SourcingAI
Try for free
Powered by Made-in-China.com
Bst-1800A Servo-Driven Pet Preform Injection Molding Machine for Continuous High-Output Operation
US$21,000.00-23,000.00
1 Piece

Product profile

Customization

Available

Warranty

1 Year

Type

Preform Injection

Model NO.

BST - 1800A

Structure

Horizontal

Plastic Type

Thermoplastic

Plasticizing Way

Screw Type

Clamping Way

Hydraulic

Automation

Automatic

Computerized

Computerized

HS Code

8477101000

Production Capacity

10 Sets Per Month

Key features

12-Month Warranty Coverage: Free spare parts replacement for mechanical, hydraulic, and electric components within 12 months.
Multi-Language Control Interface: TECHMATION microcomputer supports Chinese, English, Russian, Spanish, French, and Arabic.
Advanced Safety Mechanism: Electrical and mechanical double safety devices ensure the mold only clamps when the door is closed.
Flexible Operation Modes: Supports manual, semi-automatic, and fully automatic modes with slope setting for smooth movement.
High Precision Injection: Screw design generates 60-90% melting heat via friction, ensuring precise shot weight and part quality.
Global After-Sales Support: Includes free training, online service, and optional abroad installation with engineer dispatch.
Customization Options: Offers full customization, minor customization, and flexible customization from samples or designs.
Secure Packaging & Shipping: Anti-rust process and stable container fixing ensure no damage during ocean shipment.

Company profile

Zhangjiagang City Best Machinery Co., Ltd.
Years of Export ExperienceSelf-brandedExhibition ExperienceCustomization from Samples
CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedR&D Capacity: ODM Service Available CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc. CertifiedExport Year: 13 Years CertifiedNearest Port: Shanghai PortAverage Response Time: ≤7.29h

About Our Factory & Business Background

AddressNo.2 Dongli Road, Donglai Town, Zhangjiagang City, Suzhou, Jiangsu, China
Plant Area1156 square meters
Number of Employees10
Registered Capital2,000,000 RMB
Terms of PaymentLC, T/T
International Commercial Terms(Incoterms)FOB, CIF, EXW
Average Lead TimePeak Season Lead Time: 1-3 months Off Season Lead Time: 1-3 months
Minimum Order Quantity1 Pc
Supply Chain Partners15

Our Production Capability & Technical Expertise

Main ProductsInjection Molding Machine
Production Lines1
Production MachinesAssembly Line
QA/QC inspectors1 people
Inspection Type for Finished Products100% inspection(Visual inspection & Function inspection)
Inspection Method for Finished ProductsHave instructions and uniformly followed
R&D Engineers1 people
Traceability of Raw MaterialsYes
Own BrandYes

Our Industry Experience & Global Business Record

Year of Establishment2010-03-17
Main MarketsAfrica
Repeat Buyers Choice10%~30%
Number of Foreign Trading Staff4
Overseas Agent/BranchNo
New Products Launched in Last yearYes

Our Certifications, Standards & Industry Recognition

Cooperated with Fortune 500No

Product Q&A

Q:Are you a manufacturer or trading company?
A:
We are the source factory of plastic machines and moulds.
Q:How to choose injection molding machine?
A:
The injection weight should be about 1.2* product's weight. The tie-bar space should be bigger than the mold dimension. Contact with us for more information.
Q:How to pay?
A:
40% deposit T/T in advance and 60% payment by T/T or L/C before delivery.
Q:Is it possible to send engineer to install and commission machine, even train our workers?
A:
Yes, we can send our engineer to your factory for installation and training. We have some engineers flying among different countries for after sales service and technical support. Please note that all cost happened for visa, travel, hotel should be paid in advance by customers. In addition, we cannot guarantee each visa is successful.
Q:If we buy your machines, is there any warranty?
A:
Yes, definitely. 12-months warranty after shipment for mechanical parts, hydraulic parts, electric components (the screw just has 6-months). We are responsible for broken parts within 12-months. We will supply those parts for free but the possible transportation cost should be paid by clients.

Send Inquiry

*To:Zhangjiagang City Best Machinery Co., Ltd.Zhangjiagang City Best Machinery Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like