bars, and other venues. After-sales processes, financial reliability, and the depth of innovation resources are not sufficiently documented.
Supplier typeThe supplier is identified as Guangzhou Ao Mei Di Stage Lighting Equipment Co., Ltd., a China-based limited company and factory in Guangzhou, Guangdong. Its stated business covers manufacturing and related engineering/service activities for stage and urban lighting.
CertificationsThe supplier explicitly reports holding an ISO9001:2015 management-system certificate. No additional certifications or certificate scope and validity details are provided.
Production capacityThe supplier reports 6 production lines, beam-light output of 15,000 pieces, a 1,000.0 m² manufacturing plant, and order fulfillment within 15 working days during both peak and off-peak seasons. It also reports 6–10 quality-control staff, providing explicit evidence of established production and quality resources.
Customization capabilityThe supplier states that it undertakes OEM business for world-famous brands and provides development, manufacturing, engineering, and service. This directly supports OEM/customization availability, although no specific customization scope, tooling capability, or project examples are detailed.
Client casesReported applications include the 2008 Beijing Olympic Games Bicycle Venues, the 2010 Shanghai World Expo Macau Pavilion, television production bases and stations, theaters, bars, wedding celebrations, and other performances. These named or described applications provide concrete evidence of use across event, broadcast, theater, and entertainment settings.

Product Q&A

Q:Are you a factory or trade company?
A:
We are a professional stage lighting factory since 2006.
Q:Do you accept OEM or ODM?
A:
Yes, OEM and ODM orders are warmly welcomed.
Q:What is the MOQ?
A:
We do not have a strict MOQ limitation, but larger orders receive more discounts.
Q:What is the delivery time?
A:
Samples take 3-7 days. Bulk orders, such as a 20-foot container, take about 1 month, but urgent orders can be discussed.
Q:What are the payment terms?
A:
We accept T/T, Western Union, MoneyGram, and PayPal.

Send Inquiry

*To:Guangzhou Ao Mei Di Stage Lighting Equipment Co., Ltd.Guangzhou Ao Mei Di Stage Lighting Equipment Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like