SourcingAI
Try for free
Powered by Made-in-China.com
Reduced Cycle Time Preform Injection&Preform Manufacturer Making Injection Molding Machine
US$21,143.00-100,000.00
1 Piece

Product profile

Customization

Available

After-sales Service

20years

Warranty

2years

Model NO.

BST-1800A

Type

Preform Injection

Structure

Horizontal

Plastic Type

Thermoplastic

Plasticizing Way

Screw Type

Clamping Way

Hydraulic & Mechanical

Automation

Automatic

Computerized

Computerized

Certification

CE, ISO9001:2008, GMP, QS

Transport Package

Sea

Specification

5.5t

Trademark

Best Machine

Origin

Zhangjiagang

HS Code

8477101000

Production Capacity

10 Sets Per Month

Key features

2-Year Warranty Coverage: Covers mechanical, hydraulic, and electric parts for 12 months; screw covered for 6 months.
Multi-Language Interface: Supports Chinese, English, Russian, Spanish, French, and Arabic on the control system.
Advanced Microcomputer Control: TECHMATION system with large LCD, automatic alarm, and 100-set mold parameter storage.
Flexible Customization Options: Offers full, minor, and sample-based customization for designs and specifications.
Global Installation Support: Engineers available for on-site installation, commissioning, and training abroad.
High Precision Clamping: 5-point double-elbow mechanism with chrome-plated pull rods for stable high-speed operation.
Comprehensive Safety Features: Double electrical and mechanical safety door prevents clamping when open.
Efficient Production Mode: Supports manual, semi-automatic, and fully automatic modes with slope setting functions.

Company profile

Zhangjiagang City Best Machinery Co., Ltd.
Years of Export ExperienceSelf-brandedExhibition ExperienceCustomization from Samples
CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedR&D Capacity: ODM Service Available CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc. CertifiedExport Year: 13 Years CertifiedNearest Port: Shanghai PortAverage Response Time: ≤7.70h

About Our Factory & Business Background

AddressNo.2 Dongli Road, Donglai Town, Zhangjiagang City, Suzhou, Jiangsu, China
Plant Area1156 square meters
Number of Employees10
Registered Capital2,000,000 RMB
Terms of PaymentLC, T/T
International Commercial Terms(Incoterms)FOB, CIF, EXW
Average Lead TimePeak Season Lead Time: 1-3 months Off Season Lead Time: 1-3 months
Minimum Order Quantity1 Pc
Supply Chain Partners15

Our Production Capability & Technical Expertise

Main ProductsInjection Molding Machine
Production Lines1
Production MachinesAssembly Line
QA/QC inspectors1 people
Inspection Type for Finished Products100% inspection(Visual inspection & Function inspection)
Inspection Method for Finished ProductsHave instructions and uniformly followed
R&D Engineers1 people
Traceability of Raw MaterialsYes
Own BrandYes

Our Industry Experience & Global Business Record

Year of Establishment2010-03-17
Main MarketsAfrica
Repeat Buyers Choice10%~30%
Number of Foreign Trading Staff4
Overseas Agent/BranchNo
New Products Launched in Last yearYes

Our Certifications, Standards & Industry Recognition

Cooperated with Fortune 500No

Product Q&A

Q:Are you a manufacturer or trading company?
A:
We are a factory for plastic machines and moulds.
Q:How to choose injection molding machine?
A:
The injection weight should be about 1.2* product's weight. The tie-bar space should be bigger than the mold dimension. contact with us for more information.
Q:How to pay?
A:
40% deposit T/T in advance, the balance 60% payment by T/T or L/C before delivery.
Q:Is it possible to send engineer to install and commission machine, even train our workers?
A:
Yes, we can send our engineer to vour factory for installation, commissioning, training. We have some engineers flyingamong different countries for after sales service and technical support. As per experience, if everything OK usually 5-15days is enough. Therefore, we need you to prepare invitation letter for visa before shipment. However, please be noted thatall cost happened for visa, travel, hotel should be paid in advance by customers. In addition, we cannot guarantee eachvisa is successful.
Q:If we buy your machines, is there any warranty?
A:
Yes, definitely. 12-months warranty after shipment for mechanical parts, hydraulic parts, electric components (The screwjust has 6-months). We are responsible for broken parts within 12-months. We will supply those parts for free but thepossible transportation cost should be paid by clients

Send Inquiry

*To:Zhangjiagang City Best Machinery Co., Ltd.Zhangjiagang City Best Machinery Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like