SourcingAI
Try for free
Powered by Made-in-China.com
Carbon Steel ERW Square/Rectangular Welded Pipe with Cold Rolled
US$540.00
28-55 Tons
US$530.00
56-99 Tons
US$525.00
100+ Tons

Product profile

Customization

Available

After-sales Service

on-Line Techinal Support

Warranty

on-Line Techinal Support

Model NO.

pipe1

Type

Welded

Technique

ERW

Material

Carbon Steel

Surface Treatment

Black

Usage

Pipeline Transport, Boiler Pipe, Construction & Decoration

Section Shape

Square

Product Name

Hot DIP Galvanized Steel Pipe

Standard

ASTM, En, DIN, ANSI, BS

Surface

Galvanized Coating

Shape

Square Shape

Keyword

Black Steel Pipe

Pipe Material

Q235 / Q355

Pipe Type

Hot DIP Galivanized

MOQ

20 Tons

Zinc Coating

280g

Package

Standard Seaworthy Bundle

Ends

Straight Cut

Transport Package

Packing in Bundle by Steel Strip

Specification

48.6mm, Wt: 0.5-12mm

Trademark

Atlas

Origin

China, Tianjin

HS Code

7306610000

Production Capacity

100ton/Day

Key features

Excellent Corrosion Resistance: Zinc coating provides durability in outdoor and humid environments.
Customizable Length: Available in 5.8m, 6m, 12m or customized to specific requirements.
Wide Application Range: Suitable for water supply, gas transmission, construction, and fencing.
High Strength & Durability: Made from Q195, Q235B, Q355B carbon steel with robust performance.
Professional Quality Control: Includes pre-production samples and final inspection before shipment.
Fast Delivery Capability: Normal delivery time is 25-45 days after deposit or L/C receipt.
Flexible Payment Terms: Accepts 100% L/C at sight or T/T with 30% advance payment.

Company profile

Tianjin Atlas Scaffolding Co., Ltd
Importers and ExportersHigh Repeat Buyers ChoiceExhibition ExperienceFast Delivery
CertifiedBusiness Type: Trading Company CertifiedR&D Capacity: ODM Service AvailableExport Year: 2005-02-01Nearest Port: Tianjin,XingangAverage Response Time: ≤1.81hTerms of Payment: LC, T/T, PayPal, etc.

AI-Powered supplier vetting

SummaryTianjin Atlas Scaffolding Co., Ltd is a China-based manufacturer specializing in scaffolding products. With over 10 years of trade experience, it operates a single production line and serves various international markets. The company holds BSCI and ISO 9001 certifications but lacks significant innovation capabilities and financial performance indicators. It offers after-sales services but has no overseas warehousing or showroom capabilities, and does not provide OEM services for popular brands.
Supplier typeThe supplier is a manufacturer/factory based in Tianjin, China, specializing in industrial equipment and scaffolding products.
CertificationsThe supplier holds BSCI, ISO 9001, and QC 080000 certifications, indicating a commitment to quality management systems.
After-Sales capabilityThe supplier has a dedicated after-sales service department, indicating a structured approach to customer service.
Financial creditThe supplier's financial records show zero operating revenue and profits for the past years, raising concerns about its financial health.
R&D capabilityThe supplier has no R&D capability with SDK availability and employs less than five R&D engineers, suggesting limited innovation capability.
Customization capabilityThe supplier does not offer OEM services for popular brands, limiting its customization capabilities.
Client casesThe supplier has extensive international trade experience and serves markets in South America, the Mid East, Southeast Asia, and Africa, with customer praise for quality and service.

Product Q&A

Q:Are you a factory or a trading company?
A:
Our company has a steel base, one-stop procurement, good price, excellent quality, fast delivery ,we not only have our own factories but also have shares in some other enterprises.
Q:Can you provide samples?
A:
Yes, if the sample is available in stock.
Q:Can you arrange the shipment?
A:
Sure, we have permanent freight forwarder who can gain the best price from most ship company and offer professional service.
Q:What is the delivery time?
A:
It is based on the order, normally 25-45 days after receiving the deposit or L/C at sight.
Q:Do you have quality control?
A:
Always a pre-production sample before mass production;Always final Inspection before shipment;

Send Inquiry

*To:Tianjin Atlas Scaffolding Co., LtdTianjin Atlas Scaffolding Co., Ltd
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

En 10219 ASTM A500 Welded ERW Steel Pipe

En 10219 ASTM A500 Welded ERW Steel Pipe

US$500.00-800.00
10 Tons(MOQ)
Made-in-China.com