SourcingAI
Try for free
Powered by Made-in-China.com
150kg 4000mm Aluminum Self-Propelled Quick-Change Order Picker with Platform (FOP)
US$4,500.00-7,500.00
1 Piece

Product specifications

FOP

Product profile

Customization

Available

After-sales Service

Free Spare Parts

Warranty

12 Month

Model NO.

FOP

Cab Location

Adjustable

Type

Warehouse Order Picker

Power

DC Motor

Load Capacity

≤1T

Fuel

Electric

Load center

500mm

Lift height

3000~5000mm

Condition

New

Standard Color

Orange/Yellow

Lifting Height in M

2.7m/3.3m/4m/4.5m

Lifting Height in mm

2700mm/3300mm/4000mm/4500mm

Lifting Height in FT

106"/130"/157"/177"

Capcity

300kg

Drive Mode

Electric

Lifting Mode

Electric

Battery Capacity

24V/120ah

Charger

24V/10ah

Transport Package

Bubble Bag

Specification

1700X800X2000MM

Trademark

OEM/ODM/ATOMOVING

Origin

China

HS Code

8427109000

Production Capacity

5000PCS/Year

Key features

Aerospace-grade aluminum construction reduces structural weight to approximately one-third of equivalent steel cages, increasing net cargo capacity.
FOP3 and FOP4 model variants deliver maximum platform heights of 3000mm and 4000mm with working heights of 4125mm and 5125mm respectively.
Gravity-feed shelves feature a 4-degree backward pitch to secure inventory during high-speed travel and prevent fall hazards during order picking operations.
height, anti-slip grip tape, anti-tip brackets, and ergonomic design to minimize the risk of accidents. Matched deck eliminates a trip hazard when operator transitions between OP machine and platform.
695x720mm standing platform supports 150kg operator load, complemented by a 550x740mm lattice platform with 90kg capacity and 480mm travel range.
Modular 14-inch runner centers accommodate adjustable 15-inch and 30-inch deep shelves for rapid planogram adaptation and flexible picking configurations.

Company profile

CertifiedBusiness Type: Trading CompanyExport Year: 2012-07-10Nearest Port: NINGBO, SHANGHAIAverage Response Time: ≤1.57hTerms of Payment: LC, T/T, Western UnionInternational Commercial Terms(Incoterms): FOB, EXW, CFR, CIF, DDP, FCA

About Our Factory & Business Background

AddressRoom 401, Building a, No. 1 Liansheng Rd, Yuhang District, Hangzhou, Zhejiang, China
Plant Area25 square meters
Registered Capital1,000,000 RMB
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: within 15 workdays

Our Production Capability & Technical Expertise

Main Productsorder picker, scissor lift, shop crane, forklift, pallet stacker, Aluminum lifting machine

Our Industry Experience & Global Business Record

Year of Establishment2026-06-05
Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe

Product Q&A

Q:what's the leading time
A:
usually within 15 days , in busy season, 30 days for standard model
Q:is color can be choose?
A:
our standard color is yellow or orange. If you have other request, can talk in detail
Q:Can I put my own Logo?
A:
Yes, please send us your Logo file, we can do as your request
Q:What's the voltage?
A:
The charger can cover 110~220V and Plug will do as your countries standard

Send Inquiry

*To:Hangzhou Atomoving Machinery Co., Ltd
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

300kg Self-Propelled Powered Electric Order Picker
Made-in-China.com
300kg Capacity Self Propelled Order Picker

300kg Capacity Self Propelled Order Picker

US$2,200.00-2,300.00
1 Piece(MOQ)
Made-in-China.com