SourcingAI
Try for free
Powered by Made-in-China.com
Folding Scaffold Wheels with Durable PVC and Locking Casters
US$13.00
100-499 Sets
US$12.00
500-999 Sets
US$11.00
1,000+ Sets

Product profile

Material

Steel

Type

Costors

Caster Material

PVC

Model NO.

21.5cm/H

One Group

Four

Dedicated

Folding Scaffolding

Weight

425g

Diameter of The Steel Pipe

3cm

Wheel Diameter

9.5cm

Certification

CE

Surface Treatment

Yes

After-Sales Service

Accept Customization

Application

Folding Scaffolding

Technics

Welding After Casting

Transport Package

Woven Bags

Specification

21.5cm/H

Trademark

Rongxing brand

Origin

China Hebei

Production Capacity

100000pieces/Year

Key features

Durable PVC Material: Caster material is made of high-quality PVC for enhanced durability.
Integrated Braking System: Equipped with dependable brakes for added security and stability during work.
Complete Set of Four: Each set includes four top-tier casters designed for effortless transportation.
Robust Welding Process: Manufactured with a reliable welding process ensuring exceptional strength.
CE Certified: Product meets CE certification standards for safety and quality assurance.
Lightweight Design: Weighs only 425g per caster for easy handling and mobility.
Customization Available: Accepts customization options based on specific samples or requirements.
Fast Lead Time: Average lead time within 15 workdays for both peak and off-peak seasons.

Company profile

Hebei Qisheng Metal Products Co., Ltd.
High Repeat Buyers ChoiceQuality AssuranceQA/QC Inspectors
CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedCustomization Options: Customization from Samples CertifiedExport Year: 1 Year CertifiedNearest Port: Tianjin PortAverage Response Time: ≤3.64h CertifiedTerms of Payment: LC, T/T, D/P, etc.

AI-Powered supplier vetting

SummaryXianxian Rongxing Scaffolding Factory was established in 2010 and manufactures and sells safety ladders, scaffolding and related metal construction products. Its facilities include laser cutting, welding and stamping equipment, with one production line and fewer than five quality-control staff. It supports customization from samples and reports a lead time of within 15 working days during off-peak periods. However, its service-management practices are weakly documented: complaint handling and corrective/preventive actions have no written procedures or records. No supplier-management certification, overseas warehouse, overseas showroom, overseas agent or branch, offline trade-show participation, recent new-product development, ODM, SDK, or well-known-brand OEM capability is reported. The available financial information is limited to year labels without substantive financial metrics, so credibility cannot be assessed. The supplier states that it has cooperative relationships with major domestic and foreign...
Supplier typeThe supplier is identified as a manufacturing and sales enterprise focused on scaffolding and related construction metal products. Its stated scope includes metal-structure manufacturing, fastener manufacturing, metal-product sales and repair, surface treatment, and related construction fittings.
CertificationsThe supplier-management-system certification field is explicitly recorded as NIL. No certification is evidenced in the provided information.
After-Sales capabilityThe supplier has relevant service records and has provided some approved-supplier names, but it has no written procedures or records for corrective/preventive actions or effective complaint handling. It also reports no overseas warehouse, showroom, agent, branch, or offline trade-show participation, limiting evidence of structured after-sales and overseas service support.
R&D capabilityThe supplier reports no new products during the past year, no ODM service, no SDK, and no OEM work for well-known brands. Although it has one R&D engineer and describes cooperation on new products and projects, the explicit capability indicators show limited demonstrated innovation capacity.
Production capacityThe supplier operates laser-cutting, welding and stamping equipment, one production line, and reports scaffolding output information and fewer than five quality-control staff. Its stated lead time is within 15 working days during off-peak periods, providing evidence of operating production capacity, although the limited line and QC staffing indicate a relatively small-scale operation.
Customization capabilityThe supplier explicitly offers customization from samples and states that it works to improve product quality and performance. This supports sample-based customization, but no broader engineering, design-process, or tooling details are provided.

Product Q&A

Q:What is the minimum order quantity?
A:
The minimum order quantity is 10 sets.
Q:How long is the lead time?
A:
The average lead time is within 15 workdays for both peak and off-peak seasons.
Q:Can I customize the product?
A:
Yes, we accept customization from samples.
Q:What payment methods do you accept?
A:
We accept LC, T/T, D/P, PayPal, Western Union, and small-amount payments.
Q:What is the material of the casters?
A:
The caster material is PVC, and the frame is made of steel.

Send Inquiry

*To:Hebei Qisheng Metal Products Co., Ltd.Hebei Qisheng Metal Products Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

Heavy Duty PU Caster Wheel with Brake for Scaffolding
Made-in-China.com
Caster Wheel

Caster Wheel

US$7.76-8.00
80 Pieces(MOQ)
Made-in-China.com
Scaffolding System Materials Shoring System Caster Wheel
Made-in-China.com