Powered by Made-in-China.com
Industrial Customized Water Cooled Cable for Steel Melting High Frequency Induction Furnace
US$200.00-800.00
1 Piece
Product profile
Customization
AvailableCertification
CE, ISOCustomized
ElectricitySurface Treatment
PaintedRange of Applications
IndustrialType
Furnace Heat PipeOriginal Material
Oxygen CopperSize
CustomizedTransport Package
Internation StandardTrademark
APSOrigin
ChinaHS Code
8514200090Production Capacity
100Key features
Customized Cable Specifications: Customized size, material (oxygen copper), and cable head type to match specific furnace models.
24-Hour Spare Parts Delivery: Complete spare parts warehouse ensures regular parts ship within 24 hours for urgent needs.
Global Online Commissioning: On-line commissioning service provided without geographical restrictions for coreless induction systems.
Cost-Effective Original Parts: Original spare parts for circuit boards and reactors provided at cost price to save purchasing expenses.
System Upgrade & Retrofit: Capacity-upgrade and retrofit services to meet latest standards without investing in new systems.
Comprehensive Employee Training: Training services provided to instruct employees in the safe and efficient operation of the system.
100% Finished Product Inspection: Strict visual and function inspection for all finished products to ensure quality control.
CE & ISO Certified Quality: Products meet international standards with CE and ISO certifications for industrial reliability.
Company profile
Business Type: Manufacturer/Factory CertifiedR&D Capacity: ODM Service Available & OEM Service Available CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc. CertifiedExport Year: 3 Years CertifiedNearest Port: Shanghai PortAverage Response Time: ≤11.39h
About Our Factory & Business Background
AddressArea a, Building 1, No. 100, Century Avenue, Jiulong Industrial Park, Hailing District, Taizhou, Jiangsu, China
Terms of PaymentLC, T/T, D/P, PayPal, Western Union, Small-amount payment
International Commercial Terms(Incoterms)FOB, CIF, CFR, EXW
Average Lead TimePeak Season Lead Time: 1-3 months Off Season Lead Time: within 15 workdays
Minimum Order Quantity1 Set
Supply Chain Partners30
Our Production Capability & Technical Expertise
Main ProductsInduction Furnace, Melting Furnace, Electric Furnace, Vacuum Furnace, Water Cooled Cable, Induction Heating Coil, Induction Furnace Parts, Electric Arc Furnace, Billet Heating Furnace, Submerged Arc Furnace
Production Lines1
Production MachinesPlasma Cutting Machine, Engraving Machine, Sawing Machine, Lathe, Drilling Machine, Milling Machine, Shot Blasting Machine, Coating Equipment
QA/QC inspectors1 people
Inspection Type for Finished Products100% inspection(Visual inspection & Function inspection)
Inspection Method for Finished ProductsHave instructions and uniformly followed
R&D Engineers5 people
Traceability of Raw MaterialsYes
Our Industry Experience & Global Business Record
Main MarketsSouth America, Europe, Southeast Asia/ Mideast, Africa, East Asia(Japan/ South Korea)
Number of Foreign Trading Staff2
Overseas Agent/BranchNo
New Products Launched in Last yearYes
Product Q&A
Q:Can the water cooled cables be customized?
A:
Yes, we can customize cables to meet your furnace requirements, including size, oxygen copper material, rubber material, cable head type, diameter, and length.
Q:What is the minimum order quantity?
A:
The minimum order quantity is 1 Set.
Q:How long is the average lead time?
A:
The lead time is within 15 workdays during the off-season, and 1-3 months during the peak season.
Q:What payment terms are accepted?
A:
We accept LC, T/T, D/P, PayPal, Western Union, and small-amount payment.
Q:Do you provide after-sales service?
A:
Yes, we provide online commissioning, maintenance for components, original spare parts at cost price, system overhaul, capacity upgrades, and employee training.
Send Inquiry
*To:
APS Induction Furnace (Taizhou) Co., Ltd.
APS Induction Furnace (Taizhou) Co., Ltd.*Content:
Supplier replies will be sent to your registered email
You may also like
Factory Industrial Heat Pipe Cooling Accessory Ore Melting Furnace Water Cooled Cable
US$200.00-5,000.00
1 Piece(MOQ)
Factory Industrial Heat Pipe Cooling Accessory Electric Melting Furnace Water Cooled Cable
US$200.00-5,000.00
1 Piece(MOQ)
Water Cooled Electrical Cable Power Cables for Induction Furnace Rubber Insulation
Negotiable
1 Piece(MOQ)
High Quality Water-Cooled Cables for High Current Heating Equipment in Industrial Furnaces
US$1,000.00-20,000.00
1 Set(MOQ)
Factory Customized Industrial Furnace Parts Ore Melting Accessory Cooled Water Cooling Cable
US$200.00-5,000.00
1 Piece(MOQ)
Custom Length Industrial Water Cooling Cable Supplier for Induction Furnace
US$100.00-1,000.00
1 Roll(MOQ)
Customized Industrial Water Cooled Cable for IGBT Induction Furnace
US$200.00-800.00
1 Piece(MOQ)
Premium Customized Water Cooling Cable for Induction Furnaces
US$100.00-550.00
1 Piece(MOQ)
Energy-Saving High Pressure Hose Water Cooling Power Cable for Foundry and Forging
US$100.00-1,000.00
1 Roll(MOQ)
Low Cost Water-Cooled Cables for Electric Arc Furnaces
US$1,000.00-20,000.00
1 Set(MOQ)
Flexible Water-Cooled Copper Cables for Electric Arc Furnaces for Sale
US$1,000.00-20,000.00
1 Set(MOQ)
High Flexibility High-Purity Hollow Copper Water Cooled Cable for Electric Furnace
US$100.00-1,000.00
1 Roll(MOQ)
Durable Water Cooled Cable Designed for High-Temperature Furnaces
US$100.00-500.00
1 Piece(MOQ)
Rongke High-Performance Water-Cooled Cable for Efficient Heat Dissipation
US$200.00-100,000.00
1 pcs(MOQ)
Customized Water Cooling Cable for Steel Aluminum Copper Melting
US$100.00-1,000.00
1 Roll(MOQ)
Customized High-Performance Flexible Water-Cooled Cable
US$1,000.00-20,000.00
1 Set(MOQ)
Water-Cooled Cables Metallurgical Heater Electric Arc Furnaces Water-Cooling Units Melting Furnace
US$5,000.00-20,000.00
1 Piece(MOQ)
AC45/112224/10000 Water Cooled High Current Cable for Electric Arc Furnace
US$500.00-5,000.00
1 Piece(MOQ)
Induction Furnace Water Cooled Cable
US$888.00
1 Piece(MOQ)
Premium Water-Cooled Cable System for Superior Cooling Solutions
US$200.00-1,000.00
1 pcs(MOQ)



















