Powered by Made-in-China.com
API 7K Mud Pump Parts Through-Hole Full Open Valve Assembly
US$20.00-50.00
5 Pieces
Sample price:US$20.00/piece.Request sample
Product profile
Customization
AvailableAfter-sales Service
Online GuidanceWarranty
12 MonthsModel NO.
Full Open Valve AssemblyManufacturing Process
ForgingSurface Treatment
PolishingOperation Pressure
Atmospheric PressureMaterial
Alloy SteelColor
as RequiredCertificate
APIMachinery Test Report
ProvidedKeyword
Mud Pump Valve Body and SeatTransport Package
WoodenTrademark
BESTAllOrigin
ChinaHS Code
84314310Production Capacity
1500pieces/MonthKey features
High-Strength Alloy Steel: Made of 20CrMnTi alloy steel with HRC58+ hardness for superior durability.
Advanced Heat Treatment: Processed with advanced heat treatment to ensure high strength and toughness.
Wide Brand Compatibility: Compatible with BOMCO, LANSHI, QINGZHOU, HONGHUA, and many other major brands.
Full Customization Options: Offers full customization, minor customization, and design-based customization.
12-Month Warranty: Includes a comprehensive 12-month warranty period for peace of mind.
Online Technical Guidance: Provides online guidance support for installation and maintenance issues.
API Certification: Product meets API standards with provided machinery test reports.
Flexible Shipping Terms: Accepts EXW, FOB, CNF, CIF, DDU, and DDP terms for global delivery.
Company profile
Business Type: Manufacturer/Factory, Trading Company CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc. CertifiedExport Year: 7 years CertifiedNearest Port: Qingdao portAverage Response Time: ≤6.06h CertifiedTerms of Payment: LC, T/T, D/P, etc.
About Our Factory & Business Background
AddressNo. 38 Mengshan Road, Dongying District, Dongying, Shandong, China
Plant Area43 square meters
Number of Employees5
International Commercial Terms(Incoterms)FOB, CIF, CFR, EXW
Average Lead TimePeak Season Lead Time: within 15 workdays Off Season Lead Time: within 15 workdays
Minimum Order Quantity1
Supply Chain Partners20
Our Production Capability & Technical Expertise
Main ProductsPetroleum machinery accessories
R&D Engineers1 people
Our Industry Experience & Global Business Record
Year of Establishment2018-06-22
Main MarketsEurope, Southeast Asia/ Mideast
Repeat Buyers Choice80%~100%
Number of Foreign Trading Staff3
Overseas Agent/BranchNo
New Products Launched in Last yearNo
Our Certifications, Standards & Industry Recognition
Cooperated with Fortune 500No
Product Q&A
Q:How do you transport the goods?
A:
We transport the goods by container. We possess long-term cooperation with ship agencies which can provide you the lowest shipping fee. For samples, we can send by express.
Q:Can you satisfy my special requirement?
A:
Definitely! We have strong design capacity and R&D capacity to meet your specific needs.
Q:Which shipment terms can you accept?
A:
We accept EXW, FOB, CNF, CIF, DDU, and DDP terms.
Q:What is the warranty period?
A:
We provide a 12-month warranty for this product.
Q:Do you offer customization services?
A:
Yes, we offer full customization, minor customization, and customization from samples or designs.
Send Inquiry
*To:
DONGYING LIANHUI PETROLEUM TECHNOLOGY CO.,LTD
DONGYING LIANHUI PETROLEUM TECHNOLOGY CO.,LTD*Content:
Supplier replies will be sent to your registered email
You may also like
Mud Pump Four Web Valve Assy Drilling Rig Pump Full-Open Valve and Seat Factory
US$35.00-80.00
3 Pieces(MOQ)
API 8# Valve Assembly Pn 1560963 1560965 for 14p220 Mud Pump Spare Parts
US$100.00
1 Piece(MOQ)
Durable Mud Pump Valve Assembly Featuring Top-Quality Valves
US$30.00-80.00
1 Piece(MOQ)
Mud Pump Parts Featuring High-Quality Valve Assembly for Optimal Performance
US$30.00-80.00
1 Piece(MOQ)
API 7K 7V1 Mud Pump Parts Mud Pump Valve and Seat
US$29.00-75.00
3 Pieces(MOQ)
Valve Assembly for Mud Pump API-5#API-6#API-7#API-8# 7V1
US$20.00-80.00
1 Piece(MOQ)
Oil Field Nov Valve Assy Mud Pump Full Open Valve Seat Mud Pump Valve Assembly Bomco Valves
US$45.00-65.00
6 Pieces(MOQ)
Factory Price Drilling Mud Pump Spare Parts Full Open Mud Pump Valves Assembly
US$40.00-50.00
200 Pieces(MOQ)
F Series Drilling Equipment Mud Pump Valve Assembly7V1 Mud Pump Parts Valve
US$23.00-50.00
12 Pieces(MOQ)
API Standard Mud Pump Spare Parts Mud Pump Valve Assembly for Oil Drilling
US$20.00-50.00
5 Pieces(MOQ)
Factory Direct Sale API Mud Pump Spare Parts 4-Web Valve Assembly
US$20.00-50.00
5 Pieces(MOQ)
API Mud Pump P / F / Nb / Gd Series Valve Seat / Valve Body / Valve Assembly
US$10.00-80.00
2 Pieces(MOQ)
API Mud Pump Parts Valve Assembly for Oil Drilling
US$300.00-400.00
1 Piece(MOQ)
Triplex Mud Pump Parts /Valve Assembly/ Valve Seat / Valve Body
US$10.00-80.00
2 Pieces(MOQ)
Pz Ideco F1600 T-1600 Triplex Mud Pump Spare Parts Mud Pump Valve Assy Full Open Seat Mud Pump Valve
US$499.00-600.00
3 pieces(MOQ)
Full Open Seat Valve Assembly for Mud Pump Spare Parts
US$44.50-45.50
6 Pieces(MOQ)



















