SourcingAI
Try for free
Powered by Made-in-China.com
Aps Explosion Proof Air Oil Cooled Transformer Rectifier
US$575.00-33,000.00
1 Piece

Product profile

Customization

Available

Application

Power, Electronic, Rectifier

Phase

Three

Model NO.

630kva

Core

Shell-type Transformer

Cooling Method

Oil-immersed Type Transformer

Winding Type

Multi-winding Transformer

Certification

ISO9001-2000

Frequency Characteristics

Intermediate Frequency

Shape of Core

OD

Rated Capacity

630kVA

High Voltage

6/6.3/10/10.5/11kv

Low Voltage

0.4kv

Vector Group Symbol

Dyn11yyn0

No-Load Loss

0.81kw

Load Loss

6.20kw

No-Load Current

1.1%

Impedance Voltage

4.5%

Hvtap Range

About 5%

Transport Package

Wood Packing

Specification

1580*1040*1270mm

Trademark

APS

Origin

China

HS Code

851420009

Production Capacity

100

Key features

Explosion Proof Design: Aps Explosion Proof Air Oil Cooled Transformer Rectifier for safe industrial use.
Oil Immersed Cooling: Oil-immersed type transformer with shell-type core for efficient heat dissipation.
Wide Capacity Range: Available capacities from 10kVA to 4000kVA to suit various power needs.
Flexible Customization: Customizable rated capacity, voltage, and vector group based on samples or designs.
ISO9001 Certified: Manufactured under ISO9001-2000 certification ensuring quality standards.
Intermediate Frequency: Designed for intermediate frequency applications in induction furnaces.
Low Failure Rate: Practical design engineered for higher performance and lower failure rates.
100% Inspection: Finished products undergo 100% visual and functional inspection before delivery.

Company profile

APS Induction Furnace (Taizhou) Co., Ltd.
High Repeat Buyers ChoiceQuality Assurance
Business Type: Manufacturer/Factory CertifiedR&D Capacity: ODM Service Available & OEM Service Available CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc. CertifiedExport Year: 3 Years CertifiedNearest Port: Shanghai PortAverage Response Time: ≤5.08h

About Our Factory & Business Background

AddressArea a, Building 1, No. 100, Century Avenue, Jiulong Industrial Park, Hailing District, Taizhou, Jiangsu, China
Terms of PaymentLC, T/T, D/P, PayPal, Western Union, Small-amount payment
International Commercial Terms(Incoterms)FOB, CIF, CFR, EXW
Average Lead TimePeak Season Lead Time: 1-3 months Off Season Lead Time: within 15 workdays
Minimum Order Quantity1 Set
Supply Chain Partners30

Our Production Capability & Technical Expertise

Main ProductsInduction Furnace, Melting Furnace, Electric Furnace, Vacuum Furnace, Water Cooled Cable, Induction Heating Coil, Induction Furnace Parts, Electric Arc Furnace, Billet Heating Furnace, Submerged Arc Furnace 
Production Lines1
Production MachinesPlasma Cutting Machine, Engraving Machine, Sawing Machine, Lathe, Drilling Machine, Milling Machine, Shot Blasting Machine, Coating Equipment
QA/QC inspectors1 people
Inspection Type for Finished Products100% inspection(Visual inspection & Function inspection)
Inspection Method for Finished ProductsHave instructions and uniformly followed
R&D Engineers5 people
Traceability of Raw MaterialsYes

Our Industry Experience & Global Business Record

Main MarketsSouth America, Europe, Southeast Asia/ Mideast, Africa, East Asia(Japan/ South Korea)
Number of Foreign Trading Staff2
Overseas Agent/BranchNo
New Products Launched in Last yearYes

Product Q&A

Q:What is the rated capacity range?
A:
The rated capacity ranges from 10kVA to 4000kVA, with specific models available for various power requirements.
Q:Can the transformer be customized?
A:
Yes, transformers can be customized. We offer customization from samples, designs, full customization, minor customization, and flexible customization options.
Q:What is the cooling method used?
A:
The transformer uses an oil-immersed cooling method with a shell-type core and multi-winding configuration.
Q:What certifications does the product have?
A:
The product is certified under ISO9001-2000 standards.
Q:What is the lead time for production?
A:
The average lead time is 1-3 months during peak season and within 15 workdays during the off-season.

Send Inquiry

*To:APS Induction Furnace (Taizhou) Co., Ltd.APS Induction Furnace (Taizhou) Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

New Graphite Material Projectzhs-2× 60ka / 200V 12 Phase Rectifier
Made-in-China.com
200kVA 11/0.4kv, 11/0.415kv Distribution Transformer
Made-in-China.com
Reliable Moistureproof 35kv 2000kVA Box Type Oil Transformer
Made-in-China.com