Powered by Made-in-China.com
Strong Mast Quick-Change Order Picking Platform 150kg for Lift Trucks
US$4,500.00-7,500.00
1 Piece
Product specifications
FOP
Product profile
Customization
AvailableAfter-sales Service
Free Spare PartsWarranty
12 MonthModel NO.
FOPCab Location
AdjustableType
Warehouse Order PickerPower
DC MotorLoad Capacity
≤1TFuel
ElectricLoad center
500mmLift height
3000~5000mmCondition
NewStandard Color
Orange/YellowLifting Height in M
2.7m/3.3m/4m/4.5mLifting Height in mm
2700mm/3300mm/4000mm/4500mmLifting Height in FT
106"/130"/157"/177"Capcity
300kgDrive Mode
ElectricLifting Mode
ElectricBattery Capacity
24V/120ahCharger
24V/10ahTransport Package
Bubble BagSpecification
1700X800X2000MMTrademark
OEM/ODM/ATOMOVINGOrigin
ChinaHS Code
8427109000Production Capacity
5000PCS/YearKey features
Aerospace-grade aluminum construction reduces structural weight to approximately one-third of equivalent steel cages, increasing net cargo capacity.
FOP3 and FOP4 model variants deliver maximum platform heights of 3000mm and 4000mm with working heights of 4125mm and 5125mm respectively.
Industrial aerospace-grade aluminum construction reduces tare weight to approximately 33 percent of equivalent steel cages for increased net payload capacity.
height, anti-slip grip tape, anti-tip brackets, and ergonomic design to minimize the risk of accidents. Matched deck eliminates a trip hazard when operator transitions between OP machine and platform.
Company profile
CertifiedBusiness Type: Trading Company CertifiedR&D Capacity: ODM Service AvailableExport Year: 2012-07-10Nearest Port: NINGBO, SHANGHAIAverage Response Time: ≤0.36hTerms of Payment: LC, T/T, Western Union
About Our Factory & Business Background
AddressRoom 401, Building a, No. 1 Liansheng Rd, Yuhang District, Hangzhou, Zhejiang, China
Plant Area25 square meters
International Commercial Terms(Incoterms)FOB, EXW, CFR, CIF, DDP, FCA
Average Lead TimePeak Season Lead Time: within 15 workdays, one month Off Season Lead Time: within 15 workdays, one month
Our Production Capability & Technical Expertise
Main ProductsMaterial Handling Equipment (Drum Truck, Pallet Stacker, Pallet Truck, Lift Tables, Scissor Lift, Forklift And Parts)
Our Industry Experience & Global Business Record
Year of Establishment2026-06-05
Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe
Product Q&A
Q:what's the leading time
A:
usually within 15 days , in busy season, 30 days for standard model
Q:is color can be choose?
A:
our standard color is yellow or orange. If you have other request, can talk in detail
Q:Can I put my own Logo?
A:
Yes, please send us your Logo file, we can do as your request
Q:What's the voltage?
A:
The charger can cover 110~220V and Plug will do as your countries standard
Send Inquiry
*To:Hangzhou Atomoving Machinery Co., Ltd
*Content:
Supplier replies will be sent to your registered email
You may also like
Hell Scissor Lift 7500mm 9000mm Self-Propelled Aluminium Work Platform for Warehouse Hydraulic Scissor Lift
US$4,385.00-4,538.00
1 unit(MOQ)
Portable CE Aluminium Alloy Single Mast Manual Lift Aerial Work Platform
US$350.00-860.00
1 Piece(MOQ)
Hangcha Factory Outlet 20m Electric Articulating Boom Lift - Zero Emission & 230kg Platform for High-Level Industrial Maintenance
US$25,000.00-49,000.00
1 Piece(MOQ)
300kg Narrow Aisle High-Lift Platform Full Electric Order Pick
US$2,000.00-3,500.00
1 unit(MOQ)
Battery Powered Platform Truck for Warehouse Logistics
US$1,800.00-6,000.00
1 Piece(MOQ)
Fully Electric Order Picker 1000kg 3000mm Max. Lifting Height Hydraulic Lift Platform
US$5,000.00-11,000.00
1 unit(MOQ)
Hell Self Propelled Scissor Lift Platform 5ookg 80okg Load Capacity Aerial Work Platform CE for Warehouse Hydraulic Scissor Lift
US$1,849.00-1,899.00
1 Piece(MOQ)
Mast Climbing Work Platform Lift Elevator Aluminium Alloy Lift Work Platform
US$2,200.00-2,500.00
1 Piece(MOQ)
12m Scissor Lift: Heavy-Duty Aerial Work Platform for Precision Industrial and Construction Elevation Tasks.
US$8,000.00-20,000.00
1 Piece(MOQ)
6m 8m 10m 12m Electric Scissors Working Platform Mobile Hydraulic Scissor Lift Platform for Construction Aerial Work
US$2,999.00-3,200.00
1 unit(MOQ)
Versatile Heli Electric Hydraulic Lift Platform for Safe Elevation
US$9,900.00-47,071.00
1 Piece(MOQ)
Customizable Manual Platform Truck 500kg 1000kg Hydraulic Platform Manual Lifting
US$150.00
1 Piece(MOQ)
Man Lift Electric Working Table 8m 11.2m Boom Lifting Height 200kg Telescopic Aerial Work Platform for Sale
US$14,000.00-16,000.00
1 Piece(MOQ)
Customizable High Load Self-Propelled Aerial Work Platform High Quality Heli Factory Price for Factory Equipment Installation
US$1,849.00-1,899.00
1 Piece(MOQ)
High Quality CE Aluminium Manual Lift Alloy Platform Mobile
US$350.00-860.00
1 Piece(MOQ)
Self-Loading Electric Scissor Lift Tables Four-Wheel Hydraulic Lifting Platform for Truck and Car Use OEM Customizable
US$80.00-3,000.00
2 Pieces(MOQ)
Factory Price 9-26m Articulated Self-Propelled Lifing Platform for Working Needs
US$18,000.00-28,000.00
1 Piece(MOQ)



















