SourcingAI
Try for free
Powered by Made-in-China.com
Full-Automatic Bottle Handle Injection Molding Machine - Industrial-Grade High-Efficiency Production Machine
US$15,214.00
1-2 Pieces
US$15,000.00
3+ Pieces

Product specifications

BST-1320A

Product profile

Customization

Available

After-sales Service

1 Year

Warranty

1 Year

Model NO.

BST-1320A

Type

Preform Injection

Structure

Horizontal

Plastic Type

Thermoplastic

Plasticizing Way

Screw Type

Clamping Way

Mechanical

Automation

Automatic

Computerized

Computerized

Certification

No

Screw Diamater

38mm

Shot Weight

188g

L/D

22.8

Screw Speed

0-190 r.p.m

Clamp Tonnage

1320kN

Space Between Tie-Bars

410X375mm

Ejector Number

5

Machine Dimension

4.5X1.6X1.7

Machine Weight

3.9t

Transport Package

Simple Stretch Film Packing

Specification

6.5T

Trademark

BEST MACHINE

Origin

China

HS Code

8477101000

Production Capacity

10/Month

Key features

Comprehensive Warranty Coverage: 12-months warranty for mechanical, hydraulic, and electric parts; 6-months for screws.
Professional Installation & Training: Engineers sent for installation, commissioning, and worker training (5-15 days).
Flexible Customization Options: Full customization, minor customization, and customization from samples or designs available.
Wide Application Range: Suitable for automotive, electronics, packaging, medical, and aerospace industries.
High Efficiency Production: Automatic operation with screw type plasticizing and mechanical clamping for high output.
Global Export Experience: Exporting to over 50 countries including USA, Russia, and South Africa for 13 years.
Complete Production Line Support: Includes auto loader, dryer, chiller, crusher, and mixer for full process automation.
Quality Assurance Inspection: 100% visual and function inspection for all finished products before delivery.

Company profile

Zhangjiagang City Best Machinery Co., Ltd.
Years of Export ExperienceSelf-brandedExhibition ExperienceCustomization from Samples
CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedR&D Capacity: ODM Service Available CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc. CertifiedExport Year: 13 Years CertifiedNearest Port: Shanghai PortAverage Response Time: ≤7.32h

About Our Factory & Business Background

AddressNo.2 Dongli Road, Donglai Town, Zhangjiagang City, Suzhou, Jiangsu, China
Plant Area1156 square meters
Number of Employees10
Registered Capital2,000,000 RMB
Terms of PaymentLC, T/T
International Commercial Terms(Incoterms)FOB, CIF, EXW
Average Lead TimePeak Season Lead Time: 1-3 months Off Season Lead Time: 1-3 months
Minimum Order Quantity1 Pc
Supply Chain Partners15

Our Production Capability & Technical Expertise

Main ProductsInjection Molding Machine
Production Lines1
Production MachinesAssembly Line
QA/QC inspectors1 people
Inspection Type for Finished Products100% inspection(Visual inspection & Function inspection)
Inspection Method for Finished ProductsHave instructions and uniformly followed
R&D Engineers1 people
Traceability of Raw MaterialsYes
Own BrandYes

Our Industry Experience & Global Business Record

Year of Establishment2010-03-17
Main MarketsAfrica
Repeat Buyers Choice10%~30%
Number of Foreign Trading Staff4
Overseas Agent/BranchNo
New Products Launched in Last yearYes

Our Certifications, Standards & Industry Recognition

Cooperated with Fortune 500No

Product Q&A

Q:Are you a manufacturer or trading company?
A:
We are a factory for plastic machines and moulds.
Q:How to pay?
A:
40% deposit T/T in advance, the balance 60% payment by T/T or L/C before delivery.
Q:How to choose injection molding machine?
A:
The injection weight should be about 1.2* product's weight. The tie-bar space should be bigger than the mold dimension. Contact with us for more information.
Q:If we buy your machines, is there any warranty?
A:
Yes, definitely. 12-months warranty after shipment for mechanical parts, hydraulic parts, electric components (The screw just has 6-months). We are responsible for broken parts within 12-months. We will supply those parts for free but the possible transportation cost should be paid by clients.
Q:Is it possible to send engineer to install and commission machine, even train our workers? How do I place an order?
A:
Yes, we can send our engineer to your factory for installation, commissioning, training. We have some engineers flying among different countries for after sales service and technical support. As per experience, if everything OK usually 5-15 days is enough. Therefore, we need you to prepare invitation letter for visa before shipment. However, please be noted that all cost happened for visa, travel, hotel should be paid in advance by customers. In addition, we cannot guarantee each visa is success

Send Inquiry

*To:Zhangjiagang City Best Machinery Co., Ltd.Zhangjiagang City Best Machinery Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like