Powered by Made-in-China.com
Premium Aluminized Steel Exhaust Pipe and Muffler Material
US$800.00-1,000.00
1 Ton
Sample price:US$1000.00/ton.Request sample
Product profile
After-sales Service
According to The ContractWarranty
One YearStandard
ASTM, JIS, GB, AISI, DIN, BSModel NO.
SA1C SA1D DX51D+AS DX51D+53DnASTM A 525, EN 10143Certification
ISO, RoHSSurface Treatment
CoatedTechnique
Cold RolledApplication
Boiler PlateEdge
Slit Edge/MillStock
StockSample
AvailableCustomization
AvailableMOQ
1.5 Tons/One for Normal SizeProduction Time
Within 7 DaysTransport Package
Wooden Pallets with Water-Proof PaperSpecification
CustomizedOrigin
ChinaHS Code
7210690000Production Capacity
50000 Tons/YearKey features
15+ Years Experience: Over 15 years of expertise in steel business and manufacturing.
ISO & SGS Certified: Certified by ISO14001 and SGS for quality management systems.
Fast Production: Production time within 7 days after order confirmation.
Free Samples: Free samples available for testing; buyer pays freight.
100% Quality Inspection: 100% self-inspection before packing to ensure quality.
Global Export Experience: Exported to USA, Australia, Japan, Russia, Brazil, and more.
Quick Response: Email replies within 8 hours for professional support.
Customization Available: Customization and samples are available for normal sizes.
Company profile
Business Type: Manufacturer/FactoryAverage Response Time: ≤1.99h
AI-Powered supplier vetting
SummaryThe supplier is a small limited company with three employees, offering Spring Steel Cold Coin and a broad range of hardware, building-material, ceramic, automotive, motorcycle, timber, packaging, and related products. It has flexible customization capability but no ODM service, popular-brand OEM capability, SDK, overseas warehouse, overseas showroom, overseas agent or branch, or in-stock service capacity. The supplier reports one year of export experience and lead times of within 15 working days to one month. Its service controls include 10 qualified suppliers and relevant records, but no written assessment procedure or corrective/preventive-action procedures. Quality-assurance, traceability, fire-drill, and environmental-assessment statuses are unknown, while quality-control test equipment is listed as zero. A TUV Rheinland audit is recorded, but the audit result is listed as 0; the stated report validity ended on 2025-10-14. No evidence of customer cases or offline trade-show participation is provided.
After-Sales capabilityThe supplier has 10 qualified service-capability suppliers and accepts FOB, CIF, CFR, LC, and T/T terms, but it has no overseas warehouse, showroom, overseas agent or branch, or in-stock service capacity. Complaint handling is recorded as “Others,” without a defined method, while quality-assurance and traceability statuses are unknown.
R&D capabilityThe supplier launched no new products during the past year and does not provide ODM services, popular-brand OEM services, or an SDK. One R&D engineer is listed, whose responsibility is to handle product photos, so the available evidence does not demonstrate substantive product-development capability.
Production capacityThe supplier has three employees, no in-stock capability, and no overseas service infrastructure. Reported lead times are within 15 working days to one month in both off-season and peak season, but quality-control test equipment is listed as zero and formal service corrective/preventive-action procedures are absent.
Customization capabilityThe supplier explicitly states that it provides flexible customization. This is direct evidence of customization availability, although no details are provided regarding customization scope, tooling, technical support, or delivery impact.
Product Q&A
Q:How many countries have you exported to?
A:
We have exported to several countries including America, Australia, South Africa, Pakistan, India, Japan, Russia, Saudi Arabia, and Brazil.
Q:How long is the production time?
A:
Once we receive your order, we proceed ASAP. The production time is within 7 days.
Q:Can I get a sample for testing?
A:
Yes, free samples are available. You only need to pay the freight cost.
Q:Do you inspect products before packing?
A:
Yes, we perform 100% self-inspection on all products as quality is our first priority.
Q:Can I visit your factory before ordering?
A:
Sure, we welcome customers to visit our factory. We take our customers seriously.
Send Inquiry
*To:Shanghai Baori Steel Industries Co., Ltd.
*Content:
Supplier replies will be sent to your registered email
You may also like
Durable High Heat Resistant Material for Exhaust Pipes
US$1,000.00-1,100.00
25 Tons(MOQ)
NBR Foam on One Side and One Side with NBR Coating Steel Material
US$4,800.00-5,500.00
1 Ton(MOQ)
FKM Coated Steel Coil Material for Refrigeration and Compressor Gasket
US$4,800.00-5,500.00
1 Ton(MOQ)
Prime and Low Price Steel Material Made by Runfei PPGI
US$810.00-820.00
50 Tons(MOQ)
Premium PPGI Building Materials with HDP Coating and Zinc Z30-Z275
US$714.90-863.90
25 Tons(MOQ)
Metal Stainless Steel Material with Bright Polished Surface
US$700.00-2,500.00
1 Ton(MOQ)
Raw Material of Computer Fittings|SS301/SS304 Precision Stainless Steel Coil
US$1,000.00-3,000.00
1 Ton(MOQ)
Stainless Steel 310S / EN1.4845 / SS310S Steel Coil Material
US$5,500.00-8,000.00
1 Ton(MOQ)
Wear Resistant Steel Coil Material to Middle East Market
US$950.00-3,100.00
1 Ton(MOQ)
Stainless Steel Material 304/En1.4301, 316/En 1.4401, 321/En 1.4541 for Metal Corrugated Flexible Hose with Braiding
US$1,150.00-2,800.00
1 Ton(MOQ)
Stainless Steel Material 304/En1.4301, 316/1.4401, 321/En1.4541 for Movable Union Metal Watering Hose Connector
US$1,150.00-2,800.00
1 Ton(MOQ)
0.12-6.0mm Thickness Steel Coil Used for Automotive Gasket Material Sheet
US$700.00-3,000.00
1 Ton(MOQ)
Wood Metal Cutting Band Saw Blade Material of Steel Strips Sk5/Sk85
US$700.00-3,000.00
1 Ton(MOQ)
Galvanized Steel Coil Galvanized Zin 40-300G/M2 Stainless Steel Building Material
US$770.00-900.00
10 Tons(MOQ)
Spring Steel Raw Material for Band Saw Blade
US$1,000.00-1,500.00
1 Ton(MOQ)
Premium Raw Materials for Durable Saw Blade Manufacturing
US$1,060.00-1,850.00
1 Ton(MOQ)
High Strength Stainless Metal Building Material Zinc Coated Galvanized Gi Steel Strip Roll
US$400.00-600.00
25 Tons(MOQ)
Galvanized Stainless Steel and Building Material for Outdoor Construction Strips
US$570.00
100 Tons(MOQ)



















