SourcingAI
Try for free
Powered by Made-in-China.com
China High Quality Customized Forging Heating Red Copper Pipe
US$0.897
500 Pieces

Product profile

Customization

Available

Connection

Male

Shape

Equal

Head Code

Hexagon

Angle

90 Degree

Wall Thickness

Sch40

Material

Stainless Steel

Technics

Casting

Certification

DIN

Color

Customized

Original

China

Shipping Port

Qingdao,China

Delivery Detail

One Week Quick Push Fit Fitting

Trade Mark

at OEM ODM

Transport Package

PVC Bag and Carton Box

Specification

CE SGS ISO

Trademark

AT

Origin

China

HS Code

73269090

Production Capacity

1500000

Key features

Customizable Color: Can custom-made any color to meet specific requirements.
OEM/ODM Support: Accepts OEM and ODM services for customized products.
Multiple Material Options: Available in Brass and Stainless Steel 304.
Wide Size Range: Pipe diameters available in 16/19/22/25mm.
Professional Finishing: Offers Polish and CP finishing options.
Quality Assurance: 100% quality manufacturing with complete testing services.
Flexible Packaging: Options from bulk to retail ready, 100 pcs/CTN.
Competitive Pricing: Extremely competitive pricing with flexible payment options.

Company profile

A&T Industry Co., Ltd.
A&T Industry Co., Ltd.Shandong, China
Business Type: Manufacturer/Factory, Trading CompanyExport Year: 2009-06-03 CertifiedNearest Port: Qingdao PortAverage Response Time: >24h CertifiedTerms of Payment: T/T CertifiedInternational Commercial Terms(Incoterms): FOB, CIF, CFR

AI-Powered supplier vetting

SummaryA&T Industry Co., Ltd. is a China-based trading company established in 2009, with six employees and an address in Qingdao, Shandong. Its stated product scope covers castings, forgings, stampings, machined parts, plastics, and related industrial components. The supplier reports more than 10 production lines, 6–10 quality-control staff, and production capacities of 2,000 tons each for casting and forging and 500 tons for stamping. It states that it has self-operated import/export rights, serves multiple overseas regions, and accepts FOB, CIF, and CFR quotation terms. However, the records also identify the company as a trading company, while manufacturing capability and staffing information is inconsistent across slices. No certification records, formal after-sales policies, or clear R&D resources are provided. Customer evidence is limited to several 2025 shipments of car air fresheners involving two buyers.
R&D capabilityThe supplier reports total R&D-engineer experience of 1 year, while its product description lists multiple processes including casting, forging, machining, stamping, and injection molding. The limited stated R&D experience does not provide explicit evidence of strong innovation capability.
Production capacityThe records state more than 10 production lines, quality-control staffing of 6–10 people, and annual capacities of 2,000 tons for casting, 2,000 tons for forging, and 500 tons for stamping. However, the supplier is also classified as a trading company, so the information supports stated production coordination or access but does not clearly prove direct factory ownership.
Customization capabilityThe supplier lists tooling options, packaging options ranging from bulk to retail-ready, testing services, and a broad range of casting, forging, stamping, machining, and plastics processes. These details explicitly support the ability to offer varied product and packaging configurations.
Client casesThe records show 2025 shipments of gel-type car air fresheners to Pakistan involving KHURRUM ENTERPRISES and CAR CARE COMPANY. These are concrete buyer-linked transaction records, but they cover a narrow product category and only a small number of disclosed customers.

Product Q&A

Q:What is the lead time for mass production?
A:
Mass production takes 90 days after sample approval. The lead time includes general production and transportation time.
Q:What are the payment terms?
A:
We prefer 50% deposit and balance by T/T before sailing. For long-term customers, terms are negotiable, and T/T 30 days after sailing may be acceptable.
Q:How long does sea shipping take?
A:
It takes about 5 weeks to European ports plus 1 week customs clearance (6-7 weeks total). To US east coast is 2 weeks, and west coast is 3 weeks.
Q:Can we visit the factory?
A:
Yes, you are welcome to visit our partner factory by prior agreement.
Q:What is the sample lead time?
A:
Pattern takes 30-45 days after order. Sample takes 30 days after pattern finishing. This does not include transportation time.

Send Inquiry

*To:A&T Industry Co., Ltd.A&T Industry Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

Customized Forging Heating Red Copper Pipe
Made-in-China.com
Pipe Fittings PP Elbow Pipe with Rectangular Shape
Made-in-China.com